INTIEAIndonesia · Establishment of Energy Conservation Services Companies ( Ministerial Regulation No.14/2016)PolicyIn force

Establishment of Energy Conservation Services Companies ( Ministerial Regulation No.14/2016)

In order to develop energy conservation service business activities that are independent, reliable, transparent, competitive, and efficient, it is necessary to regulate the operation of energy conservation services businesses. Based on these considerations, the Minister of…

آخر تعديل قبل 7 سنوات.

العرض المستخرج للقراءة · النص الأصلي للأدلة الامتثالية

دورة الحياة

  1. نافذ
  2. آخر تعديل

Country / jurisdiction: Indonesia · Year: 2016 · Status: In force · Level: National · Type: Voluntary

In order to develop energy conservation service business activities that are independent, reliable, transparent, competitive, and efficient, it is necessary to regulate the operation of energy conservation services businesses. Based on these considerations, the Minister of Energy and Mineral Resources regulates the Implementation of Energy Conservation Services Business based on the following terms:

The Energy Conservation Services Business consists of:

• planning or formulation of the Energy Efficiency Project Concept;

• investment standard energy audit (investment grade energy audit);

• Energy Efficiency Project financing;

• installation and / or construction work of the Energy Efficiency Project;

• monitoring or operating, maintaining and repairing energy installations; and / or

• Measurement and Verification (Measurement and Verification) Energy Savings performance.

The Energy Conservation Services Business can be carried out based on the following business patterns:

• Guaranteed energy savings, or

• Energy savings that are shared (shared saving).

Companies in implementing Energy Conservation Services Business can apply for a registered certificate. The application for a registered certificate as referred to in paragraph (1) shall be submitted by attaching the following conditions:

• deed of incorporation and SIUP of the Company;

• having 1 (one) or more Energy Conservation Experts, proven by an energy auditor certificate;

• complete list of supporting equipment; and

• financial capabilities that have been verified by financial audit institutions or reported to state financial institutions.

Companies that have obtained a registered certificate provide the ESPC model. The ESPC model as referred to in paragraph (1) contains at least:

• a description of the services offered;

• details of equipment installed or retrofitted and their respective specifications;

• specifications for installation and commissioning purposes;

• The agreed baseline as a guideline for payment;

• Energy Saving calculation methodology;

• Measurement and Verification (Measurement and Verification) Performance of Energy Saving, operation and maintenance;

• terms and conditions of payment by Service Users;

• asset ownership rights, in the event that the Company implements a shared saving business pattern;

• failed project conditions and their handling; and

• the terms of liability for deficiencies in the calculation of Energy Savings through guaranteed savings, in the event that the Company implements a Guaranteed Energy Saving business pattern.

Guidance and supervision of the operation of the Energy Conservation Services Business is carried out by the Minister of Energy and Mineral Resources through the Director General of New and Renewable Energy and Energy Conservation.

Official source: https://jdih.esdm.go.id/peraturan/Permen%20ESDM%20No.%2014%20Tahun%202016.pdf

المصدر

https://www.iea.org/policies/576

الوثيقة الرسمية لدى الجهة التنظيمية. استشهد دائماً بهذا الرابط — لا بصفحة تفاصيل Vantage — في أدلة الامتثال.

ذات صلة في International

INTEnergy Newsoilprice:oilprice-article-44778أخبارIn force

The $7 Trillion AI Boom Is Turning Into The Energy Trade of the Century

You might think that Shark Tank’s “Mr. Wonderful,” Kevin O’Leary, is betting it all on AI, but he is not. He is betting on the $5+ trillion in infrastructure required to run it, and that’s where big capital is flowing now. And he’s betting on Bitzero (NASDAQ: AIBZ) to be one of the first to break AI’s biggest chokepoint: power. Bitzero was looking further ahead while most of the rest of the market was narrowly focused on AI software and semiconductors. As a result, on May 5th, Bitzero…

قبل 10 ساعات
INTEnergy Newsoilprice:oilprice-article-44774أخبارIn force

One of Texas' Oldest Oil Plays Is Running Dry

The Eagle Ford shale play has shown remarkably consistent crude oil production and rising natural gas output in recent years. A formation beneath the Eagle Ford has been producing for nearly a century, but now it has its remaining resources nearly exhausted. The Buda Limestone formation, which lies beneath the Eagle Ford Group, has limited remaining oil and gas resources, the latest analysis by the U.S. Geological Survey (USGC) showed this week. Technically recoverable resources at Buda Limestone are estimated at 184 billion cubic feet of gas and…

قبل 10 ساعات
INTEnergy Newsoilprice:oilprice-article-44771أخبارIn force

China Is Quietly Winning the Clean Energy Trade War

China’s clean energy dominance is growing. Buoyed by the skyrocketing energy needs and future projected demands of the artificial intelligence boom, clean energy projects are getting greenlit at a breakneck pace. And those projects depend on cheap Chinese clean energy components, as Beijing has near-total control of global supply chains for clean energy tech including solar panels and lithium-ion batteries for electric vehicles as well as energy storage systems. As a result, Chinese clean energy exports are going gangbusters in virtually…

قبل 12 ساعة
INTEnergy Newsoilprice:oilprice-article-44760أخبارIn force

NASA Eyes Moon Base Powered by Solar Panels and Nuclear Reactors

With major plans for space travel, several governments are proposing lunar energy production, including solar and nuclear projects. In May, NASA announced plans to send robotic landers, hopping drones, and vehicles to the moon as part of the United States government’s plans to develop a lunar base. NASA is expected to develop the machines alongside Intuitive Machines, Astrobotic, Blue Origin, and Elon Musk’s SpaceX. The United States aims to land its astronauts back on the moon before President Donald Trump leaves office in 2029, 60…

قبل 14 ساعة
INTEnergy Newsoilprice:oilprice-article-44767أخبارIn force

The AI Power Crisis Is Creating a Massive New Market for Fuel Cells

Data center developers are scrambling for reliable power, turning away from congested grids and toward on-site fuel cells. Rystad Energy research and analysis projects a tenfold increase in fuel cell market revenues by 2030, rising from around $2.8 billion in 2025 to roughly $30 billion, as AI computing demand drives unprecedented growth in data center construction. A contracted order book of approximately 9 gigawatts (GW), including framework agreements with Oracle, AEP, Equinix, and Brookfield, points to growing confidence among major operators…

قبل 18 ساعة