INTIEASwitzerland · Investment Screening ActPolicyIn force

Investment Screening Act

In the framework of the 2023 Investment Screening Act, Switzerland is implementing approval obligations for takeovers of domestic companies by foreign state-controlled investors in certain critical sectors, notably, electricity transmission and production, telecoms and transport…

آخر تعديل قبل سنتين.

العرض المستخرج للقراءة · النص الأصلي للأدلة الامتثالية

دورة الحياة

  1. نافذ
  2. آخر تعديل

Country / jurisdiction: Switzerland · Year: 2023 · Status: In force · Level: National · Type: Voluntary

In the framework of the 2023 Investment Screening Act, Switzerland is implementing approval obligations for takeovers of domestic companies by foreign state-controlled investors in certain critical sectors, notably, electricity transmission and production, telecoms and transport infrastructures.

The takeover of the following undertakings in the energy and technology sector is subject to the approval requirement:

undertakings operating or owning the domestic electricity transmission network (i.e., Swissgrid) or distribution networks on network level 3 or below, if they output at least 450 gigawatt hours per annum (net value of purchases by end consumers or distributors);

undertakings operating or owning domestic energy plants for the production of 100 megawatts or more or domestic telecommunication networks

undertakings operating or owning domestic high-pressure natural gas mains in Switzerland.

undertakings supplying domestic authorities with key safety-relevant IT systems or offering such IT services;

Companies producing dual-use products may also be subjected to these investment screening obligations.

Official source: https://www.seco.admin.ch/seco/en/home/seco/nsb-news.msg-id-99460.html

المصدر

https://www.iea.org/policies/19253

الوثيقة الرسمية لدى الجهة التنظيمية. استشهد دائماً بهذا الرابط — لا بصفحة تفاصيل Vantage — في أدلة الامتثال.

ذات صلة في International

INTIEACanada · National Energy Code of Canada for BuildingsPolicyIn force

National Energy Code of Canada for Buildings

The National Energy Code of Canada for Buildings (NECB) 2025 is a national model code that sets technical requirements that address the protection of the environment in the design and construction of new buildings and in subsequent alterations. The 2025 edition was published in…

قبل أسبوعيننافذ.
INTIEACanada · Deep Retrofit Accelerator InitiativePolicyIn force

Deep Retrofit Accelerator Initiative

Launched by Natural Resource Canada in February 2023, the Deep Retrofit Accelerator Initiative (DRAI) provides funding to organisations and projects that facilitate the development of deep retrofits in commercial, institutional, and mid- or high-rise multi-unit residential…

قبل أسبوعيننافذ.
INTIEASweden · Tax exemption for pure and highblend biofuelsPolicyIn force

Tax exemption for pure and highblend biofuels

The Swedish scheme to promote the use of sustainable biofuels in transport has been prolongated until 31 December 2032 with an estimated budget of 1.3 USD billion (SEK 14.2 billion).    The scheme was originally approved by the Commission in November 2003 and prolonged several…

قبل أسبوعيننافذ.
INTIEACanada · Codes Acceleration Fund (CAF)PolicyIn force

Codes Acceleration Fund (CAF)

Launched by Natural Resource Canada in 2023,  the Codes Acceleration Fund (CAF) provides funding to support efforts to accelerate and contribute to code (or regulation) adoption, compliance and enforcement. The programme provides funding to:   • provinces, territories,…

قبل أسبوعيننافذ.
INTIEACanada · Energy Efficiency Regulations, 2016 - Electric motorsPolicyIn force

Energy Efficiency Regulations, 2016 - Electric motors

The Energy Efficiency Regulations set standards for several industrial products and industrial applications of products including motors, air compressors, pumps, dry-type transformers and ceiling fans.     The standards for electric motors were regularly updated, lastly in 2022…

قبل أسبوعيننافذ.