CACERCanadian Energy Regulator Act, s. 385Primary legislationIn force

Show cause hearing relating to waste

Under the Canadian Energy Regulator Act, the Commission holds show cause hearings on applications by the Chief Conservation Officer regarding waste in oil and gas pool recovery. If waste is found, the Commission may order gas collection, processing, reinjection schemes, or pool repressurizing/recycling, and may shut in non-compliant pools unless approved schemes are operational by specified dates.

Last changed 5 hours ago.

Extracted view for reading · Original for compliance evidence

Show cause hearing relating to waste

385 (1) This section applies to applications by the Chief Conservation Officer to the Commission under section 22 of the Canada Oil and Gas Operations Act for a show cause hearing relating to waste, as defined in paragraph 18(2)(f) or (g) of that Act, in the recovery of oil or gas from a pool. (2) On receiving an application, the Commission must make an order requiring the operators within the pool to show cause at a hearing, to be held on a day specified in the order, why the Commission should not make a direction in respect of the waste. (3) On the day specified in the order, the Commission must hold a hearing at which the Chief Conservation Officer, the operators and other interested persons must be given an opportunity to be heard. (4) If, after the hearing, the Commission considers that waste is occurring in the recovery of oil or gas from a pool, it may, by order, (a) direct the introduction of a scheme for the collection, processing, disposition or reinjection of any gas produced from the pool; or (b) direct repressurizing, recycling or pressure maintenance for the pool or any part of the pool and for or incidental to that purpose, direct the introduction or injection of gas, water or any other substance into the pool or any part of the pool. (5) In addition to making an order under subsection (4), the Commission may, by order, direct that the pool or any part of the pool specified in the order be shut in if the requirements of the order are not met or unless a scheme is approved by the Commission and in operation by a date fixed in the order. (6) Despite subsections (4) and (5), the Commission may, by order, permit the continued operation of a pool or any part of a pool after the date fixed by an order made under this section if the Commission considers that a scheme or other action described in paragraph (4)(a) or (b) is in the course of preparation, but the continued operation is subject to any conditions the Regulator imposes.

Source

https://laws-lois.justice.gc.ca/eng/acts/C-15.1/section-385.html

Canonical document at the regulator. Always cite this URL — not the Vantage detail page — in compliance evidence.

Related in Canada

CACNSCREGDOC-3.5.1GuidanceIn force

Information Dissemination: Licensing Process for Class I Nuclear Facilities and Uranium Mines and Mills, Version 2.1

5 hours ago
CACNSCREGDOC-3.5.4GuidanceIn force

Pre-licensing Review of a Vendor’s Reactor Design

5 hours ago
CACERCanadian Energy Regulator Act, s. 2Primary legislationIn force

Definitions

Section 2 of the Canadian Energy Regulator Act establishes statutory definitions for federal energy infrastructure regulation, including abandoned facilities and pipelines, oil and gas exports and imports, ground disturbance thresholds for pipeline protection, and incorporates Indigenous governing bodies and knowledge in energy decision-making processes.

5 hours ago
CACERCanadian Energy Regulator Act, s. 307Primary legislationIn force

Application of sections 317 and 318

Section 307 of the Canadian Energy Regulator Act extends regulatory sections 317 and 318 to offshore renewable energy projects and offshore power lines by substituting references to companies with persons and pipelines with offshore facilities, ensuring equivalent regulatory requirements.

5 hours ago
CACERCanadian Energy Regulator Act, s. 140Primary legislationIn force

Reimbursement — measures taken by government institution

The Canadian Energy Regulator Commission may order pipeline operators to reimburse federal, provincial, municipal governments, Indigenous bodies, and other persons for reasonable costs incurred responding to unintended or uncontrolled releases of oil, gas, or other commodities from pipelines, even if costs exceed the operator's statutory liability limits.

5 hours ago