CACERCanadian Energy Regulator Act, s. 202Primary legislationIn force

Public hearing

Section 202 of the Canadian Energy Regulator Act requires the Commission to hold a public hearing when written statements are filed regarding pipeline projects. The Commission must select a convenient hearing location with stated reasons, publish notice locally, notify statement-filers, and permit them and other interested parties to present representations. The Commission may inspect affected lands and may disregard frivolous, withdrawn, or bad-faith statements.

آخر تعديل قبل 3 ساعات.

العرض المستخرج للقراءة · النص الأصلي للأدلة الامتثالية

Public hearing

202 (1) If a written statement is filed with the Regulator under subsection 201(3) or (4) within the period set out in that subsection, the Commission must order that a public hearing be held. (2) The Commission must select a region in which to hold the hearing that it considers convenient for persons who filed a written statement under subsection 201(3) or (4) and must provide reasons for its selection, including the factors that it took into account. (3) The Commission must fix a suitable time and place for the hearing and cause notice of the time and place to be given by publishing it in at least one issue of a publication, if any, in general circulation within the area in which the lands are situated and by sending it to each person who filed a written statement under subsection 201(3) or (4). (4) At the time and place fixed for the hearing, the Commission must hold a hearing and must permit each person who filed a written statement under subsection 201(3) or (4) to make representations and may, if the Commission considers it appropriate to do so, allow any other interested person to make representations before it. (5) The Commission or a person authorized by it may inspect the lands that are proposed to be acquired, leased, taken or used for, or that are affected by, the pipeline construction as the Commission considers necessary. (6) The Commission may at any time disregard a written statement filed under subsection 201(3) or (4) and is not required to take any action under this section with respect to that statement, if (a) the person who filed the statement files a notice of withdrawal with the Regulator; or (b) the Commission considers that the statement is frivolous or vexatious or is not made in good faith.

المصدر

https://laws-lois.justice.gc.ca/eng/acts/C-15.1/section-202.html

الوثيقة الرسمية لدى الجهة التنظيمية. استشهد دائماً بهذا الرابط — لا بصفحة تفاصيل Vantage — في أدلة الامتثال.

ذات صلة في Canada

CACNSCREGDOC-3.5.1GuidanceIn force

Information Dissemination: Licensing Process for Class I Nuclear Facilities and Uranium Mines and Mills, Version 2.1

قبل 3 ساعات
CACNSCREGDOC-3.5.4GuidanceIn force

Pre-licensing Review of a Vendor’s Reactor Design

قبل 3 ساعات
CACERCanadian Energy Regulator Act, s. 2Primary legislationIn force

Definitions

Section 2 of the Canadian Energy Regulator Act establishes statutory definitions for federal energy infrastructure regulation, including abandoned facilities and pipelines, oil and gas exports and imports, ground disturbance thresholds for pipeline protection, and incorporates Indigenous governing bodies and knowledge in energy decision-making processes.

قبل 3 ساعات
CACERCanadian Energy Regulator Act, s. 307Primary legislationIn force

Application of sections 317 and 318

Section 307 of the Canadian Energy Regulator Act extends regulatory sections 317 and 318 to offshore renewable energy projects and offshore power lines by substituting references to companies with persons and pipelines with offshore facilities, ensuring equivalent regulatory requirements.

قبل 3 ساعات
CACERCanadian Energy Regulator Act, s. 140Primary legislationIn force

Reimbursement — measures taken by government institution

The Canadian Energy Regulator Commission may order pipeline operators to reimburse federal, provincial, municipal governments, Indigenous bodies, and other persons for reasonable costs incurred responding to unintended or uncontrolled releases of oil, gas, or other commodities from pipelines, even if costs exceed the operator's statutory liability limits.

قبل 3 ساعات