INTIEAIndia · Andhra Pradesh Solar Power Policy 2015PolicyIn force

Andhra Pradesh Solar Power Policy 2015

The Andhra Pradesh Solar Power Policy 2015, in an order to promote solar power projects, was updated from the Andhra Pradesh Solar Power Policy, 2012. Solar Power Projects (SPP) that are commissioned during the operative period of five years shall be eligible for the incentives…

Dernière modification il y a 5 ans.

Vue extraite pour la lecture · Original pour les preuves de conformité

Cycle de vie

  1. En vigueur
  2. Dernière modification

Country / jurisdiction: India · Year: 2015 · Status: In force · Level: State/Provincial · Type: Voluntary

The Andhra Pradesh Solar Power Policy 2015, in an order to promote solar power projects, was updated from the Andhra Pradesh Solar Power Policy, 2012.

Solar Power Projects (SPP) that are commissioned during the operative period of five years shall be eligible for the incentives declared under this policy for a period of ten (10) years from the date of commissioning.

The following incentives are available:

The Government will promote solar rooftop systems on public buildings, domestic, commercial and industrial establishments on gross and or net meter basis. The consumer(s) are free to choose either a net or gross meter option for sale of power to Discom under this policy.

Transmission and Distribution charges shall be exempted for wheeling of power generated from SPPs.

Distribution losses shall be exempted only for SPPs injecting at 33 kV or below.

Banking of 100% of energy shall be permitted for all Captive and Open Access/Scheduled Consumers during all 12 months of the year.

Intra-state Open Access clearance for the whole tenure of the project or 25 years, whichever is earlier.

Electricity duty shall be exempted for captive consumption, sale to Discoms and third party sale provided the source of power is from SPPs setup within the State.

Cross subsidy surcharge shall be exempt for third party sale provided the source of power is from SPPs setup within the State for a period of five (5) years from the date of commissioning of the SPP.

All projects developed with the above incentives will be eligible for REC benefits subject to applicable regulations/orders of the appropriate commission.

For more details on the incentives and others, see the link provided.

Official source: http://nredcap.in/StatePolicies.aspx

Source

https://www.iea.org/policies/6131

Document officiel chez le régulateur. Citez toujours cette URL — et non la page de détail Vantage — dans les preuves de conformité.

Connexes dans International

INTEnergy Newsoilprice:oilprice-article-45490ActualitésIn force

Oil Industry Braces for Years-Long Iran War

Oil producers, traders, and refiners are bracing for a prolonged war between the United States and Iran in the Persian Gulf with little to no hope of a quick resolution. By extension, they are also preparing for higher prices for longer, a theme present at this year’s edition of the Asia Pacific Petroleum Conference. Reuters’ Clyde Russell reported this week that the mood at APPEC was not particularly cheerful as hostilities in the Middle East escalate once again, suggesting achieving peace would be quite a challenge. The Reuters columnist…

il y a 15 heures
INTEnergy Newsoilprice:oilprice-article-45486ActualitésIn force

Stolen Electricity is Powering Illegal Crypto Farms Across the Globe

Electricity theft is a global problem, and it’s getting more dire all the time. While the problem is most common in developing countries, where grid infrastructure is limited and utilities and state authorities have lower oversight capacities, developed countries are not immune either. This theft can occur in many forms and at many scales, from individuals tapping into power lines to power their individual residences to large-scale and sophisticated theft schemes to power entire cryptocurrency mining farms. Just this week, Mexican authorities…

il y a 17 heures
INTEnergy Newsoilprice:oilprice-article-45475ActualitésIn force

The Race to Solve Nuclear Energy’s Biggest Problem

Nuclear power is growing in popularity once again as governments worldwide look to diversify their energy mix and reduce reliance on fossil fuels. Several countries are now looking to develop or expand their nuclear energy capacity over the coming decades. However, one challenge remains – nuclear waste. Disposing of waste materials from nuclear energy operations remains a complex task with no perfect solution. As countries worldwide have grown their nuclear power capacity, many governments are still struggling to decide on the best solution…

il y a 19 heures
INTEnergy Newsoilprice:oilprice-article-45473ActualitésIn force

Iran’s Security Crackdown Runs Into Resistance From Within

Iran's parliament is trying to turn fears of foreign infiltration into law. But as lawmakers work through the legislation, the debate is exposing an increasingly awkward question for the Islamic Republic: How far should the state go in policing Iranians' contact with the outside world? At the center of that debate is Parliament Speaker Mohammad Baqer Qalibaf, who, at least publicly, is doing a balancing act. He has defended the need for tougher measures against foreign infiltration while warning that the current draft of the legislation goes too…

il y a 21 heures
INTEnergy Newsoilprice:oilprice-article-45474ActualitésIn force

Why More Homes Are Switching From Gas to Heat Pumps

Heat pumps are becoming an increasingly popular alternative to gas-powered central heating systems and are increasingly being used in new construction, often driven by government incentives. A heat pump uses technology similar to that found in a refrigerator or an air conditioner, extracting heat from a source, such as the surrounding air, and amplifying and transferring the heat to where it is needed. As most of the heat is transferred rather than generated, heat pumps are far more efficient than conventional heating technologies such as boilers…

il y a 23 heures