INTIEAJapan · Financial measures for small- and medium-sized businesses (preferential loan, tax, subsidy)PolicyIn force

Financial measures for small- and medium-sized businesses (preferential loan, tax, subsidy)

Various financial and fiscal incentives have been put in place to encourage small- and medium-sized businesses to invest in energy conservation equipment and facilities. Key measures are: (1) Financial Supporting Measures (2) Green Investment Tax (3) Subsidy System (1)…

آخر تعديل قبل 9 سنوات.

العرض المستخرج للقراءة · النص الأصلي للأدلة الامتثالية

دورة الحياة

  1. نافذ
  2. آخر تعديل

Country / jurisdiction: Japan · Year: 2010 · Status: In force · Level: National · Type: Voluntary

Various financial and fiscal incentives have been put in place to encourage small- and medium-sized businesses to invest in energy conservation equipment and facilities. Key measures are:

(1) Financial Supporting Measures

(2) Green Investment Tax

(3) Subsidy System

(1) Financial Supporting Measures

Special interest rates are applied to installing or leasing the specified energy conservation and non-fossil energy facilities.

In the case of installing energy conservation equipment, the specified equipment that complies with specific conditions can have special interest rates. This includes industrial equipment such as heat pumps, boilers, furnaces, cogeneration systems, dyeing equipment, drying equipment and many more. Specified equipment shall comply with the following conditions:

- Those whose energy conservation effect is 25% or better than already-existing average equipment.

- In case of renewal of the equipment, those whose energy conservation effect is 40% or more than the equipment before renewal.

Special interest loans are available for small and medium sized business who invest in specified energy efficiency equipment and facility. The implementing body for the financial measure is the Japan Finance Corporation – JFC. The types of loans are as follows:

1. Energy efficiency equipment and facilities: Target are factories or workplaces that invest in equipment or facilities (including replacements and modifications) that are expected to achieve more than 1% energy savings.

(3) The government took measures to support business operators by introducing the efficient equipment for energy savings. The amount of the subsidies is 41 billion yen. Before the fiscal year of 2014, the government supported energy-saving activities on a case-by-case basis for buildings and factories, but from the fiscal year of 2015, it supports energy-saving activities for all factories. Moreover, to meet energy-saving needs, power-saving and etc. in small and medium-sized enterprises, the govenment organized regional energy-saving consultation platforms to provide close advice on the subjects related to energy-saving.

Official source: http://www.enecho.meti.go.jp/category/saving_and_new/saving/enterprise/support/

المصدر

https://www.iea.org/policies/1253

الوثيقة الرسمية لدى الجهة التنظيمية. استشهد دائماً بهذا الرابط — لا بصفحة تفاصيل Vantage — في أدلة الامتثال.

ذات صلة في International

INTEnergy Newsoilprice:oilprice-article-44778أخبارIn force

The $7 Trillion AI Boom Is Turning Into The Energy Trade of the Century

You might think that Shark Tank’s “Mr. Wonderful,” Kevin O’Leary, is betting it all on AI, but he is not. He is betting on the $5+ trillion in infrastructure required to run it, and that’s where big capital is flowing now. And he’s betting on Bitzero (NASDAQ: AIBZ) to be one of the first to break AI’s biggest chokepoint: power. Bitzero was looking further ahead while most of the rest of the market was narrowly focused on AI software and semiconductors. As a result, on May 5th, Bitzero…

قبل يوم واحد
INTEnergy Newsoilprice:oilprice-article-44774أخبارIn force

One of Texas' Oldest Oil Plays Is Running Dry

The Eagle Ford shale play has shown remarkably consistent crude oil production and rising natural gas output in recent years. A formation beneath the Eagle Ford has been producing for nearly a century, but now it has its remaining resources nearly exhausted. The Buda Limestone formation, which lies beneath the Eagle Ford Group, has limited remaining oil and gas resources, the latest analysis by the U.S. Geological Survey (USGC) showed this week. Technically recoverable resources at Buda Limestone are estimated at 184 billion cubic feet of gas and…

قبل يوم واحد
INTEnergy Newsoilprice:oilprice-article-44771أخبارIn force

China Is Quietly Winning the Clean Energy Trade War

China’s clean energy dominance is growing. Buoyed by the skyrocketing energy needs and future projected demands of the artificial intelligence boom, clean energy projects are getting greenlit at a breakneck pace. And those projects depend on cheap Chinese clean energy components, as Beijing has near-total control of global supply chains for clean energy tech including solar panels and lithium-ion batteries for electric vehicles as well as energy storage systems. As a result, Chinese clean energy exports are going gangbusters in virtually…

قبل يوم واحد
INTEnergy Newsoilprice:oilprice-article-44760أخبارIn force

NASA Eyes Moon Base Powered by Solar Panels and Nuclear Reactors

With major plans for space travel, several governments are proposing lunar energy production, including solar and nuclear projects. In May, NASA announced plans to send robotic landers, hopping drones, and vehicles to the moon as part of the United States government’s plans to develop a lunar base. NASA is expected to develop the machines alongside Intuitive Machines, Astrobotic, Blue Origin, and Elon Musk’s SpaceX. The United States aims to land its astronauts back on the moon before President Donald Trump leaves office in 2029, 60…

قبل يوم واحد
INTEnergy Newsoilprice:oilprice-article-44767أخبارIn force

The AI Power Crisis Is Creating a Massive New Market for Fuel Cells

Data center developers are scrambling for reliable power, turning away from congested grids and toward on-site fuel cells. Rystad Energy research and analysis projects a tenfold increase in fuel cell market revenues by 2030, rising from around $2.8 billion in 2025 to roughly $30 billion, as AI computing demand drives unprecedented growth in data center construction. A contracted order book of approximately 9 gigawatts (GW), including framework agreements with Oracle, AEP, Equinix, and Brookfield, points to growing confidence among major operators…

قبل يوم واحد