CACERCanadian Energy Regulator Act, s. 47Primary legislationIn force

Replacement of commissioner during hearing

Procedural rule under the Canadian Energy Regulator Act allowing the Lead Commissioner to designate a replacement commissioner to continue hearings or render decisions if the assigned commissioner becomes unable to act or resigns during proceedings or between hearing conclusion and decision issuance.

آخر تعديل قبل 4 ساعات.

العرض المستخرج للقراءة · النص الأصلي للأدلة الامتثالية

Replacement of commissioner during hearing

47 (1) If a commissioner who is conducting a hearing in accordance with an authorization under section 45 or 46 is unable to act or resigns during the hearing, the Lead Commissioner may authorize another commissioner to continue the hearing and to make the decision or report. (2) If a commissioner who is conducting a hearing in accordance with an authorization under section 45 or 46 is unable to act or resigns after the conclusion of the hearing but before the decision or report is made, the Lead Commissioner may authorize another commissioner to examine all the evidence presented at the hearing and to make the decision or report on the basis of that evidence.

المصدر

https://laws-lois.justice.gc.ca/eng/acts/C-15.1/section-47.html

الوثيقة الرسمية لدى الجهة التنظيمية. استشهد دائماً بهذا الرابط — لا بصفحة تفاصيل Vantage — في أدلة الامتثال.

ذات صلة في Canada

CACNSCREGDOC-3.5.1GuidanceIn force

Information Dissemination: Licensing Process for Class I Nuclear Facilities and Uranium Mines and Mills, Version 2.1

قبل 4 ساعات
CACNSCREGDOC-3.5.4GuidanceIn force

Pre-licensing Review of a Vendor’s Reactor Design

قبل 4 ساعات
CACERCanadian Energy Regulator Act, s. 2Primary legislationIn force

Definitions

Section 2 of the Canadian Energy Regulator Act establishes statutory definitions for federal energy infrastructure regulation, including abandoned facilities and pipelines, oil and gas exports and imports, ground disturbance thresholds for pipeline protection, and incorporates Indigenous governing bodies and knowledge in energy decision-making processes.

قبل 4 ساعات
CACERCanadian Energy Regulator Act, s. 307Primary legislationIn force

Application of sections 317 and 318

Section 307 of the Canadian Energy Regulator Act extends regulatory sections 317 and 318 to offshore renewable energy projects and offshore power lines by substituting references to companies with persons and pipelines with offshore facilities, ensuring equivalent regulatory requirements.

قبل 4 ساعات
CACERCanadian Energy Regulator Act, s. 140Primary legislationIn force

Reimbursement — measures taken by government institution

The Canadian Energy Regulator Commission may order pipeline operators to reimburse federal, provincial, municipal governments, Indigenous bodies, and other persons for reasonable costs incurred responding to unintended or uncontrolled releases of oil, gas, or other commodities from pipelines, even if costs exceed the operator's statutory liability limits.

قبل 4 ساعات