INTIEAUnited States · IECC 2012 with amendments - Commercial Building Code (Ohio)PolicyIn force

IECC 2012 with amendments - Commercial Building Code (Ohio)

Insulation and Fenestration Criteria The building thermal envelope shall meet the requirements of Tables C402.2 and C402.3 based on the climate zone specified in Chapter 3. Commercial buildings or portions of commercial buildings enclosing Group R occupancies shall use the…

آخر تعديل قبل 7 سنوات.

العرض المستخرج للقراءة · النص الأصلي للأدلة الامتثالية

دورة الحياة

  1. نافذ
  2. آخر تعديل

Country / jurisdiction: United States · Year: 2017 · Status: In force · Level: State/Provincial · Type: Voluntary

Insulation and Fenestration Criteria

The building thermal envelope shall meet the requirements of Tables C402.2 and C402.3 based on the climate zone specified in Chapter 3. Commercial buildings or portions of commercial buildings enclosing Group R occupancies shall use the R-values from the “Group R” column of Table C402.2. Commercial buildings or portions of commercial buildings enclosing occupancies other than Group R shall use the R-values from the “All other” column of Table C402.2. Buildings with a vertical fenestration area or skylight area that exceeds that allowed in Table C402.3 shall comply with the building envelope provisions of ANSI/ASHRAE/IESNA 90.1.

Specific Insulation Requirements (Prescriptive)

Opaque assemblies shall comply with Table C402.2. Where two or more layers of continuous insulation board are used in a construction assembly, the continuous insulation boards shall be installed in accordance with Section C303.2. If the continuous insulation board manufacturer’s installation instructions do not address installation of two or more layers, the edge joints between each layer of continuous insulation boards shall be staggered.

Fenestration (Prescriptive)

Fenestration shall comply with Table C402.3. Automatic daylighting controls specified by this section shall comply with Section C405.2.2.3.2.

Air Leakage (Mandatory)

The thermal envelope of buildings shall comply with Sections C402.4.1 through C402.4.8.

Service Water Heating (Mandatory)

Water-heating equipment and hot water storage tanks shall meet the requirements of Table C404.2. The efficiency shall be verified through data furnished by the manufacturer or through certification under an approved certification program.

Lighting Controls (Mandatory)

Lighting systems shall be provided with controls as specified in Sections C405.2.1, C405.2.2, C405.2.3 and C405.2.4.

On-Site Renewable Energy

Total minimum ratings of on-site renewable energy systems shall comply with one of the following:

1. Provide not less than 1.75 Btu (1850 W), or not less than 0.50 watts per square foot (5.4 W/m2) of conditioned floor area.

2. Provide not less than 3 percent of the energy used within the building for building mechanical and service water heating equipment and lighting regulated in this chapter.

Total Building Performance

Compliance with this section requires that the criteria of Sections C402.4, C403.2, C404 and C405 be met.

2012 IECC amendments

1. Section C101.4.3

a. Exception 5 shall read "Roof recover or roof repair."

b. Exception 6 shall read "Roofs without insulation in the cavity and where the sheathing or insulation is exposed during reroofing shall be insulated either above or below the sheathing."

c. Renumber exceptions 6, 7, and 8 as 7, 8, and 9.

2. Section C202 add the following definitions

REROOFING. The process of recovering or replacing an existing roof covering. See "Roof recover" and "Roof replacement."

ROOF RECOVER. The process of installing an additional roof covering over a prepared existing roof covering without removing the existing roof covering.

ROOF REPAIR. Reconstruction or renewal of any part of an existing roof for the purpose of its maintenance.

ROOF REPLACEMENT. The process of removing the existing roof covering, repairing any damaged substrate and installing a new roof covering.

3. Section C402.2.1.1

Delete existing section and Table C402.2.1.1 and replace with new section which reads "C402.2.1.1 Roof replacement. For roof replacements, where the existing roof assembly is part of the building thermal envelope and contains insulation entirely above deck, roof replacement shall include compliance with the requirements of Table C402.1.2 or Table C 402.2." 1301.3

Official source: http://bcpad.net/Code%20Books/IECC%202012.pdf

المصدر

https://www.iea.org/policies/7122

الوثيقة الرسمية لدى الجهة التنظيمية. استشهد دائماً بهذا الرابط — لا بصفحة تفاصيل Vantage — في أدلة الامتثال.

ذات صلة في International

INTEnergy Newsoilprice:oilprice-article-44778أخبارIn force

The $7 Trillion AI Boom Is Turning Into The Energy Trade of the Century

You might think that Shark Tank’s “Mr. Wonderful,” Kevin O’Leary, is betting it all on AI, but he is not. He is betting on the $5+ trillion in infrastructure required to run it, and that’s where big capital is flowing now. And he’s betting on Bitzero (NASDAQ: AIBZ) to be one of the first to break AI’s biggest chokepoint: power. Bitzero was looking further ahead while most of the rest of the market was narrowly focused on AI software and semiconductors. As a result, on May 5th, Bitzero…

قبل 17 ساعة
INTEnergy Newsoilprice:oilprice-article-44774أخبارIn force

One of Texas' Oldest Oil Plays Is Running Dry

The Eagle Ford shale play has shown remarkably consistent crude oil production and rising natural gas output in recent years. A formation beneath the Eagle Ford has been producing for nearly a century, but now it has its remaining resources nearly exhausted. The Buda Limestone formation, which lies beneath the Eagle Ford Group, has limited remaining oil and gas resources, the latest analysis by the U.S. Geological Survey (USGC) showed this week. Technically recoverable resources at Buda Limestone are estimated at 184 billion cubic feet of gas and…

قبل 17 ساعة
INTEnergy Newsoilprice:oilprice-article-44771أخبارIn force

China Is Quietly Winning the Clean Energy Trade War

China’s clean energy dominance is growing. Buoyed by the skyrocketing energy needs and future projected demands of the artificial intelligence boom, clean energy projects are getting greenlit at a breakneck pace. And those projects depend on cheap Chinese clean energy components, as Beijing has near-total control of global supply chains for clean energy tech including solar panels and lithium-ion batteries for electric vehicles as well as energy storage systems. As a result, Chinese clean energy exports are going gangbusters in virtually…

قبل 19 ساعة
INTEnergy Newsoilprice:oilprice-article-44760أخبارIn force

NASA Eyes Moon Base Powered by Solar Panels and Nuclear Reactors

With major plans for space travel, several governments are proposing lunar energy production, including solar and nuclear projects. In May, NASA announced plans to send robotic landers, hopping drones, and vehicles to the moon as part of the United States government’s plans to develop a lunar base. NASA is expected to develop the machines alongside Intuitive Machines, Astrobotic, Blue Origin, and Elon Musk’s SpaceX. The United States aims to land its astronauts back on the moon before President Donald Trump leaves office in 2029, 60…

قبل 21 ساعة
INTEnergy Newsoilprice:oilprice-article-44767أخبارIn force

The AI Power Crisis Is Creating a Massive New Market for Fuel Cells

Data center developers are scrambling for reliable power, turning away from congested grids and toward on-site fuel cells. Rystad Energy research and analysis projects a tenfold increase in fuel cell market revenues by 2030, rising from around $2.8 billion in 2025 to roughly $30 billion, as AI computing demand drives unprecedented growth in data center construction. A contracted order book of approximately 9 gigawatts (GW), including framework agreements with Oracle, AEP, Equinix, and Brookfield, points to growing confidence among major operators…

قبل يوم واحد