INTIEANigeria · Procedure Guide for the Design and Construction of Oil and Gas Surface Production FacilitiesPolicyIn force

Procedure Guide for the Design and Construction of Oil and Gas Surface Production Facilities

Applies to all oil and gas surface production facilities in the Nigerian Petroleum Industry.    Governed by Department of Petroleum Resources   Sec. 2 Applicable Government Policies, includes “Zero-Flare compliance" and notes that gas utilization plans shall comply with the…

Dernière modification il y a 5 ans.

Vue extraite pour la lecture · Original pour les preuves de conformité

Cycle de vie

  1. En vigueur
  2. Dernière modification

Country / jurisdiction: Nigeria · Year: 2001 · Status: In force · Level: National · Type: Voluntary

Applies to all oil and gas surface production facilities in the Nigerian Petroleum Industry.

Governed by Department of Petroleum Resources

Sec. 2 Applicable Government Policies, includes “Zero-Flare compliance" and notes that gas utilization plans shall comply with the government directive on the eradication of gas flaring.

Sec. 3.2.1 Conceptual design approval submissions must include a letter of approval of a preliminary EIA Report; detailed design approval submission must include the draft EIA report.

Sec. 3.3.1 sets the noise limits from any facility at no more than 85 dB.

Sec. 3.3.2 Requires flare design to conform with API RP 14C, including to ensure maintenance of flame stability “to avoid excessive and unnecessary flame extinguishments or blow out”; avoidance of flashbacks; and complete combustion.

Sec. 3.3.7 “In the event where it is operationally necessary to vent any hydrocarbon carrying vessels into the atmosphere, venting shall be safely done (.…).

Official source: https://www.nuprc.gov.ng/nuprc-guidelines/#upstream

Source

https://www.iea.org/policies/8669

Document officiel chez le régulateur. Citez toujours cette URL — et non la page de détail Vantage — dans les preuves de conformité.

Connexes dans International