CACERCanadian Energy Regulator Act, s. 302Primary legislationIn force

Recovery of loss, etc., caused by debris

Section 302 of the Canadian Energy Regulator Act establishes strict liability for losses, damages, and costs arising from debris generated during authorized energy work. Authorization holders are liable up to $1 billion (with reduced limits in Arctic Waters), while parties responsible for debris are jointly and severally liable based on fault. Claims prioritize personal losses, then government costs, then non-use value losses (recoverable only by government).

آخر تعديل قبل 6 ساعات.

العرض المستخرج للقراءة · النص الأصلي للأدلة الامتثالية

Recovery of loss, etc., caused by debris

302 (1) If, as a result of debris or as a result of any action or measure taken in relation to debris, there is a loss of non-use value relating to a public resource or any person incurs actual loss or damage, or if Her Majesty in right of Canada or a province reasonably incurs any costs or expenses in taking any action or measure in relation to debris, (a) all persons to whose fault or negligence the debris is attributable or who are by law responsible for others to whose fault or negligence the debris is attributable are jointly and severally, or solidarily, liable, to the extent determined according to the degree of the fault or negligence proved against them, for that loss, actual loss or damage and for those costs and expenses; and (b) the person who is required to obtain an authorization in respect of the work or activity from which the debris originated is liable, without proof of fault or negligence, up to the applicable limit of liability that is determined under this section, for that loss, actual loss or damage and for those costs and expenses. (2) A person who is required to obtain an authorization and who retains, to carry on a work or activity for which an authorization is required, the services of a contractor to whom paragraph (1)(a) applies is jointly and severally, or solidarily, liable with that contractor for any actual loss or damage, costs and expenses and loss of non-use value described in subsection (1). (3) For the purposes of paragraph (1)(b), the limits of liability are (a) in respect of a work or activity in any area of land or submarine area referred to in paragraph 6(1)(a) of the Arctic Waters Pollution Prevention Act, the amount by which $1 billion exceeds the amount prescribed under section 9 of that Act in respect of any activity or undertaking engaged in or carried on by any person described in paragraph 6(1)(a) of that Act; or (b) in respect of any other work or activity for which an authorization is required, the amount of $1 billion. (4) The Minister may, by order and on the Commission’s recommendation, approve an amount that is less than the amount referred to in paragraph (3)(a) or (b) in respect of a person who is required to obtain an authorization. (5) The Governor in Council may, by regulation, on the recommendation of the Minister, increase the amounts referred to in subsection (3). (6) If a person is liable under paragraph (1)(b) with respect to an occurrence and the person is also liable under any other Act of Parliament, without proof of fault or negligence, for the same occurrence, the person is liable up to the greater of the applicable limit of liability that is determined under the applicable subsection of this section and the limit up to which the person is liable under the other Act. If the other Act does not set out a limit of liability, the limits determined under this section do not apply. (7) The costs and expenses that are recoverable by Her Majesty in right of Canada or a province under this section are not recoverable under subsection 42(1) of the Fisheries Act. (8) Only Her Majesty in right of Canada or a province may bring an action to recover a loss of non-use value described in subsection (1). (9) All claims under this section may be sued for and recovered in any court of competent jurisdiction in Canada. Claims in favour of persons incurring actual loss or damage described in subsection (1) are to be distributed pro rata and rank in priority over claims for costs and expenses described in that subsection, and the claims for costs and expenses rank in priority over claims to recover a loss of non-use value described in that subsection. (10) Subject to subsections (7) and (8), nothing in this section suspends or limits (a) any legal liability or remedy for an act or omission by reason only that the act or omission is an offence under this Act or gives rise to liability under this section; (b) any recourse, indemnity or relief available at law to a person who is liable under this section against any other person; or (c) the operation of any applicable law or rule of law that is not inconsistent with this section. (11) Proceedings in respect of claims under this section may be instituted no later than the third anniversary of the day on which the loss, damage, costs or expenses occurred but in no case after the sixth anniversary of the day the facility, equipment or system in question was abandoned or the material in question broke away or was jettisoned or displaced. (12) In this section, actual loss or damage includes loss of income, including future income, and, with respect to any Indigenous peoples of Canada, loss of hunting, fishing and gathering opportunities. It does not include loss of income recoverable under subsection 42(3) of the Fisheries Act.

المصدر

https://laws-lois.justice.gc.ca/eng/acts/C-15.1/section-302.html

الوثيقة الرسمية لدى الجهة التنظيمية. استشهد دائماً بهذا الرابط — لا بصفحة تفاصيل Vantage — في أدلة الامتثال.

ذات صلة في Canada

CACERCanadian Energy Regulator Act, s. 260Primary legislationIn force

Effect of election

Section 260 of the Canadian Energy Regulator Act establishes that filing an election under section 259 for international power lines prevents new permit issuance, converts pending applications to certificate applications, and revokes existing permits or certificates. Applicants or permit holders who file the election and are acquiring or leasing land become liable for all damages and reasonable costs incurred by landowners from abandonment of such acquisition or lease.

قبل 6 ساعات
CACNSCREGDOC-1.5.1GuidanceIn force

Application Guide: Certification of Radiation Devices or Class II Prescribed Equipment, Version 1.1

REGDOC-1.5.1 v1.1 is a Canadian Nuclear Safety Commission application guide helping applicants prepare and submit certification applications for radiation devices and Class II prescribed equipment. The guide ensures prescribed equipment is safe, protects public health and environment, meets national security standards, and complies with Canada's international nuclear obligations under the Nuclear Safety and Control Act.

قبل 6 ساعات
CACERCanadian Energy Regulator Act, s. 274Primary legislationIn force

Relocation

The Canadian Energy Regulator may order holders of international or interprovincial power line permits or certificates to relocate infrastructure when necessary to facilitate construction or relocation of other facilities. The regulator determines cost allocation between parties, requires mandatory consultation procedures, and may order reimbursement of reasonable costs incurred by persons making submissions.

قبل 6 ساعات
CACNSCREGDOC-1.1.1GuidanceIn force

Site Evaluation and Site Preparation for New Reactor Facilities, Version 1.3

REGDOC-1.1.1 establishes Canadian Nuclear Safety Commission requirements for site evaluation and preparation of new reactor facilities, including nuclear power plants and small modular reactors. Applicants must characterize sites, assess severe external events and multiple simultaneous accidents, and demonstrate adequate safety measures during site preparation and construction using a risk-informed, graded approach.

قبل 6 ساعات
CACERCanadian Energy Regulator Act, s. 160Primary legislationIn force

Application

Section 160 of the Canadian Energy Regulator Act establishes a compensation claims tribunal where persons, organizations, governments, and Indigenous governing bodies may file claims for damages caused by pipeline releases from designated companies within prescribed timeframes. The Tribunal Chairperson must promptly assign claims to panels and notify all relevant parties.

قبل 6 ساعات