Lifecycle
- Effective
- Last change
Country / jurisdiction: Peru · Year: 2009 · Status: In force · Level: National · Type: Voluntary
Since 2009 Peru has held renewable-energy auctions for grid connected generation and for off-grid electrification, based on the framework established by Law No. 28832 of 2006 and Decree 1002 of 2008.
The following table provides a summary of auctions in Peru. The amount of electricity (GWh) auctioned in each call is calculated according to the projected needs to meet the national 5% target minus the renewable energy (other than hydro) already contracted. Auctions are technology specific and have a non-disclosed price-cap per technology, with offers above the cap automatically disqualified.
Auction
Date
Type
Wind
(GWh/yr)
Solar
(GWh/yr)
Biomass
(GWh/yr)
Hydro*
(GWh/yr)
4th RE auction
Feb-16
Required
1300
450
Awarded
738.6
523.4
29
448.2
3rd RE auction
Aug-13
Required
1300
Awarded
N/A
N/A
N/A
1278 (240 MW)
2nd RE auction
Apr-11
Required
419
43
593
681
Awarded
416
43
14
680 (102 MW)
1st Auction, 2nd call
Mar-10
Required
419
338 MW
Awarded
N/A
11.7 (1.5MW)
92 (19 MW)
1st Auction, 1st Call
Oct-09
Required
320
181
813
500 MW
Awarded
571
173
143
161 MW
1st off-grid RE auction
Nov-14
**
* only hydro < 20MW is considered renewable as per Decree 1002 of 2008
**500000 systems of varying capacity from 80W to 1kW.
Official source: https://www2.osinerg.gob.pe/EnergiasRenovables/contenido/SubastasAnteriores.html
Source
https://www.iea.org/policies/6310Canonical document at the regulator. Always cite this URL — not the Vantage detail page — in compliance evidence.