دورة الحياة
- نافذ
- آخر تعديل
Country / jurisdiction: Spain · Year: 2025 · Status: In force · Level: National · Type: Voluntary
Auctions for 1.2 GW of co-generation between 2025 and 2027 (400 MW to be auctioned every year). Additional costs from benefits received by these cogeneration units will be passed on to the system costs and are expected to be EUR 295-530 million/yr. Gas co-generation should be ready to consume at least 10% renewable hydrogen. Minimum size of 100 MW
Official source: https://www.miteco.gob.es/es/prensa/ultimas-noticias/2025/febrero/el-miteco-lanza-las-subastas-para-adjudicar-1-200-mw-de-cogenera.html
المصدر
https://www.iea.org/policies/28491الوثيقة الرسمية لدى الجهة التنظيمية. استشهد دائماً بهذا الرابط — لا بصفحة تفاصيل Vantage — في أدلة الامتثال.