INTIEAUnited Kingdom · Hydrogen Allocation Round 1PolicyIn force

Hydrogen Allocation Round 1

Over GBP 2 billion (USD 2.5 billion) of OPEX support was allocated to 11 projects (125 MW of electrolysis) in the first HAR1, with operations to start in 2025. The average strike price was GBP 241/MWh (USD 10.2/kg). Private capital investment of GBP 413 million (USD 525 million)…

آخر تعديل قبل 9 أشهر.

العرض المستخرج للقراءة · النص الأصلي للأدلة الامتثالية

دورة الحياة

  1. نافذ
  2. آخر تعديل

Country / jurisdiction: United Kingdom · Year: 2023 · Status: In force · Level: National · Type: Voluntary

Over GBP 2 billion (USD 2.5 billion) of OPEX support was allocated to 11 projects (125 MW of electrolysis) in the first HAR1, with operations to start in 2025. The average strike price was GBP 241/MWh (USD 10.2/kg). Private capital investment of GBP 413 million (USD 525 million) is expected between 2024-2026

Three projects (31.8 MW) with strike prices of 6.3, 6.7 and 7.1 GBP/kg signed contracts in January 2025 and DESNZ expects to offer contracts to the remaining 8 in early 2025. One more (9.3 MW) with a strike price of GBP 7.1/kg signed a 15-year contract in March 2025

By May 2025, 6 out of 11 had signed contracts

By July 2025, 9 out of 11 had signed contracts (two smallest projects pending)

Official source: https://www.gov.uk/government/publications/hydrogen-production-business-model-net-zero-hydrogen-fund-shortlisted-projects/hydrogen-production-business-model-net-zero-hydrogen-fund-har1-successful-projects

المصدر

https://www.iea.org/policies/27847

الوثيقة الرسمية لدى الجهة التنظيمية. استشهد دائماً بهذا الرابط — لا بصفحة تفاصيل Vantage — في أدلة الامتثال.

ذات صلة في International

INTIEACanada · National Energy Code of Canada for BuildingsPolicyIn force

National Energy Code of Canada for Buildings

The National Energy Code of Canada for Buildings (NECB) 2025 is a national model code that sets technical requirements that address the protection of the environment in the design and construction of new buildings and in subsequent alterations. The 2025 edition was published in…

قبل أسبوعيننافذ.
INTIEACanada · Deep Retrofit Accelerator InitiativePolicyIn force

Deep Retrofit Accelerator Initiative

Launched by Natural Resource Canada in February 2023, the Deep Retrofit Accelerator Initiative (DRAI) provides funding to organisations and projects that facilitate the development of deep retrofits in commercial, institutional, and mid- or high-rise multi-unit residential…

قبل أسبوعيننافذ.
INTIEASweden · Tax exemption for pure and highblend biofuelsPolicyIn force

Tax exemption for pure and highblend biofuels

The Swedish scheme to promote the use of sustainable biofuels in transport has been prolongated until 31 December 2032 with an estimated budget of 1.3 USD billion (SEK 14.2 billion).    The scheme was originally approved by the Commission in November 2003 and prolonged several…

قبل أسبوعيننافذ.
INTIEACanada · Codes Acceleration Fund (CAF)PolicyIn force

Codes Acceleration Fund (CAF)

Launched by Natural Resource Canada in 2023,  the Codes Acceleration Fund (CAF) provides funding to support efforts to accelerate and contribute to code (or regulation) adoption, compliance and enforcement. The programme provides funding to:   • provinces, territories,…

قبل أسبوعيننافذ.
INTIEACanada · Energy Efficiency Regulations, 2016 - Electric motorsPolicyIn force

Energy Efficiency Regulations, 2016 - Electric motors

The Energy Efficiency Regulations set standards for several industrial products and industrial applications of products including motors, air compressors, pumps, dry-type transformers and ceiling fans.     The standards for electric motors were regularly updated, lastly in 2022…

قبل أسبوعيننافذ.