Econergy has launched commercial operations at its 70 MW/141 MWh Părău 1 battery project in Romania, paired with an existing 92 MW solar plant to create a 162 MW hybrid site. The fully merchant BESS can charge from the grid during low or negative prices, with Econergy expecting €9.7 million in storage revenue.
The post Merchant BESS switched on at operational solar site in Romania appeared first on pv magazine Global.
المصدر
https://www.pv-magazine.com/2026/09/10/merchant-bess-switched-on-at-operational-solar-site-in-romania/الوثيقة الرسمية لدى الجهة التنظيمية. استشهد دائماً بهذا الرابط — لا بصفحة تفاصيل Vantage — في أدلة الامتثال.