Argentina Renewable Energy Auctions - RenovAr Program (Round 1)

The renewable energy auction programme of Argentina (RenovAr) was set in motion with Resolution No. 136/2016, which: Launches an auction process so that bidders can apply to the first round of RenovAr program Approves the bidding terms and conditions of the auction, and…

Dernière modification il y a 9 ans.

Vue extraite pour la lecture · Original pour les preuves de conformité

Cycle de vie

  1. En vigueur
  2. Dernière modification

Country / jurisdiction: Argentina · Year: 2016 · Status: In force · Level: National · Type: Voluntary

The renewable energy auction programme of Argentina (RenovAr) was set in motion with Resolution No. 136/2016, which:

Launches an auction process so that bidders can apply to the first round of RenovAr program

Approves the bidding terms and conditions of the auction, and

Approves the Power Purchase Agreements (PPA) for renewable electricity.

The resolution builds upon the framework defined by Decree 531 and Law 27.191.

The first round of RenovAr auctions was announced in July 2016. All bidders were asked to comply with several requirements, including:

Provide evidence of: proprietary rights over the site location; relevant environmental licenses and permits; acceptable and certified assessment of resources report.

Prove that they have a minimum capital of USD 250,000/MW of power tendered; and provide acceptable guarantees for maintaining the offer (USD 35,000/MW); and fulfilling the contract (USD 250,000/MW).

Have at least 12 months of measurement data.

The summaries of the auction results:

Technology

Capacity Bid (MW)

Capacity Contracted (MW)

Average Price (USD/MWh)

Minimum Price (USD/MWh)

Wind

3,478

708

59.4

49.1

Solar

2,834

400

59.7

59.0

Biogas

53

1.2

118

111.1

Total

6,346

1,109

RenovAr 1 st round tender – w inning projects

Technology

Winning company

Project capacity

Name of the project

Province

Average price of awarded PPA

Onshore wind

Envision

50 MW

Cerro Alto

Río Negro

USD 59.4/MWh

75 MW

Los Meandros

Neuquén

50 MW

Vientos del Secano

Buenos Aires

10 MW

García del Río

Central Térmica Loma La Lata, a subsidiary of Pampa Energía

100 MW

Corti

Buenos Aires

Pan American Energy and 3-Gal

24 MW

Garayalde

Chubut

Consortium Enat-SEG-Otamendi-Nuevo Cerro Dragón

24 MW

Kosten

Eren

97 MW

Vientos Los Hércules

Santa Cruz

Arauco SAPEM

100 MW

Arauco

La Rioja

Solar PV

JEMSE

300 MW

1 st ,2 nd   and 3 rd solar parks (each park 100 MW)

Cauchari

USD 59.7/MWh

Fieldfare and Isolux Corsan

100 MW

4 th solar park

Salta

Biogas

Martín Bacarato

1.2 MW

Ricardone

Santa Fe

USD 118/MWh

123 bids were submitted, for a total capacity of 6,346 MW: the wind capacity was nearly six-time oversubscribed (3,469 MW), while the solar capacity was 9-times oversubscribed (2,813 MW).  Winning projects received contracts for period of 20 years.  The selected projects must be completed in a timeframe of two years.

Given huge participation and low bidding prices, government decided to hold a second round of auctions (called RenovAr 1.5 ) in mid-November 2016 for additional 400 MW of wind and 200 MW of solar PV capacity. Only companies that qualified in the first round of auction, but failed to win a contract, can participate in the RenovAr 1.5.

The second auction round (called  RenovAr 2 ) will take place in the first quarter of 2017.

Official source: http://servicios.infoleg.gob.ar/infolegInternet/anexos/260000-264999/263786/norma.htm

Source

https://www.iea.org/policies/6130

Document officiel chez le régulateur. Citez toujours cette URL — et non la page de détail Vantage — dans les preuves de conformité.

Connexes dans International

INTIEACanada · National Energy Code of Canada for BuildingsPolicyIn force

National Energy Code of Canada for Buildings

The National Energy Code of Canada for Buildings (NECB) 2025 is a national model code that sets technical requirements that address the protection of the environment in the design and construction of new buildings and in subsequent alterations. The 2025 edition was published in…

il y a 2 semaineseff.
INTIEACanada · Deep Retrofit Accelerator InitiativePolicyIn force

Deep Retrofit Accelerator Initiative

Launched by Natural Resource Canada in February 2023, the Deep Retrofit Accelerator Initiative (DRAI) provides funding to organisations and projects that facilitate the development of deep retrofits in commercial, institutional, and mid- or high-rise multi-unit residential…

il y a 2 semaineseff.
INTIEASweden · Tax exemption for pure and highblend biofuelsPolicyIn force

Tax exemption for pure and highblend biofuels

The Swedish scheme to promote the use of sustainable biofuels in transport has been prolongated until 31 December 2032 with an estimated budget of 1.3 USD billion (SEK 14.2 billion).    The scheme was originally approved by the Commission in November 2003 and prolonged several…

il y a 2 semaineseff.
INTIEACanada · Codes Acceleration Fund (CAF)PolicyIn force

Codes Acceleration Fund (CAF)

Launched by Natural Resource Canada in 2023,  the Codes Acceleration Fund (CAF) provides funding to support efforts to accelerate and contribute to code (or regulation) adoption, compliance and enforcement. The programme provides funding to:   • provinces, territories,…

il y a 2 semaineseff.
INTIEACanada · Energy Efficiency Regulations, 2016 - Electric motorsPolicyIn force

Energy Efficiency Regulations, 2016 - Electric motors

The Energy Efficiency Regulations set standards for several industrial products and industrial applications of products including motors, air compressors, pumps, dry-type transformers and ceiling fans.     The standards for electric motors were regularly updated, lastly in 2022…

il y a 2 semaineseff.