CACERCanadian Energy Regulator Act, s. 185Primary legislationIn force

Impact Assessment Act

Section 185 of the Canadian Energy Regulator Act transfers certificate application authority for designated projects under the Impact Assessment Act from the Commission to an independent review panel. The panel exercises powers under sections 182-184, coordinates with energy and environment ministers, and must submit reports within Impact Assessment Act timelines.

Dernière modification il y a 5 heures.

Vue extraite pour la lecture · Original pour les preuves de conformité

Impact Assessment Act

185 If the application for a certificate relates to a designated project, as defined in section 2 of the Impact Assessment Act, that is subject to an impact assessment under that Act, (a) the Commission’s powers, duties and functions under section 182, subsections 183(1) and (2) and section 184 are to be exercised and performed by a review panel established under subsection 47(1) of that Act; (b) in subsections 183(1) and 184(5), a reference to the Minister is to be read as a reference to the Minister and the Minister of the Environment; (c) the report referred to in subsection 183(1) is to be submitted within the time limit established under section 37.1 of that Act; (d) subsections 183(3) to (10) do not apply; and (e) subsection 189(1) applies with respect to the review panel.

Source

https://laws-lois.justice.gc.ca/eng/acts/C-15.1/section-185.html

Document officiel chez le régulateur. Citez toujours cette URL — et non la page de détail Vantage — dans les preuves de conformité.

Connexes dans Canada

CACNSCREGDOC-2.11.1GuidanceIn force

Waste Management, Volume I: Management of Radioactive Waste

REGDOC-2.11.1 establishes requirements and guidance for Canadian Nuclear Safety Commission licensees managing radioactive waste, including characterization, storage, and disposal facilities. The document applies to all CNSC licensees under the Nuclear Safety and Control Act and is complemented by CSA N292 standards for comprehensive radioactive waste management oversight.

il y a 5 heures
CACERCanadian Energy Regulator Act, s. 260Primary legislationIn force

Effect of election

Section 260 of the Canadian Energy Regulator Act establishes that filing an election under section 259 for international power lines prevents new permit issuance, converts pending applications to certificate applications, and revokes existing permits or certificates. Applicants or permit holders who file the election and are acquiring or leasing land become liable for all damages and reasonable costs incurred by landowners from abandonment of such acquisition or lease.

il y a 5 heures
CACNSCREGDOC-1.5.1GuidanceIn force

Application Guide: Certification of Radiation Devices or Class II Prescribed Equipment, Version 1.1

REGDOC-1.5.1 v1.1 is a Canadian Nuclear Safety Commission application guide helping applicants prepare and submit certification applications for radiation devices and Class II prescribed equipment. The guide ensures prescribed equipment is safe, protects public health and environment, meets national security standards, and complies with Canada's international nuclear obligations under the Nuclear Safety and Control Act.

il y a 5 heures
CACERCanadian Energy Regulator Act, s. 274Primary legislationIn force

Relocation

The Canadian Energy Regulator may order holders of international or interprovincial power line permits or certificates to relocate infrastructure when necessary to facilitate construction or relocation of other facilities. The regulator determines cost allocation between parties, requires mandatory consultation procedures, and may order reimbursement of reasonable costs incurred by persons making submissions.

il y a 5 heures
CACNSCREGDOC-1.1.1GuidanceIn force

Site Evaluation and Site Preparation for New Reactor Facilities, Version 1.3

REGDOC-1.1.1 establishes Canadian Nuclear Safety Commission requirements for site evaluation and preparation of new reactor facilities, including nuclear power plants and small modular reactors. Applicants must characterize sites, assess severe external events and multiple simultaneous accidents, and demonstrate adequate safety measures during site preparation and construction using a risk-informed, graded approach.

il y a 5 heures