INTIEAItaly · Decree for energy efficiency requirements in buildings (2015)PolicyIn force

Decree for energy efficiency requirements in buildings (2015)

The Ministerial Decree 26 June 2015 completes the transposition of the European Directive EPBD 2002/91/CE, and modifies the Decree 192/2005. This legislative measure comprises three different decrees. The first one ( "Application of calculation methodologies for energy…

آخر تعديل قبل 7 سنوات.

العرض المستخرج للقراءة · النص الأصلي للأدلة الامتثالية

دورة الحياة

  1. نافذ
  2. آخر تعديل

Country / jurisdiction: Italy · Year: 2015 · Status: In force · Level: National · Type: Voluntary

The Ministerial Decree 26 June 2015 completes the transposition of the European Directive EPBD 2002/91/CE, and modifies the Decree 192/2005. This legislative measure comprises three different decrees. The first one ( "Application of calculation methodologies for energy performance and definition of buildings minimum requirements €) also defines the requirements of nearly zero energy buildings and set the new minimum EP and single component requirements, to enter into force starting from October 2015. A new calculation methodology for the energy performance is introduced, based on the comparison with a reference building having the characteristics set in the decree. All energy use needed to comply with the standard use of the building is included in computation of the energy performance of the building, which is referred to different classes.

In the second decree ( "Reference scheme for the technical project reports to apply buildings minimum requirements €), the format for technical project reports is defined, relative to new and nearly zero energy buildings, relevant retrofitting and technical installations.

The last decree ( "Upgrade of national guidelines for energy certification of buildings €) includes the national guidelines for Energy Performance Certificates (EPC), to be in force starting from October 2015. A unique information system harmonising Energy Performance Certification in the different regions was also set for all Italian regions, aimed at the management of a national registry of EPC and thermal installations, to be created by ENEA and the Regions by the end of 2015. Regions are now adopting the new guidelines in force from 1 ° October 2015 and those who already implemented EPBD2 have a 2 years 'period to adapt to the new national methodology.

The past rating system with 8 classes: A+ / A / B / C / D / E / F / G established on the basis of a fixed range of EP index (kWh/mq), is replaced by a new rating system based on 10 adaptable classes (A4 / A3 / A2 / A1 / B / C / D / E / F / G), based on a range proportional to the EP of a virtual reference building (identical to the real one as for geometry, orientation, location in the climatic zone, use, etc) but with predetermined thermal characteristics and energy parameters. This methodology allows calculating the boundary between Energy Performance EPgl,nr index (referred to non renewable primary energy of classes A1 e B). The rating captions of other classes are given by multiplier-reducer coefficients of EPgl,nr,Lst.

EPgl,nr considers all energy services in the building (Heating and cooling, DHW - and lighting and mobility for non-residential). When technical systems are not present in the building, the rating is found simulating the presence of heating and DHW equipments.

Each region should perform yearly a control of minimum of 2% EPCs of the total.

Applicable Building Type(s)

Existing non-residential, Existing residential, New non-residential, New residential

Policy Requirement Level

Mandatory

Governance

Development Authority: Ministry of Economic Development

Implementation Authority: Agenzia Nazionale per l'Efficienza Energetica (ENEA), Regional Authorities

Verification Authority: At regional level

Enforcement Authority: In Italy the penalty system is defined nationally, but the implementation process is regional

Prescriptive Compliance path

According to the new computation method for the energy performance of buildings, energy demand is derived for a reference building, namely a building identical to the analysed one, but with the thermal and energy characteristics defined in the Decree. The analysed building, after energy renovation, should have a total energy demand lower than the reference building. The parameters for the existing building (interested by energy requalification) are provided in order to be used for the calculation of total energy demand.

Energy Requirements:

Insulation

Re

Official source: http://www.sviluppoeconomico.gov.it/index.php/it/normativa/decreti-interministeriali/2032966-decreto-interministeriale-26-giugno-2015-applicazione-delle-metodologie-di-calcolo-delle-prestazioni-energetiche-e-definizione-delle-prescrizioni-e-dei-requisiti-

المصدر

https://www.iea.org/policies/2526

الوثيقة الرسمية لدى الجهة التنظيمية. استشهد دائماً بهذا الرابط — لا بصفحة تفاصيل Vantage — في أدلة الامتثال.

ذات صلة في International

INTEnergy Newsoilprice:oilprice-article-44778أخبارIn force

The $7 Trillion AI Boom Is Turning Into The Energy Trade of the Century

You might think that Shark Tank’s “Mr. Wonderful,” Kevin O’Leary, is betting it all on AI, but he is not. He is betting on the $5+ trillion in infrastructure required to run it, and that’s where big capital is flowing now. And he’s betting on Bitzero (NASDAQ: AIBZ) to be one of the first to break AI’s biggest chokepoint: power. Bitzero was looking further ahead while most of the rest of the market was narrowly focused on AI software and semiconductors. As a result, on May 5th, Bitzero…

قبل 15 ساعة
INTEnergy Newsoilprice:oilprice-article-44774أخبارIn force

One of Texas' Oldest Oil Plays Is Running Dry

The Eagle Ford shale play has shown remarkably consistent crude oil production and rising natural gas output in recent years. A formation beneath the Eagle Ford has been producing for nearly a century, but now it has its remaining resources nearly exhausted. The Buda Limestone formation, which lies beneath the Eagle Ford Group, has limited remaining oil and gas resources, the latest analysis by the U.S. Geological Survey (USGC) showed this week. Technically recoverable resources at Buda Limestone are estimated at 184 billion cubic feet of gas and…

قبل 15 ساعة
INTEnergy Newsoilprice:oilprice-article-44771أخبارIn force

China Is Quietly Winning the Clean Energy Trade War

China’s clean energy dominance is growing. Buoyed by the skyrocketing energy needs and future projected demands of the artificial intelligence boom, clean energy projects are getting greenlit at a breakneck pace. And those projects depend on cheap Chinese clean energy components, as Beijing has near-total control of global supply chains for clean energy tech including solar panels and lithium-ion batteries for electric vehicles as well as energy storage systems. As a result, Chinese clean energy exports are going gangbusters in virtually…

قبل 17 ساعة
INTEnergy Newsoilprice:oilprice-article-44760أخبارIn force

NASA Eyes Moon Base Powered by Solar Panels and Nuclear Reactors

With major plans for space travel, several governments are proposing lunar energy production, including solar and nuclear projects. In May, NASA announced plans to send robotic landers, hopping drones, and vehicles to the moon as part of the United States government’s plans to develop a lunar base. NASA is expected to develop the machines alongside Intuitive Machines, Astrobotic, Blue Origin, and Elon Musk’s SpaceX. The United States aims to land its astronauts back on the moon before President Donald Trump leaves office in 2029, 60…

قبل 19 ساعة
INTEnergy Newsoilprice:oilprice-article-44767أخبارIn force

The AI Power Crisis Is Creating a Massive New Market for Fuel Cells

Data center developers are scrambling for reliable power, turning away from congested grids and toward on-site fuel cells. Rystad Energy research and analysis projects a tenfold increase in fuel cell market revenues by 2030, rising from around $2.8 billion in 2025 to roughly $30 billion, as AI computing demand drives unprecedented growth in data center construction. A contracted order book of approximately 9 gigawatts (GW), including framework agreements with Oracle, AEP, Equinix, and Brookfield, points to growing confidence among major operators…

قبل 23 ساعة