دورة الحياة
- نافذ
- آخر تعديل
Country / jurisdiction: Mauritius · Year: 2016 · Status: In force · Level: National · Type: Voluntary
This Grid Code describes the technical criteria and requirements for the connection of distributed generation plants of capacity greater than 200 kW but not exceeding 2 MW to the CEB’s 22 kV distribution network.
This Grid Code caters for the connection to the CEB distribution network and production of electricity by the following list of Renewable Energy Technologies (RETs):
Photovoltaic (PV)
Wind Turbine Generator (WTG)
Hydroelectric Generator
Biomass-based generator
Official source: http://ceb.intnet.mu/msdg/document/Grid%20Code%20MSDG%20more%20than%20200%20kW%20and%20up%20to%202MW%20V3.0.pdf
المصدر
https://www.iea.org/policies/6431الوثيقة الرسمية لدى الجهة التنظيمية. استشهد دائماً بهذا الرابط — لا بصفحة تفاصيل Vantage — في أدلة الامتثال.