INTIEAUnited States · IECC 2012 with amendments - Commercial Building Code (Ohio)PolicyIn force

IECC 2012 with amendments - Commercial Building Code (Ohio)

Insulation and Fenestration Criteria The building thermal envelope shall meet the requirements of Tables C402.2 and C402.3 based on the climate zone specified in Chapter 3. Commercial buildings or portions of commercial buildings enclosing Group R occupancies shall use the…

Dernière modification il y a 7 ans.

Vue extraite pour la lecture · Original pour les preuves de conformité

Cycle de vie

  1. En vigueur
  2. Dernière modification

Country / jurisdiction: United States · Year: 2017 · Status: In force · Level: State/Provincial · Type: Voluntary

Insulation and Fenestration Criteria

The building thermal envelope shall meet the requirements of Tables C402.2 and C402.3 based on the climate zone specified in Chapter 3. Commercial buildings or portions of commercial buildings enclosing Group R occupancies shall use the R-values from the “Group R” column of Table C402.2. Commercial buildings or portions of commercial buildings enclosing occupancies other than Group R shall use the R-values from the “All other” column of Table C402.2. Buildings with a vertical fenestration area or skylight area that exceeds that allowed in Table C402.3 shall comply with the building envelope provisions of ANSI/ASHRAE/IESNA 90.1.

Specific Insulation Requirements (Prescriptive)

Opaque assemblies shall comply with Table C402.2. Where two or more layers of continuous insulation board are used in a construction assembly, the continuous insulation boards shall be installed in accordance with Section C303.2. If the continuous insulation board manufacturer’s installation instructions do not address installation of two or more layers, the edge joints between each layer of continuous insulation boards shall be staggered.

Fenestration (Prescriptive)

Fenestration shall comply with Table C402.3. Automatic daylighting controls specified by this section shall comply with Section C405.2.2.3.2.

Air Leakage (Mandatory)

The thermal envelope of buildings shall comply with Sections C402.4.1 through C402.4.8.

Service Water Heating (Mandatory)

Water-heating equipment and hot water storage tanks shall meet the requirements of Table C404.2. The efficiency shall be verified through data furnished by the manufacturer or through certification under an approved certification program.

Lighting Controls (Mandatory)

Lighting systems shall be provided with controls as specified in Sections C405.2.1, C405.2.2, C405.2.3 and C405.2.4.

On-Site Renewable Energy

Total minimum ratings of on-site renewable energy systems shall comply with one of the following:

1. Provide not less than 1.75 Btu (1850 W), or not less than 0.50 watts per square foot (5.4 W/m2) of conditioned floor area.

2. Provide not less than 3 percent of the energy used within the building for building mechanical and service water heating equipment and lighting regulated in this chapter.

Total Building Performance

Compliance with this section requires that the criteria of Sections C402.4, C403.2, C404 and C405 be met.

2012 IECC amendments

1. Section C101.4.3

a. Exception 5 shall read "Roof recover or roof repair."

b. Exception 6 shall read "Roofs without insulation in the cavity and where the sheathing or insulation is exposed during reroofing shall be insulated either above or below the sheathing."

c. Renumber exceptions 6, 7, and 8 as 7, 8, and 9.

2. Section C202 add the following definitions

REROOFING. The process of recovering or replacing an existing roof covering. See "Roof recover" and "Roof replacement."

ROOF RECOVER. The process of installing an additional roof covering over a prepared existing roof covering without removing the existing roof covering.

ROOF REPAIR. Reconstruction or renewal of any part of an existing roof for the purpose of its maintenance.

ROOF REPLACEMENT. The process of removing the existing roof covering, repairing any damaged substrate and installing a new roof covering.

3. Section C402.2.1.1

Delete existing section and Table C402.2.1.1 and replace with new section which reads "C402.2.1.1 Roof replacement. For roof replacements, where the existing roof assembly is part of the building thermal envelope and contains insulation entirely above deck, roof replacement shall include compliance with the requirements of Table C402.1.2 or Table C 402.2." 1301.3

Official source: http://bcpad.net/Code%20Books/IECC%202012.pdf

Source

https://www.iea.org/policies/7122

Document officiel chez le régulateur. Citez toujours cette URL — et non la page de détail Vantage — dans les preuves de conformité.

Connexes dans International

INTEnergy Newsoilprice:oilprice-article-44757ActualitésIn force

The $7 Trillion AI Boom Is Running Out of Power

Forget the chips. Forget the code. The most expensive, in-demand commodity in the entire $3-trillion AI revolution is not a patented algorithm or a new Nvidia GPU. It's power. Specifically, a secure, high-voltage connection to the electrical grid that can deliver $100-500 million worth of juice to a new data center. Right now, the largest, richest companies on Earth—Google, Microsoft, Amazon—are in an unprecedented global land rush for energy. They are competing with small cities, massive manufacturing plants, and each other, all because…

il y a 18 heures
INTEnergy Newsoilprice:oilprice-article-44754ActualitésIn force

Colombia's Cocaine Trade Now Outearns Its Oil Exports

Drug lords in Colombia are making more money from cocaine than the government is making from crude oil sales, a report from a Colombian university has found. At $16.5 billion for 2024, cocaine revenues surpassed oil export revenues, which stood at around $15 billion that year, UPI reported, citing the research from EAFIT University. Oil export revenues, however, remain Colombia’s largest export revenue generator, the research showed. Together with coal exports, oil exceeds the illicit trade in cocaine. Still, cocaine revenues in 2024 were…

il y a 20 heures
INTEnergy Newsoilprice:oilprice-article-44752ActualitésIn force

Geothermal Could Power 65 Million U.S. Homes by 2050, DOE Says

“It’s going to be the decade of geothermal,” Cindy Taff, chief executive of geothermal company Sage Geosystems, told The Hill in February of 2025. Over a year later, it is becoming increasingly evident that Taff is definitely onto something. Although geothermal energy is still a tiny sector and faces some significant headwinds when it comes to its up-front installation and development costs, it has numerous competitive edges over other, more common energy sources. It’s clean, it’s constant, it’s politically popular,…

il y a 21 heures
INTEnergy Newsoilprice:oilprice-article-44755ActualitésIn force

Asia's Crude Buying Spree Is Running Out of Steam

Asian refiners have reduced their spot purchases of Middle East crude for loading this month and next, following three weeks in which they had purchased millions of barrels of UAE, Saudi, and Iraqi crude. Lingering uncertainties about the navigability of the Strait of Hormuz and high freight costs have deterred Asian buyers from continuing the buying spree that began earlier this month, with millions of barrels of Abu Dhabi crude snapped up in spot trades. Incentives to Buy Immediately Wane Yet, refiners in Asia have spent the better part of the…

il y a 22 heures
INTEnergy Newsrigzone:https://www.rigzone.com/news/wire/oil_rebounds_after_hormuz_ship_attack-25-jun-2026-183992-article/?rss=trueActualitésIn force

Oil Rebounds After Hormuz Ship Attack

Crude rallied as new shipping disruptions overshadowed expectations of increasing global oil supplies and weaker demand.

il y a 22 heures