United Kingdom
4 regulators · 880 regulations · 490 updated in the last 30 days
Showing 751–800 of 858 regulations
ME3 9ND, Slicker Recycling Limited: environmental permit issued – EPR/QP3138AA/V006
Environmental permit issued to Slicker Recycling Limited for the Kingsnorth Oil Treatment Plant in Rochester under the Industrial Emissions Directive, regulating operational emissions and waste treatment activities.
TA22 9QL, Kathleen Lock and seven other individuals: environmental permit application advertisement - EPR/KP3024MZ/A001
Environmental permit application advertisement for Hawkridge Village Hall in Dulverton, submitted by Kathleen Lock and seven other individuals under reference EPR/KP3024MZ/A001.
TA21 9HP, Ken Coles and Christine Coles: environmental permit application advertisement - EPR/AP3728MB/A001
Environmental permit application advertisement for an operation at Chelston House Farm in Somerset, submitted by Ken Coles and Christine Coles. The sparse public notice indicates a permit application under the Environmental Permitting Regulations but does not specify the regulated activity or substances involved.
HR9 6PJ, Suzanne Young: environmental permit application advertisement - EPR/MP3428MG/A001
Environmental permit application advertisement for Tre Essey Cross Barn, Llangarron, Ross-on-Wye, Herefordshire, submitted by Suzanne Young under permit reference EPR/MP3428MG/A001.
Green Heat Network Fund (GHNF): guidance on how to apply
The Green Heat Network Fund provides capital grant support for developing new and existing low-carbon heat networks in the UK. Applications are processed through Triple Point.
Green Heat Network Fund: privacy notice
Privacy notice for the Green Heat Network Fund explaining how personal data is collected, used, and protected during applications for heating network funding in the UK.
LS9 0NX, Waste Organics (Leeds) Limited: environmental permit application advertisement - EPR/FB3701UA/V006
Environmental permit application advertisement for Waste Organics (Leeds) Limited facility in Leeds, UK. The application relates to waste organics processing operations and is subject to permitting review under Environmental Permitting Regulations.
National Energy Efficiency Data-Framework (NEED) report: summary of analysis 2026
The National Energy Efficiency Data-Framework (NEED) report presents analysis of energy consumption trends from 2005 to 2024, providing a comprehensive summary of energy efficiency data in the UK using consumption patterns over a two-decade period.
Pair guilty after waste dumped in Norfolk
Two individuals were found guilty of dumping waste in Norfolk, UK. This case involved five prosecutions related to illegal waste disposal in villages, with evidence gathered through surveillance camera footage of vehicles at the dump sites. The prosecution concerns unauthorized waste handling.
Advanced Nuclear Technologies
UK government information document on Advanced Nuclear Technologies (formerly Small Modular Reactors), covering policy and development of next-generation nuclear energy systems.
Landscape Recovery scheme: complaints and reconsiderations
Guidance document enabling participants in the UK's Landscape Recovery scheme to lodge complaints, provide feedback, or request reconsideration of scheme decisions.
Bell Weir Refurbishment Works 2026: river closure notice
Notice of river navigation closures on the River Thames during 2026 Bell Weir refurbishment works, affecting river traffic and transport operations.
Environment Agency issues new permit for Davidstow creamery
The Environment Agency has issued a permit variation to Saputo Dairy UK for their creamery facility near Davidstow, Cornwall, following a public consultation.
TN21 9NX, Christine Walker: environmental permit application advertisement - EPR/CP3324MF/A001
Environmental permit application advertisement for an operation at Cotteswood, Churches Green Lane, Heathfield, TN21 9NX, submitted by Christine Walker under permit reference EPR/CP3324MF/A001.
NR34 7LN, Balfour Beatty Civils Limited: environmental permit application advertisement - EPR/WP3728MQ/A001
Balfour Beatty Civils Limited submitted an environmental permit application for Benacre Pumping Stations at Lothingland Station in Beccles, NR34 7LN. This is a public advertisement of the permit application.
Guildford flood alleviation scheme
The Guildford flood alleviation scheme provides information on flood management and mitigation measures for the Guildford area in the UK.
Shredding waste upholstered domestic seating containing POPs: RPS 264
UK Environment Agency regulatory position on shredding waste upholstered domestic seating (WUDS) containing persistent organic pollutants (POPs). Addresses environmental controls and compliance requirements for waste management facilities handling upholstered furniture with POPs contamination.
ME20 7XE, Elliott Environmental Drainage Limited: second environmental permit application advertisement - EPR/ZP3623LZ/A001
Elliott Environmental Drainage Limited has submitted a second environmental permit application for a facility located at Unit 1, St Michaels Close, Aylesford, UK. This advertisement notifies the public of the permit application under environmental permitting regulations.
Temporary discharge of water unfit for supply from water undertaker treatment and supply assets: RPS 280
Environment Agency regulatory position clarifying conditions and procedures for temporary discharge of water unfit for supply from water treatment and supply assets operated by water undertakers.
CCUS Innovation 2.0 competition: UK BECCS-MCFC - Next generation CCUS technology for net zero 2050
UK CCUS Innovation 2.0 competition project led by University of Sheffield developing next-generation carbon capture, usage and storage technology combining biomass energy with MCFC (molten carbonate fuel cell) systems to support net zero 2050 targets.
Hurst Spit and Lymington draft coastal strategy unveiled
UK draft coastal strategy published to manage climate change impacts along a 15km coastline between Hurst Spit and Lymington.
£50 million investment to help protect Somerset’s farms and homes from flooding
The UK government is allocating £50 million to Somerset Council to strengthen flood resilience and protect farms and homes from flooding in the region.
Standard Assessment Procedure
The Standard Assessment Procedure (SAP) is a UK methodology for calculating residential building energy performance, used to assess how efficiently a home uses energy and to support compliance with building energy standards.
Alan Lovell to step down as Chair of the Environment Agency
Alan Lovell is stepping down as Chair of the Environment Agency after four years of service. This is a personnel announcement with no specific regulatory, substance, or sectoral details.
LN2 3PU, Annyalla Chicks (UK) Broiler Breeders Limited: environmental permit application advertisement - EPR/MP3621LD/A001
Environmental permit application advertisement for Annyalla Chicks (UK) Broiler Breeders Limited's Welton Cliff Poultry Farm in Lincoln, UK under the Environmental Permitting Regulations.
DL2 2PB, NY Highways Limited: environmental surrender issued - EPR/EP3707LP/S003
Environmental permit surrender issued for NY Highways Limited's Dalton Depot facility in Dalton-on-Tees under the UK Industrial Emissions Directive. The surrender documentation formally closes the environmental regulatory obligations for this installation.
UK Special Representative for Climate: terms of reference
This document establishes the terms of reference and responsibilities for the UK Special Representative for Climate role, defining the position's mandate, scope, and operational framework within the UK government's climate governance structure.
HR3 5ER, Owen Dady: environmental permit application advertisement - EPR/PP3928MD/A001
Environmental permit application advertisement for an operation at The Wain House, Clifford, Hereford, Herefordshire, submitted by Owen Dady under permit reference EPR/PP3928MD/A001.
PE10 0AL, Ms Laura Cuthbertson: environmental permit application advertisement - EPR/GP3424MW/A001
Environmental permit application advertisement for a property at The Bungalow, Meadow Drive, Bourne, PE10 0AL, submitted by Ms Laura Cuthbertson under reference EPR/GP3424MW/A001.
TS2 1UB, Cumbria Waste Recycling Limited: environmental permit application advertisement - EPR/YP3424LH/A001
Environmental permit application advertisement by Cumbria Waste Recycling Limited for a hazardous waste transfer station at Seal Sands, Middlesborough, requiring regulatory approval under UK environmental permitting regulations.
National Policy Statements for energy infrastructure
Energy National Policy Statements provide planning guidance for developers of nationally significant energy infrastructure projects in the UK, establishing criteria and procedures for permitting and constructing major energy facilities.
Draft National Policy Statement for fusion energy generation (EN-8)
UK government consultation on a National Policy Statement to guide planning and regulatory decisions for fusion energy infrastructure development and deployment.
Vital annual beach work reduces flood risk on Lincolnshire coast
Annual beach maintenance work in Lincolnshire involves placement of approximately 300,000 cubic metres of sand to manage coastal flood risk, protecting 20,000 homes and businesses, 24,500 static caravans, and 35,000 hectares of agricultural land.
Companies agree to stronger workers’ rights in clean energy
UK offshore wind supply chain companies and trade unions have endorsed the government's Offshore Wind Fair Work Charter, pledging to strengthen workers' rights within the clean energy sector, particularly in the offshore wind industry.
PL32 9XW, Dairy Crest Limited: environmental issued - EPR/BN6137IK/V013
Environmental permit issued to Dairy Crest Limited for Davidstow Creamery in Camelford under the Industrial Emissions Directive, regulating emissions from dairy processing operations.
Tracer tests and remediation schemes: environmental permit exemption
UK guidance on registration requirements for discharging small quantities of substances in groundwater tracer tests and remediation schemes conducted for scientific purposes, including exemptions from standard environmental permitting.
CO6 3DU, Lanswood Limited: environmental permit application advertisement - EPR/FP3724MJ/A001
Lanswood Limited has submitted an environmental permit application for Barn Conversion A at Hall Road, Colchester, CO6 3DU, requiring public notice and review under UK environmental permitting regulations.
BB5 5TA, United Utilities Water Limited: environmental permit application advertisement - EPR/FB3144KX
United Utilities Water Limited submitted an environmental permit application for a combined sewer overflow (CSO) facility at Lower Barnes Street, Clayton-Le-Moors, Lancashire. This is a standard permitting advertisement for water infrastructure operations.
TA7 0AT, Richard Watts: environmental permit application advertisement - EPR/MP3528MT/A001
Environmental permit application advertisement for Richard Watts at Maple Durham, Moorland, Bridgwater, TA7 0AT (EPR/MP3528MT/A001). Specific permit details and regulated activities are not detailed in the provided excerpt.
DE4 4BW, Mr Christopher Sheppard and Mr Jamie Ogilvie: environmental permit application advertisement - EPR/EP3224MF/A001
Environmental permit application advertisement for The Lilies, Griffe Grange Valley, Matlock, submitted by Christopher Sheppard and Jamie Ogilvie under EPR/EP3224MF/A001.
TA7 0JL, Russel Monkhouse: environmental permit application advertisement - EPR/VP3725MV/A001
Environmental permit application advertisement for Dairy House Barn, a dairy operation located in Stathe, Bridgwater. This is a standard permitting notice published by UK environmental regulators regarding the application submitted by Russel Monkhouse.
NG9 6DY, Severn Trent Water Limited: low risk permit surrender issued EPR/UP3603MG/S002
Low risk permit surrender issued for Severn Trent Water Limited's Toton Sewage Treatment Works under the Industrial Emissions Directive, allowing the facility to cease regulated operations.
DESNZ: workforce management information, April 2026
Administrative publication reporting UK Department for Energy Security and Net Zero (DESNZ) workforce staffing numbers and associated costs as of April 2026.
Nature-based solutions for sustainable water resources: Environment Agency position statement
The Environment Agency's position statement outlines nature-based solutions for sustainable water resource management, explaining their mechanisms, environmental benefits, and supporting evidence base for water security and ecological resilience.
Assessing and scoring environmental permit and licence compliance
UK guidance on how the Environment Agency assesses and scores compliance with environmental permits, abstraction licences and impounding licences, establishing the criteria and methodology for evaluating permit holder adherence to regulatory requirements.
R. G. Produce Limited (NPS/WR/045863): application made to abstract water
The Environment Agency has received an application from R. G. Produce Limited for a water abstraction licence to take water, likely for agricultural or horticultural production purposes.
Johnston Quarry Group Limited (NPS/WR/044165 and NPS/WR/046885): applications made to abstract water
The Environment Agency received applications from Johnston Quarry Group Limited for water abstraction licences (references NPS/WR/044165 and NPS/WR/046885). No regulatory details, restrictions, or decision outcomes are provided in this notice.
Contracts for Difference (CfD) Allocation Round 8: Clean Industry Bonus framework and guidance
The Contracts for Difference (CfD) Allocation Round 8 introduces a Clean Industry Bonus framework enabling fixed and floating offshore wind applicants to receive additional CfD revenue support in exchange for investments in sustainable supply chains, promoting clean energy transition and industrial development.
SK13 8ES, Plater Chemicals Limited: environmental permit application advertisement – EPR/AP3737GA/V004
Environmental permit application advertisement for Plater Chemicals Limited's Glossop Metal Salts facility in Glossop, UK. The application EPR/AP3737GA/V004 is submitted for regulatory review.
Cory Decarbonisation Project: Correction of errors, Planning Act 2008
Secretary of State decision to correct errors in the Cory Decarbonisation Project Order 2025, a UK planning decision under the Planning Act 2008 relating to decarbonisation infrastructure.