دورة الحياة
- نافذ
- آخر تعديل
Country / jurisdiction: Spain · Year: 2025 · Status: In force · Level: National · Type: Voluntary
Royal Decree 997/2025 introduces urgent measures to reinforce electricity system resilience. It requires CNMC reporting and inspections on voltage control and supply restoration, tasks the system operator with proposing reforms on oscillation damping, ancillary services and technical restrictions, simplifies authorisation for co-located electrochemical storage, defines repowering, requires a national repowering roadmap, and sets deadlines for distribution grid extensions.
Official source: https://www.miteco.gob.es/content/dam/miteco/es/energia/files-1/es-ES/Participacion/Documents/anexos/aeip-sucyr/Proyecto%20RD%20SUCYR.pdf
المصدر
https://www.iea.org/policies/32066الوثيقة الرسمية لدى الجهة التنظيمية. استشهد دائماً بهذا الرابط — لا بصفحة تفاصيل Vantage — في أدلة الامتثال.