Global regulations corpus

Browse 15,113 regulations from 36 regulators

2,968 updated in the last 30 days. Public corpus — no signup required to read.

Showing 451–500 of 844 regulations

INTIEAMexico · NOM-027-ENER / SCFI-2018: Thermal performance, gas saving and safety requirements of solar water heaters and solar water heaters with the support of a water heater that uses L.P. gas as fuel or natural gas. Specifications, testing methods and labelling.PolicyIn force

NOM-027-ENER / SCFI-2018: Thermal performance, gas saving and safety requirements of solar water heaters and solar water heaters with the support of a water heater that uses L.P. gas as fuel or natural gas. Specifications, testing methods and labelling.

This standard establishes the thermal performance specifications of solar water heaters for domestic and commercial use, thermosiphon type, that have a thermal tank with a maximum capacity of 500 liters; the gas saving of solar water heaters with the backing of a water heater…

5 years agoeff.
INTIEAIndia · Kerala Wind Energy PolicyPolicyIn force

Kerala Wind Energy Policy

The Kerala Wind Energy Policy are developed guidelines for developing wind power generating stations through private developers, created due to the need for policy to take place while the Kerala Renewable Energy Policy 2002 took substantial time to

5 years agoeff.
INTIEAIndia · Madhya Pradesh Wind Power Project Policy 2012PolicyIn force

Madhya Pradesh Wind Power Project Policy 2012

Madhya Pradesh has a wind energy potential of around 5500 MW, whereas the total installed capacity is only 270 MW. The State Government proposes to promote wind energy as an additional and alternative source of energy through the Wind Power Project Policy,

5 years agoeff.
INTIEAIndia · The Uttar Pradesh Solar Power Policy 2017PolicyIn force

The Uttar Pradesh Solar Power Policy 2017

Uttar Pradesh Solar Policy was drafted in 2017 and adopted early 2018. The key objectives of the policy are: to increase renewable installed capacity in the state to 10.7 GW by 2020 out of which 4.3 GW will come from rooftop solar (through Solar Rooftop Policy) and 6.4 GW will…

5 years agoeff.
INTIEAIndia · Mandatory use of Solar Water Heating Systems in RajasthanPolicyIn force

Mandatory use of Solar Water Heating Systems in Rajasthan

The Energy department of Rajasthan has issued a notification No. F.20(6)Energy/98 dated July 14 for mandatory the use of Energy Efficient Lamp vide notification. The notification mandates the use of solar water heating systems in Industrial buildings where hot water is required…

5 years agoeff.
INTIEAAzerbaijan · Rules of Issuing Special Permission to Activity Concerning Alternative and Renewable Energy SourcePolicyIn force

Rules of Issuing Special Permission to Activity Concerning Alternative and Renewable Energy Source

Outlines rules and procedures of applying and issuing Special Permission for operating renewable energy plants. Permission can be issued to legal and physical persons; For all types of renewable energy plants with a capacity bigger than 10 kW; Applications must be made to the…

5 years agoeff.
INTIEAMexico · Thermal efficiency regulation of solar water heaters (NOM-027-ENER/SCFI-2018)PolicyIn force

Thermal efficiency regulation of solar water heaters (NOM-027-ENER/SCFI-2018)

The regulation establishes the thermal efficiency, gas savings and safety requirements of solar water heaters and solar water heaters backed by LPG (liquefied petroleum gas) or natural gas that are intended to be introduced into the Mexican market. Technical specifications,…

5 years agoeff.
INTIEAIndia · Rajasthan Policy for Promoting Generation of Electricity from Wind 2012PolicyIn force

Rajasthan Policy for Promoting Generation of Electricity from Wind 2012

The Government of Rajasthan, in order to promote generation of power from Wind, implements the Policy for Promoting Generation of Electricity from Wind, 2012. The State Government may undertake review once again of this policy as and when the need arises in light of any new…

5 years agoeff.
INTIEAIndia · Uttar Pradesh net-metering regulations for rooftop solar PVPolicyIn force

Uttar Pradesh net-metering regulations for rooftop solar PV

Uttar Pradesh Net-metering regulations for rooftop solar PV entered into force on 20th of March 2015. The tariff for rooftop PV installations under net-metering scheme is set to INR 7.06/kWh. The support runs for 25

5 years agoeff.
INTIEAArmenia · Scaling Up Renewable Energy Program for Armenia (SREP Armenia)PolicyIn force

Scaling Up Renewable Energy Program for Armenia (SREP Armenia)

Scaling Up Renewable Energy Program for Armenia (SREP Armenia) was published in April 2014. It is an update to the Renewable Energy Roadmap from 2011. The SREP establishes new renewable energy production targets and underlines importance of the renewables deployment in a context…

5 years agoeff.
INTIEAIndia · Andhra Pradesh Solar Power Policy 2015PolicyIn force

Andhra Pradesh Solar Power Policy 2015

The Andhra Pradesh Solar Power Policy 2015, in an order to promote solar power projects, was updated from the Andhra Pradesh Solar Power Policy, 2012. Solar Power Projects (SPP) that are commissioned during the operative period of five years shall be eligible for the incentives…

5 years agoeff.
INTIEAIndia · Uttar Pradesh Mini-Grid Policy 2016PolicyIn force

Uttar Pradesh Mini-Grid Policy 2016

In 2016, Uttar Pradesh adopted a Mini-Grid Policy in order to speed up electrification process in rural areas of the province through a facilitation of renewable energy and mini-grids deployment. The mini-grids supported and regulated by the policy are to be installed in…

5 years agoeff.
INTIEAIndia · Ujwal Bharat - Power Sector Reform & Energy AccessPolicyIn force

Ujwal Bharat - Power Sector Reform & Energy Access

Ujwal Bharat is a scheme first put forth under the Prime Minister Narendra Modi in May of 2016. It includes power sector reform and general goals of lighting up or electrifying India's traditionally stranded and disconnected places. It's main mission underscores: 24 x 7…

5 years agoeff.
INTIEAItaly · National energy income fund (Reddito energetico)PolicyIn force

National energy income fund (Reddito energetico)

The national energy income fund, with a total budget of 200 mln euro, is aimed at the disbursement of capital grants or the provision of guarantees to cover investment costs for the construction of PV systems for domestic use, with the the objective of supporting energy…

5 years agoeff.
INTIEAPeople's Republic of China · Feed-in tariff for onshore and offshore windPolicyIn force

Feed-in tariff for onshore and offshore wind

In 2009, the Chinese National Development and Reform Document (NDRD) introduced a feed-in tariff to support the deployment of electricity from onshore wind, applying over a 20 year period. The price setting is divided in four categories according to the wind endowment of the…

5 years agoeff.
INTIEAPeople's Republic of China · Notice on further promotion of the distributes solar PV systemsPolicyIn force

Notice on further promotion of the distributes solar PV systems

The aim of the Notice is to further promote distributed solar PV installation in China. The Notice is directed to the provinces obliging them to strengthen further deployment of small-scale solar PV through: Planning implementation; Provision of financial incentives and…

5 years agoeff.
INTIEAPeople's Republic of China · Notice on promotion of PV industry by exert the price leverage effectPolicyIn force

Notice on promotion of PV industry by exert the price leverage effect

In order to promote the development and utilization of renewable energy, since September 25, 2013, to other electricity levy charge renewable energy tariff except for residents living and agricultural production to 1.5 cents /

5 years agoeff.
INTIEAPeople's Republic of China · Interim Measure of Distributed Solar Power Generation On-grid Service Agreement (State Grid)PolicyIn force

Interim Measure of Distributed Solar Power Generation On-grid Service Agreement (State Grid)

Target: China plans to increase installed generation capacity for solar power to over 21GW by 2015. State Grid Cooperation for China (SGCC) announced a plan to allow small-scale distributed solar power generators to connect to its power lines and allow solar power generators…

5 years agoeff.
INTIEAPeople's Republic of China · Notice on planning the exploitation and utilization of geothermal energy for power and heatingPolicyIn force

Notice on planning the exploitation and utilization of geothermal energy for power and heating

The Notice provides a general guidance on short and long term development of the geothermal power in China for electricity and heat production. The short-term efforts will be focused on the exploitation of the geothermal power from shallow and medium-deep sources. The heat will…

5 years agoeff.
INTIEAPeople's Republic of China · The state council's comments on promote the development of the PV industryPolicyIn force

The state council's comments on promote the development of the PV industry

In order to deal with the current problems the PV industry is facing, and further regulate and promote the healthy and sustainable development of this industry, a target that an average annual increase of approximately 10 million kilowatts in PV power installed capacity during…

5 years agoeff.
INTIEAPeople's Republic of China · Distributed photovoltaic power generation service guide of China Southern Power Grid Company Limited (Interim)PolicyIn force

Distributed photovoltaic power generation service guide of China Southern Power Grid Company Limited (Interim)

In order to strengthen services for distributed solar power projects and promote orderly development of photovoltaic industry coordinating, enactment of this service guide. Guide distributed in photovoltaic grid-connected applications, programme formulation and review,…

5 years agoeff.
INTIEAPeople's Republic of China · Notice on issues concerning State Grid Corporation of China to buy distributed PV power generation projects' electricity products invoice etc.PolicyIn force

Notice on issues concerning State Grid Corporation of China to buy distributed PV power generation projects' electricity products invoice etc.

In case of enterprises owned by the state grid buy electricity from distributed photovoltaic project power products, can be issued by the national grid company-owned enterprises free text invoices. Photovoltaic power generation project electricity sales of power products, liable…

5 years agoeff.
INTIEAPeople's Republic of China · National energy administrati on Notice on the development of construction of distributed PV power grid demonstration parkPolicyIn force

National energy administrati on Notice on the development of construction of distributed PV power grid demonstration park

For the expansion of distributed PV Application market, according to the relevant provincial (district, municipal) submitted to the demonstration area implementation plan, identified a first list of distributed PV demonstration area. The 18 demonstration areas are: BEIJING…

5 years agoeff.
INTIEAPeople's Republic of China · Comments on support of PV power financial servicesPolicyIn force

Comments on support of PV power financial services

In order to maximize leverage to effectively stimulate distributed photovoltaic investments made this comment. Country opened line support various to "self-use priority surplus goes grid national grid control" method for construction and operations of distributed PV power…

5 years agoeff.
INTIEAPeople's Republic of China · The Notice on the Establishment of Demonstration Areas for Large-Scale distributed solar PV Power GenerationPolicyIn force

The Notice on the Establishment of Demonstration Areas for Large-Scale distributed solar PV Power Generation

The Notice mandates provinces to establish demonstration areas for large-scale distributed solar photovoltaic installations in order to further upscale solar generation and utilization in China. Provinces are obliged to select urban area and create large-scale deployment of…

5 years agoeff.
INTIEAPeople's Republic of China · Interim procedures of the management of distributed power generationPolicyIn force

Interim procedures of the management of distributed power generation

"Method" exempted distributed power generation projects electricity generation business license, encourage enterprises, professional Energy Service Companies and including individuals, all kinds of electric power customer investment in building and operating distributed…

5 years agoeff.
INTIEAPeople's Republic of China · The Interim Measures for the management of photovoltaic power plant projectPolicyIn force

The Interim Measures for the management of photovoltaic power plant project

Regarding plan guidance and scale management, State Council authorities in charge of energy determine the scale and layout of photovoltaic power plant construction on the national level, and annual development scales on the province (autonomous region and municipality) level…

5 years agoeff.
INTIEAPeople's Republic of China · Notice on the related issues of the application of subsidies based on electric quantity of distributed PV power gridPolicyIn force

Notice on the related issues of the application of subsidies based on electric quantity of distributed PV power grid

To implement the State Council "several opinions on promoting the healthy development of photovoltaic industry" (Guo Fa [2013] No. 24), the Ministry of finance to develop distributed photovoltaic power generation project according to the quantity of subsidies. The state of the…

5 years agoeff.
INTIEAPeople's Republic of China · National certification and Implementation Supervision Commission, Energy Bureau on strengthening the photovoltaic products testing and certification workPolicyIn force

National certification and Implementation Supervision Commission, Energy Bureau on strengthening the photovoltaic products testing and certification work

In order to enhance the construction of the PV products' testing and certification system and regulate the industry's management, the Certification and Accreditation Administration of the People’s Republic of China and the National energy administration of the people's republic…

5 years agoeff.
INTIEAPeople's Republic of China · Market entry standards for wind equipment manufacturing industry:PolicyIn force

Market entry standards for wind equipment manufacturing industry:

The Chinese government introduced specific regulations to improve the efficiency and competitiveness of the local wind equipment manufacturing market. The new standard first restricts the wind turbine manufacturing market to entities of a minimum production capacity of 2.5 MW.…

5 years agoeff.
INTIEAPeople's Republic of China · Brightness ProgrammePolicyIn force

Brightness Programme

The Brightness Program is an umbrella program, which includes the Township Electrification Program (TEP) (implemented 2002-2003), and the Village Electrification Program. The TEP included 20 MW of solar PV and wind, and 200 MW of small hydro to provide electricity for more than…

5 years agoeff.
INTIEAPeople's Republic of China · Notice regulating the standardization of the wind power equipment and generators qualityPolicyIn force

Notice regulating the standardization of the wind power equipment and generators quality

The Notice puts and obligation on provinces to strengthen the quality of wind power equipment and generators through standardize quality checking processes for wind plant equipment and windmills commissioning. The Notice underlines importance of transparent and clear processes…

5 years agoeff.
INTIEAPeople's Republic of China · The Notice on Integrating and Accommodating Wind Power 2013PolicyIn force

The Notice on Integrating and Accommodating Wind Power 2013

The Notice pointed out that wind curtailment and power regulation has been very serious in some regions in 2012 with rapid development of installed capacity of wind power in China. The abandoned electricity generated by wind power was up to 20TWh throughout the country, so…

5 years agoeff.
INTIEAPeople's Republic of China · Interim procedures of management of the code of practice of PV manufacturingPolicyIn force

Interim procedures of management of the code of practice of PV manufacturing

For the manufacturing industry to strengthen the management of PV, guide the photovoltaic industry to speed up the transformation and upgrading, the enactment of this approach. On the photovoltaic manufacturing industry application and auditing and supervision and management in…

5 years agoeff.
INTIEARwanda · Minimum Standards for Solar Home SystemsPolicyIn force

Minimum Standards for Solar Home Systems

It sets both quality requirements (ch. 4) and service level requirements (ch. 5)   Minimum service level requirements include: 3 lamps operating at least 4 hours per day a mobile phone charge supply for 2 hours per day a radio charge supply for 5 hours per nights supply…

5 years agoeff.
INTIEAUkraine · Lviv Soft Loan Programme for Solar Thermal SystemsPolicyIn force

Lviv Soft Loan Programme for Solar Thermal Systems

Since 2009, Bank Lviv has offered residents across the Lviv region a subsidised interest rates to finance energy-saving measures, including the set-up of solar thermal systems. A 20% of the interest rate will be transferred back to the customer’s account a month

5 years agoeff.
INTIEAKazakhstan · Kazakhstan renewable energy auction (May 2018)PolicyIn force

Kazakhstan renewable energy auction (May 2018)

In early 2018 Kazakhstan issued its first call for interest for the renewable energy power capacity auction. The auction is scheduled to take place on 23 May 2018. The government is seeking to procure around 1 GW of new solar PV and wind power capacity while reducing costs. The…

5 years agoeff.
INTIEASpain · Technical Building CodePolicyIn force

Technical Building Code

The Technical Building Code, hereinafter referred to as TBC, promulgated by Royal Decree 314/2006, 17 March 2006, is the regulatory framework governing the basic quality requirements that must be met by buildings, including their installations, in order to comply with the basic…

5 years agoeff.
INTIEAIreland · Ireland Better Energy and related programmes for buildingsPolicyIn force

Ireland Better Energy and related programmes for buildings

The Better Energy Programme  is the umbrella for a number of Government schemes that provide full or partial grants to households. These schemes allow households to upgrade the energy efficiency of their homes.  The Better Energy Programme is administered by Sustainable Energy…

6 years agoeff.
INTIEAPortugal · Regime for the installation and operation of new plants biomass recoveryPolicyIn force

Regime for the installation and operation of new plants biomass recovery

Amends the special and extraordinary regime for the installation and operation of new plants biomass recovery. Aim to maximising the potential of the special regime provided for in Decree-Law No. 64/2017 of 12 June, in a dual objective of, on the one hand, decarbonizing existing…

6 years agoeff.
INTIEAAustria · Climate and Energy Model RegionsPolicyIn force

Climate and Energy Model Regions

Support for Austrian regions on their journey into a renewable energy future free from fossil fuels. They use their local renewable energy resources, use energy saving potetials to the full, and operate

6 years agoeff.
INTIEAAustria · Solar thermal energy - large solar energy plantsPolicyIn force

Solar thermal energy - large solar energy plants

Supports large solar plants and improves the framework conditions for the implementation of large solar thermal plants providing innovative impulses in the

6 years agoeff.
INTIEAPortugal · Strategy and Action Plan for Oceanic Renewable EnergiesPolicyIn force

Strategy and Action Plan for Oceanic Renewable Energies

1 - To approve the Industrial Strategy for Oceanic Renewable Energies (EI -ERO) contained in Annex I to the resolution and of which it is an integral part. 2 - To approve, in the context of EI-ERO, the Action Plan for Oceanic Renewable Energies, contained in Annex II to the…

6 years agoeff.
INTIEAIreland · Solar PV Grant Scheme & MicrogenerationPolicyIn force

Solar PV Grant Scheme & Microgeneration

In 2018 a grant scheme was launched for to support solar photovoltaics in homes. A new scheme for micogeneration is expected to be in place by June

6 years agoeff.
INTIEAAustralia · Solar Homes ProgramPolicyIn force

Solar Homes Program

The Solar Homes Package provides rebates for solar water heaters and rebates and interest free loans for solar PV systems and batteries, including assistance for rental

6 years agoeff.
INTIEAAustria · Investment subsidies for photovoltaics in agriculture and forestryPolicyIn force

Investment subsidies for photovoltaics in agriculture and forestry

Promotes small to medium-sized photovoltaic systems as well as electricity storage for agricultural and forestry companies and thus creates incentives for an environmentally and climate-friendly power supply in agriculture and

6 years agoeff.
INTIEAPortugal · Pilot zone's legal regime for ocean renewable energyPolicyIn force

Pilot zone's legal regime for ocean renewable energy

Mandate for the development of the pilot zone's legal regime for ocean renewable energy. Access location and extension of the scope of the Pilot Zone with the Windfloat project, ensuring its compatibility with the Industrial Strategy for Oceanic Renewable Energies (EI -ERO),…

6 years agoeff.
INTIEAAustralia · Solar for low income households - TrialPolicyIn force

Solar for low income households - Trial

NSW are trialling a new way of helping people on low incomes reduce their electricity bills by installing 3 kilowatt solar systems on their homes, in exchange for no longer receiving the Low Income Household

6 years agoeff.
INTIEASwitzerland · Market premium for large-scale hydropowerPolicyIn force

Market premium for large-scale hydropower

Operators of large-scale hydropower plants with an output higher than 10 MW are entitled to a market premium if they have to sell their electricity on the market at prices lower than their production

6 years agoeff.
INTIEAIreland · Renewable Electricitiy Support SchemePolicyIn force

Renewable Electricitiy Support Scheme

Renewable support scheme to meet Ireland 70% renewable electricity target by

6 years agoeff.