CACERCanadian Energy Regulator Act, s. 266Primary legislationIn force

Application of certain provisions

Section 266 of the Canadian Energy Regulator Act extends pipeline regulatory provisions to international and interprovincial power lines. Applicants and permit/certificate holders must follow intervention, certification, and permitting procedures under specified sections. Deviations crossing navigable waters require heightened scrutiny under section 211. Abandonment provisions do not apply to power lines.

آخر تعديل قبل 4 ساعات.

العرض المستخرج للقراءة · النص الأصلي للأدلة الامتثالية

Application of certain provisions

266 (1) Sections 182 and 199 to 211 and Part 6, except sections 315 to 318, 335, 341 and 342, apply in respect of international and interprovincial power lines referred to in section 264 as if each reference in any of those provisions to (a) a company were a reference to the applicant for or holder of the permit or certificate issued in respect of the power line; (b) a pipeline were a reference to the international or interprovincial power line; and (c) hydrocarbons or any other commodity were a reference to electricity. (2) If a deviation is required to be made to a part of an international power line by the holder of a permit or certificate issued in respect of the power line and the deviation passes in, on, over, under, through or across a navigable water, section 211 also applies to that part as if each reference in that section to (a) a company were a reference to the holder of the permit or certificate; and (b) a pipeline were a reference to the international power line. (3) Subsection 224(1) applies in respect of an international or interprovincial power line referred to in section 264 as if the reference to “any of the circumstances referred to in subsection (2)” were a reference to any of the following circumstances: (a) leave has been obtained under subsection 272(2) or (5) in respect of the power line; (b) the permit referred to in section 248, or the certificate, issued in respect of the power line contains a condition relating to the utility referred to in subsection 224(1); (c) the power line has been constructed in circumstances specified in an order or regulation made under subsection 272(4); (d) a permit referred to in section 248, or a certificate, has been issued in respect of the power line and the power line passes in, on, over, under, through or across a navigable water; and (e) leave had been obtained under section 108 of the National Energy Board Act in respect of the power line at any time before July 3, 2013. (4) A reference to an abandoned pipeline in the provisions referred to in this section is not a reference to an abandoned international or interprovincial power line.

المصدر

https://laws-lois.justice.gc.ca/eng/acts/C-15.1/section-266.html

الوثيقة الرسمية لدى الجهة التنظيمية. استشهد دائماً بهذا الرابط — لا بصفحة تفاصيل Vantage — في أدلة الامتثال.

ذات صلة في Canada

CACNSCREGDOC-3.5.1GuidanceIn force

Information Dissemination: Licensing Process for Class I Nuclear Facilities and Uranium Mines and Mills, Version 2.1

قبل 4 ساعات
CACNSCREGDOC-3.5.4GuidanceIn force

Pre-licensing Review of a Vendor’s Reactor Design

قبل 4 ساعات
CACERCanadian Energy Regulator Act, s. 2Primary legislationIn force

Definitions

Section 2 of the Canadian Energy Regulator Act establishes statutory definitions for federal energy infrastructure regulation, including abandoned facilities and pipelines, oil and gas exports and imports, ground disturbance thresholds for pipeline protection, and incorporates Indigenous governing bodies and knowledge in energy decision-making processes.

قبل 4 ساعات
CACERCanadian Energy Regulator Act, s. 307Primary legislationIn force

Application of sections 317 and 318

Section 307 of the Canadian Energy Regulator Act extends regulatory sections 317 and 318 to offshore renewable energy projects and offshore power lines by substituting references to companies with persons and pipelines with offshore facilities, ensuring equivalent regulatory requirements.

قبل 4 ساعات
CACERCanadian Energy Regulator Act, s. 140Primary legislationIn force

Reimbursement — measures taken by government institution

The Canadian Energy Regulator Commission may order pipeline operators to reimburse federal, provincial, municipal governments, Indigenous bodies, and other persons for reasonable costs incurred responding to unintended or uncontrolled releases of oil, gas, or other commodities from pipelines, even if costs exceed the operator's statutory liability limits.

قبل 4 ساعات