INTIEAUruguay · Private generation of photovoltaic energy (Auctions and Feed-in Tariffs)PolicyIn force

Private generation of photovoltaic energy (Auctions and Feed-in Tariffs)

The Decree stipulates the terms of the Power Purchase Agreement (PPA) between the National Electricity Utility (UTE) and electricity generators who produce solar photovoltaic energy. It established a 206MW auction for solar PV plants ranging between 500kW and 50MW each. The…

Last changed 1 year ago.

Extracted view for reading · Original for compliance evidence

Lifecycle

  1. Effective
  2. Last change

Country / jurisdiction: Uruguay · Year: 2013 · Status: In force · Level: National · Type: Voluntary

The Decree stipulates the terms of the Power Purchase Agreement (PPA) between the National Electricity Utility (UTE) and electricity generators who produce solar photovoltaic energy.

It established a 206MW auction for solar PV plants ranging between 500kW and 50MW each. The decree sets three tranches according to plant size: (1): 500kW-1MW; (2) 1-5MW; and (3) 5-50MW, with a maximum total capacity to be installed per tranche of 1MW, 5MW and 200MW respectively.

For tranches 1 and 2, the decree sets a competitive auction to award 25-year PPAs. Tranche 2 PPAs will be awarded only if the price is at least 20% lower than tranche 1. For tranche 3, 20-30 year PPAs are awarded in USD with a linearly decreasing tariff from USD 91.5/MWh if operative by December 2014, to USD 86.6/MWh if operative by December 2015 (as amended by Decree 420-013).

Other requirement under the Decree are as follows:

All projects required at least 20% local content (which excluded furniture or renting of equipment) and carbon credits from the CDM or any future carbon mechanism will accrue to the project owner.

The PV panels, inverters and rest of equipment had to be new.

A strong bid guarantee system was imposed. In addition to the 1% bidding guarantee, there was a contract guarantee of 5% of expected revenue over ten years at the time of signing the PPA. Guarantees are mostly recovered upon entry into service of the plant.

The generator must bear all costs related to grid connection and expansion.

The National Electric Utility (UTE) shall be the only purchaser of energy from the producer at the set price and number of years as agreed in the contract.

In late 2014 there were 194MW of signed PPAs under the Decree.

Official source: http://archivo.presidencia.gub.uy/sci/decretos/2013/05/miem_840.pdf%20

Source

https://www.iea.org/policies/5536

Canonical document at the regulator. Always cite this URL — not the Vantage detail page — in compliance evidence.

Related in International

INTIEACanada · National Energy Code of Canada for BuildingsPolicyIn force

National Energy Code of Canada for Buildings

The National Energy Code of Canada for Buildings (NECB) 2025 is a national model code that sets technical requirements that address the protection of the environment in the design and construction of new buildings and in subsequent alterations. The 2025 edition was published in…

9 days agoeff.
INTIEACanada · Deep Retrofit Accelerator InitiativePolicyIn force

Deep Retrofit Accelerator Initiative

Launched by Natural Resource Canada in February 2023, the Deep Retrofit Accelerator Initiative (DRAI) provides funding to organisations and projects that facilitate the development of deep retrofits in commercial, institutional, and mid- or high-rise multi-unit residential…

9 days agoeff.
INTIEASweden · Tax exemption for pure and highblend biofuelsPolicyIn force

Tax exemption for pure and highblend biofuels

The Swedish scheme to promote the use of sustainable biofuels in transport has been prolongated until 31 December 2032 with an estimated budget of 1.3 USD billion (SEK 14.2 billion).    The scheme was originally approved by the Commission in November 2003 and prolonged several…

9 days agoeff.
INTIEACanada · Codes Acceleration Fund (CAF)PolicyIn force

Codes Acceleration Fund (CAF)

Launched by Natural Resource Canada in 2023,  the Codes Acceleration Fund (CAF) provides funding to support efforts to accelerate and contribute to code (or regulation) adoption, compliance and enforcement. The programme provides funding to:   • provinces, territories,…

9 days agoeff.
INTIEACanada · Energy Efficiency Regulations, 2016 - Electric motorsPolicyIn force

Energy Efficiency Regulations, 2016 - Electric motors

The Energy Efficiency Regulations set standards for several industrial products and industrial applications of products including motors, air compressors, pumps, dry-type transformers and ceiling fans.     The standards for electric motors were regularly updated, lastly in 2022…

9 days agoeff.