Cycle de vie
- En vigueur
- Dernière modification
Country / jurisdiction: Mauritius · Year: 2016 · Status: In force · Level: National · Type: Voluntary
This Grid Code describes the technical criteria and requirements for the connection of distributed generation plants of capacity greater than 200 kW but not exceeding 2 MW to the CEB’s 22 kV distribution network.
This Grid Code caters for the connection to the CEB distribution network and production of electricity by the following list of Renewable Energy Technologies (RETs):
Photovoltaic (PV)
Wind Turbine Generator (WTG)
Hydroelectric Generator
Biomass-based generator
Official source: http://ceb.intnet.mu/msdg/document/Grid%20Code%20MSDG%20more%20than%20200%20kW%20and%20up%20to%202MW%20V3.0.pdf
Source
https://www.iea.org/policies/6431Document officiel chez le régulateur. Citez toujours cette URL — et non la page de détail Vantage — dans les preuves de conformité.