دورة الحياة
- نافذ
- آخر تعديل
Country / jurisdiction: Nicaragua · Year: 2013 · Status: In force · Level: National · Type: Voluntary
In order to contribute to the analysis of the technical and economic feasibility of power generation projects derived from the need to increase new power generation capacity based on renewable resources, the Ministry of Energy and Mines developed an Indicative Electricity Generation Plan (2013-2027) under different country energy demand scenarios.
The Plan provides valuable information to operators and the State of Nicaragua; driving the investments required for the development of power generationfor the interconnected national grid.
Official source: http://www.mem.gob.ni%20
المصدر
https://www.iea.org/policies/5262الوثيقة الرسمية لدى الجهة التنظيمية. استشهد دائماً بهذا الرابط — لا بصفحة تفاصيل Vantage — في أدلة الامتثال.