INTIEAIndia · Solar and Wind Power Generation-Based IncentivesPolicyIn force

Solar and Wind Power Generation-Based Incentives

In January 2008, the federal minister responsible for renewable energy announced that the Indian government would provide a subsidy for solar power plants to help develop renewable energy infrastructure. The subsidy will consist of 12 rupees (USD 0.30) per kilowatt hour for…

Last changed 1 year ago.

Extracted view for reading · Original for compliance evidence

Lifecycle

  1. Effective
  2. Last change

Country / jurisdiction: India · Year: 2008 · Status: In force · Level: National · Type: Voluntary

In January 2008, the federal minister responsible for renewable energy announced that the Indian government would provide a subsidy for solar power plants to help develop renewable energy infrastructure. The subsidy will consist of 12 rupees (USD 0.30) per kilowatt hour for solar photovoltaic power and 10 rupees per kilowatt hour for solar thermal power fed to the electricity grid. A maximum capacity of 10 megawatts from each Indian state will be eligible under the scheme and 5 megawatts per developer. Capital investors will not be eligible to apply. Developers will sell electricity to state-run utilities and the incentives will be paid to them based on the tariff the utilities provide. The incentives, for a period of 10 years, will be over and above any financial assistance provided by the states.

In July 2008, the Ministry of New and Renewable Energy (MNRE) launched a new generation-based incentive scheme for wind power production. The scheme is designed to promote investment in new and large independent wind power producers, to fulfil a target of securing 10, 500 MW of new wind power capacity by 2012. To be eligible, new wind power projects must have at least 5 MW of grid-connected capacity, and must be installed at sites validated by the Centre for Wind Energy Technology. Investors in eligible projects will receive an INR 0.5/kWh payment for ten years, over and above the tariff determined for wind power by the relevant regulatory authorities. The tariff does not apply to investors setting up capacities for captive consumption, third party sale, merchant plants, and to those benefiting from depreciation under the Income Tax Act. The payment will be funded by the MNRE, disbursed through the Renewable Energy Development Agency (IREDA) on a half-yearly basis.

Official source: https://www.mnes.nic.in/pdf/guidelines_spg.pdf

Source

https://www.iea.org/policies/4581

Canonical document at the regulator. Always cite this URL — not the Vantage detail page — in compliance evidence.

Related in International

INTIEACanada · National Energy Code of Canada for BuildingsPolicyIn force

National Energy Code of Canada for Buildings

The National Energy Code of Canada for Buildings (NECB) 2025 is a national model code that sets technical requirements that address the protection of the environment in the design and construction of new buildings and in subsequent alterations. The 2025 edition was published in…

9 days agoeff.
INTIEACanada · Deep Retrofit Accelerator InitiativePolicyIn force

Deep Retrofit Accelerator Initiative

Launched by Natural Resource Canada in February 2023, the Deep Retrofit Accelerator Initiative (DRAI) provides funding to organisations and projects that facilitate the development of deep retrofits in commercial, institutional, and mid- or high-rise multi-unit residential…

9 days agoeff.
INTIEASweden · Tax exemption for pure and highblend biofuelsPolicyIn force

Tax exemption for pure and highblend biofuels

The Swedish scheme to promote the use of sustainable biofuels in transport has been prolongated until 31 December 2032 with an estimated budget of 1.3 USD billion (SEK 14.2 billion).    The scheme was originally approved by the Commission in November 2003 and prolonged several…

9 days agoeff.
INTIEACanada · Codes Acceleration Fund (CAF)PolicyIn force

Codes Acceleration Fund (CAF)

Launched by Natural Resource Canada in 2023,  the Codes Acceleration Fund (CAF) provides funding to support efforts to accelerate and contribute to code (or regulation) adoption, compliance and enforcement. The programme provides funding to:   • provinces, territories,…

9 days agoeff.
INTIEACanada · Energy Efficiency Regulations, 2016 - Electric motorsPolicyIn force

Energy Efficiency Regulations, 2016 - Electric motors

The Energy Efficiency Regulations set standards for several industrial products and industrial applications of products including motors, air compressors, pumps, dry-type transformers and ceiling fans.     The standards for electric motors were regularly updated, lastly in 2022…

9 days agoeff.