USPHMSAFR-2026-10782ActualitésIn force

Pipeline Safety: Class Location Change Requirements; Correction

PHMSA issues a technical correction to clarify the 24-month deadline for implementing integrity management alternatives when gas transmission pipeline operators restore maximum allowable operating pressure following class location changes. The deadline runs from the later of the final rule's effective date or when the operator decides to initiate restoration, aligning with MAOP confirmation timelines.

Dernière modification il y a 4 mois.

Vue extraite pour la lecture · Original pour les preuves de conformité

PHMSA is making a technical correction to a January 14, 2026 final rule that amended the class location change requirements. The final rule allows an operator to confirm or to restore the maximum allowable operating pressure (MAOP) of an eligible gas transmission pipeline segment that experiences a class location change by implementing an integrity management (IM) alternative. For MAOP restorations, PHMSA is clarifying in this correction notice that the 24-month deadline for implementing the initial programmatic requirements of the IM alternative runs from the effective date of the final rule or the date that an operator decides to initiate an MAOP restoration, whichever is later. This clarification is consistent with the requirements in the final rule, including the deadline in the IM alternative that applies to MAOP confirmations, which runs from the effective date of the final rule or the date of the class location change, whichever is later.

Source

https://www.federalregister.gov/documents/2026/05/29/2026-10782/pipeline-safety-class-location-change-requirements-correction

Document officiel chez le régulateur. Citez toujours cette URL — et non la page de détail Vantage — dans les preuves de conformité.

Connexes dans United States