INTIEAHungary · Implementation of the EU Directive on the Energy Performance of BuildingsPolicyIn force

Implementation of the EU Directive on the Energy Performance of Buildings

In 2006, Hungary passed Decree No. 7/2006. (V. 24.) TNM on the establishment of energy characteristics of buildings, thereby transposing portions of the EU Directive on the Energy Performance of Buildings. In particular, this decree coversthe first three of the five main areas…

آخر تعديل قبل 9 سنوات.

العرض المستخرج للقراءة · النص الأصلي للأدلة الامتثالية

دورة الحياة

  1. نافذ
  2. آخر تعديل

Country / jurisdiction: Hungary · Year: 2006 · Status: In force · Level: National · Type: Voluntary

In 2006, Hungary passed Decree No. 7/2006. (V. 24.) TNM on the establishment of energy characteristics of buildings, thereby transposing portions of the EU Directive on the Energy Performance of Buildings. In particular, this decree coversthe first three of the five main areas contained in the directive. The decree: - elaborated a national methodology for calculating the integrated energy efficiency of buildings; - established minimum requirements for the energy efficiency of new buildings with a surface area of over 1000m2; - established minimum requirements for large existing buildings (with a surface area of more than 1000 m2) regarding their energy performance in case they are subject to major renovation. Requirements cover both specific U-values for different building elements, whole building heating load requirements, and gross energy requirements for heating, cooling, ventilation, domestic hot water and - except for residential buidlings - artificial lighting. The rationality of using cogeneration must also be verified. The same requirements apply to new buildings and buildings undergoing major renovation, which is defined based on the building value: the cost of the renovation of the building envelope and/or mechanical systems must exceed 25% of the buildings value. Proof of compliance with the requirement is made in two stages, first when requesting a building permit, and second after building/renovation completion. The methodology included in the annex to the decree is to be applied, as of 1 September 2006, among the supporting technical calculations included in the licensing design documentation of the building (earlier the calculation had to be made in accordance with standard No. MSZ-04-140/2:1992). The calculation is checked during the licensing procedure. Hungary has officially requested a temporary derogation of three years for performing the other two tasks, that is, for introducing the certification process and for starting the assessment of furnaces, boilers and air-conditioning installations.

المصدر

https://www.iea.org/policies/568

الوثيقة الرسمية لدى الجهة التنظيمية. استشهد دائماً بهذا الرابط — لا بصفحة تفاصيل Vantage — في أدلة الامتثال.

ذات صلة في International

INTEnergy Newsoilprice:oilprice-article-44778أخبارIn force

The $7 Trillion AI Boom Is Turning Into The Energy Trade of the Century

You might think that Shark Tank’s “Mr. Wonderful,” Kevin O’Leary, is betting it all on AI, but he is not. He is betting on the $5+ trillion in infrastructure required to run it, and that’s where big capital is flowing now. And he’s betting on Bitzero (NASDAQ: AIBZ) to be one of the first to break AI’s biggest chokepoint: power. Bitzero was looking further ahead while most of the rest of the market was narrowly focused on AI software and semiconductors. As a result, on May 5th, Bitzero…

قبل 23 ساعة
INTEnergy Newsoilprice:oilprice-article-44774أخبارIn force

One of Texas' Oldest Oil Plays Is Running Dry

The Eagle Ford shale play has shown remarkably consistent crude oil production and rising natural gas output in recent years. A formation beneath the Eagle Ford has been producing for nearly a century, but now it has its remaining resources nearly exhausted. The Buda Limestone formation, which lies beneath the Eagle Ford Group, has limited remaining oil and gas resources, the latest analysis by the U.S. Geological Survey (USGC) showed this week. Technically recoverable resources at Buda Limestone are estimated at 184 billion cubic feet of gas and…

قبل 23 ساعة
INTEnergy Newsoilprice:oilprice-article-44771أخبارIn force

China Is Quietly Winning the Clean Energy Trade War

China’s clean energy dominance is growing. Buoyed by the skyrocketing energy needs and future projected demands of the artificial intelligence boom, clean energy projects are getting greenlit at a breakneck pace. And those projects depend on cheap Chinese clean energy components, as Beijing has near-total control of global supply chains for clean energy tech including solar panels and lithium-ion batteries for electric vehicles as well as energy storage systems. As a result, Chinese clean energy exports are going gangbusters in virtually…

قبل يوم واحد
INTEnergy Newsoilprice:oilprice-article-44760أخبارIn force

NASA Eyes Moon Base Powered by Solar Panels and Nuclear Reactors

With major plans for space travel, several governments are proposing lunar energy production, including solar and nuclear projects. In May, NASA announced plans to send robotic landers, hopping drones, and vehicles to the moon as part of the United States government’s plans to develop a lunar base. NASA is expected to develop the machines alongside Intuitive Machines, Astrobotic, Blue Origin, and Elon Musk’s SpaceX. The United States aims to land its astronauts back on the moon before President Donald Trump leaves office in 2029, 60…

قبل يوم واحد
INTEnergy Newsoilprice:oilprice-article-44767أخبارIn force

The AI Power Crisis Is Creating a Massive New Market for Fuel Cells

Data center developers are scrambling for reliable power, turning away from congested grids and toward on-site fuel cells. Rystad Energy research and analysis projects a tenfold increase in fuel cell market revenues by 2030, rising from around $2.8 billion in 2025 to roughly $30 billion, as AI computing demand drives unprecedented growth in data center construction. A contracted order book of approximately 9 gigawatts (GW), including framework agreements with Oracle, AEP, Equinix, and Brookfield, points to growing confidence among major operators…

قبل يوم واحد