Study and report
310 The Regulator may, by order, direct the holder of an authorization to study any safety or environmental protection issue that relates to their offshore renewable energy project or offshore power line and to report to the Regulator on the results within the period specified in the order.
المصدر
https://laws-lois.justice.gc.ca/eng/acts/C-15.1/section-310.htmlالوثيقة الرسمية لدى الجهة التنظيمية. استشهد دائماً بهذا الرابط — لا بصفحة تفاصيل Vantage — في أدلة الامتثال.