Proposed refinements for Allocation Round 8 and future rounds
- From:
- Department for Energy Security and Net Zero
- Published
- 16 December 2025
- Last updated
- 6 July 2026 — See all updates
Applies to England, Scotland and Wales
Read the full outcome
Detail of outcome
Update: 6 July 2026
Following the response published on 1 June 2026, we are amending 2 policies ahead of the opening of Allocation Round 8, alongside further clarification on connection requirements.
An updated version of the government response to legislative proposals on proposed refinements for Allocation Round 8 and future rounds has been published, along with a revision note.
Government response to legislative proposals on proposed refinements for Allocation Round 8 and future rounds
Following the consultation, we will amend the Contracts for Difference (Allocation) Regulations 2014 to allow NESO to correct certain types of delivery body errors and to consider new documentary evidence or information when examining ‘Tier 1’ appeals in respect of non-qualifying applications.
The Allocation Regulations are also being amended to clarify the treatment of pending applications in light of operational experience from Allocation Round 7 (AR7) held in 2025.
Detail of feedback received
We received 79 responses to this part of the consultation, with the majority coming from industry (trade associations, renewables developers and supply chain companies) and a small number from public bodies, investors and individuals.
The overall stakeholder response was very positive, with high levels of support for several proposals.
Original consultation
Summary
We're seeking views on several refinements to ensure that the CfD continues to reflect current policy and that the scheme continues to function as originally intended.
This consultation ran from
10am on 16 December 2025
to
11:59pm on 30 January 2026
Consultation description
This consultation seeks views on proposed refinements to the Contracts for Difference (CfD) contract terms in advance of Allocation Round 8 (AR8). The proposals in this consultation cover a range of areas, including:
- policy on surrendered CfD capacity – making permanent the restriction on bidding previously surrendered capacity into future rounds to protect auction integrity and deployment timelines
- hybrid metering for single technology/ multiple commercial arrangements – enabling CfD and merchant assets of the same technology to share metering infrastructure, reducing costs
- contractual changes for floating offshore wind (FLOW) – extending the Longstop Period and reducing the Required Installed Capacity threshold to reflect the scale and complexity of future projects
- introducing a new technology category for Other Deepwater Offshore Wind (ODOW) – enabling innovative foundation designs for deepwater sites to compete for CfD support
- changes to improve scheme efficiency – proposed legislative amendments to allow the National Energy System Operator (NESO) to correct errors made during the assessment of CfD applications and consider new documentary evidence to clarify non-material errors and omissions in applications, and minor adjustments to improve administration of the pending applications process
- strengthening Unilateral Commercial Operations Notice (UCON) provisions – improving metering access and enforcement to prevent distribution-connected generators from delaying CfD start dates and operating on a merchant basis at elevated wholesale prices
- excluding applications with Gate 1 connection offers – aligning CfD eligibility with grid connection reforms to prioritise projects with firm connection dates
- visibility of sealed bids – changing our approach on the ability of the Secretary of State to see bids for AR8
- minor and technical changes to the CfD contract terms to update the CPI inflation factor and amend the definition of Inside Information
- in addition, to provide a policy update on fixing the appeals timeline
Together, these reforms are designed to maintain investor confidence, support timely delivery of renewable capacity, and ensure the CfD remains fit for purpose as projects scale up in size and complexity.
The proposed drafting changes are shown as tracked amendments in the CfD contract documents, published alongside the consultation document. We welcome responses from anyone with an interest in the proposals, in particular those considering participating in AR8.
Read our consultation privacy notice.
Documents
Proposed refinements for Allocation Round 8 and future rounds: consultation document
PDF, 374 KB, 41 pages
DRAFT: Contracts for Difference Allocation Round 8 (Phase 1): Agreement (Apportioned)
PDF, 365 KB, 49 pages
This file may not be suitable for users of assistive technology.
Request an accessible format.DRAFT: Contracts for Difference Allocation Round 8: Agreement (Generic)
PDF, 236 KB, 33 pages
This file may not be suitable for users of assistive technology.
Request an accessible format.DRAFT: Contracts for Difference Allocation Round 8: Standard Terms and Conditions
PDF, 3.9 MB, 592 pages
This file may not be suitable for users of assistive technology.
Request an accessible format.Share this page
The following links open in a new tab
Updates to this page
-
6 July 2026
We are amending 2 policies ahead of the opening of Allocation Round 8, alongside further clarification on connection requirements. An updated government response has been published alongside a revision note.
-
1 June 2026
Published the second part of the government response for this consultation.
-
20 March 2026
Published the first part of the government response for this consultation.
-
16 December 2025
First published.
Sign up for emails or print this page
Explore the topic
Is this page useful?
- Maybe
- Yes this page is useful
- No this page is not useful
Help us improve GOV.UK
Do not include personal or financial information like your National Insurance number or credit card details.
Help us improve GOV.UK
To help us improve GOV.UK, we’d like to know more about your visit today. Please fill in this survey (opens in a new tab and requires JavaScript).
CancelServices and information
- Benefits
- Births, death, marriages and care
- Business and self-employed
- Childcare and parenting
- Citizenship and living in the UK
- Crime, justice and the law
- Disabled people
- Driving and transport
- Education and learning
- Employing people
- Environment and countryside
- Housing and local services
- Money and tax
- Passports, travel and living abroad
- Visas and immigration
- Working, jobs and pensions
Support links
- Help
- Privacy
- Cookies
- Accessibility statement
- Contact
- Terms and conditions
- Rhestr o Wasanaethau Cymraeg
- Government Digital Service
Source
https://www.gov.uk/government/consultations/proposed-refinements-for-allocation-round-8-and-future-roundsCanonical document at the regulator. Always cite this URL — not the Vantage detail page — in compliance evidence.