Country / jurisdiction: Slovak Republic · Year: 2013 · Status: In force · Level: National · Type: Voluntary
Regulation No.221/2013 on determination of price regulation in electroenergy sector stipulates several basic principles which will be applied from the 1 st of January 2014, especially prices as indicated in the below table.
Plants of maximum capacity of 125 MW are eligible to participate in the FIT programme.
Renewable energy production facility
Period of time
Feed-in tariff levels in EUR/MWh for facilities put into operation from:
1 st Jan 2014
1 st Jan 2015
Hydropower
< 100 kW
15 years
111,27
100 kW – 200 kW
109,17
200 kW – 500 kW
106,84
500 kW – 1 MW
105,15
1 MW – 5 MW
97,98
Solar PV placed on the roof or
external cladding of one building, connected with soil
Up to 30 kW
98,94
88,89
Wind
70,30
62,49
Geothermal
155,13
Combustion or co –firing using by combined energy
production
purposely grown biomass excl. cereal straw
92,09
other waste biomass excl. cereal straw
100,63
96,90
cereal straw
126,10
107,21
bioliquids
94,36
91,79
co-firing of biologically decomposable fragments of
municipal waste with fossil fuels
100,49
Landfill gas or sewage gas
70,34
Biomethane produced from biogas using anaerobic digestion
< 1 MW
107,53
Biogas plants using anaerobic digestion
< 250 kW
125,29
120.49
250 kW – 500 kW
119,41
110,00
500 kW – 750 kW
110,62
102,95
> 750 kW
107,26
100,23
Biogas produced through thermochemical conversion
122,62
99,21
Biogas produced through anaerobic digestion of bio-degradable waste
118,88
95,50
Official source: https://www.slov-lex.sk/pravne-predpisy/SK/ZZ/2013/221/20160721