Lifecycle
- Effective
- Last change
Country / jurisdiction: Kazakhstan · Year: 2017 · Status: In force · Level: National · Type: Voluntary
This Order establishes requirements for the safety of gas supply system facilities:
when operating gas supply systems;
when operating gas supply systems in special natural and climatic conditions;
explosion safety during operation of gas distribution system facilities and gas consumption of thermal power plants and boiler houses, which apply to boiler plants with a steam capacity of 35 t/h and above and hot water boiler plants with a thermal capacity of 50 Gcal/h and above;
in case of gas-hazardous work;
during the localisation and elimination of accidents.
Under the Order, in case of detection of gas contamination of structures on the gas pipeline route or gas leakage:
the emergency dispatch service and the management of the service are immediately notified;
immediate measures are taken to warn the surrounding people about gas pollution and the inadmissibility of using open fire, using electrical appliances and the need to ventilate the premises;
instrumentation checks and ventilation of gassed basements, basement and first floors of buildings, wells and chambers of underground structures (communications) in a 15-meter and 50-meter zone are organized, in personal protective equipment for the organs of vision and breathing.
Official source: https://adilet.zan.kz/rus/docs/V1700015986
Source
https://www.iea.org/policies/14966Canonical document at the regulator. Always cite this URL — not the Vantage detail page — in compliance evidence.