INTIEASpain · Electricity sector regulation (Electricity Law 24/2013)PolicyIn force

Electricity sector regulation (Electricity Law 24/2013)

Law 24/2013, of the electricity sector was approved on 26 December 2013, and entries into force on 28 December 2013, replacing the Law 54/1997. It sets up the principle of financial and economic sustainability: the system revenues have to cover all the system costs. Regarding…

Dernière modification il y a 8 ans.

Vue extraite pour la lecture · Original pour les preuves de conformité

Cycle de vie

  1. En vigueur
  2. Dernière modification

Country / jurisdiction: Spain · Year: 2013 · Status: In force · Level: National · Type: Voluntary

Law 24/2013, of the electricity sector was approved on 26 December 2013, and entries into force on 28 December 2013, replacing the Law 54/1997. It sets up the principle of financial and economic sustainability: the system revenues have to cover all the system costs. Regarding renewable energies, it supersedes the existing special regime for electricity producers, maintaining the fundamental principle of previous supporting schemes: a reasonable return.

The provisions contained in Royal Decree-Law 9/2013, of July 12, 2013 have basically been included for the calculation of the for electricity generation using renewable energy sources, high-efficiency cogeneration and waste to energy plants.

Remuneration of renewable energies, high-efficiency CHP and waste to energy facilities, will be based on the necessary participation in the market by these facilities, and will supplement the market revenues with a specific regulated subsidy that will enable these technologies to compete on an equal footing with other technologies in the market. This specific subsidy will be sufficient to attain the minimum level required to cover the investment and operating costs that these technologies cannot recover in the market and may enable them to obtain a suitable return.

In the systems of the no-mainland territories, it can be added an incentive for investment and completion within a given period where the facility entails a significant cost reduction. The subsidy parameter review criteria will be set taking into account the cyclical situation of the economy, electricity demand and appropriate profitability of these activities. It also establishes that the allocation of these subsidies to new facilities should be established through competitive tendering procedures It rules hydroelectric authorizations as well. Even though the producers of electricity using renewable sources, and high efficiency cogeneration will continue to have preference for access and connection to the grid, the electricity coming from these facilities will only have preference for being dispatched under equal economic conditions in the market.

Official source: https://www.boe.es/buscar/pdf/2013/BOE-A-2013-13645-consolidado.pdf

Source

https://www.iea.org/policies/5655

Document officiel chez le régulateur. Citez toujours cette URL — et non la page de détail Vantage — dans les preuves de conformité.

Connexes dans International

INTIEACanada · National Energy Code of Canada for BuildingsPolicyIn force

National Energy Code of Canada for Buildings

The National Energy Code of Canada for Buildings (NECB) 2025 is a national model code that sets technical requirements that address the protection of the environment in the design and construction of new buildings and in subsequent alterations. The 2025 edition was published in…

il y a 2 semaineseff.
INTIEACanada · Deep Retrofit Accelerator InitiativePolicyIn force

Deep Retrofit Accelerator Initiative

Launched by Natural Resource Canada in February 2023, the Deep Retrofit Accelerator Initiative (DRAI) provides funding to organisations and projects that facilitate the development of deep retrofits in commercial, institutional, and mid- or high-rise multi-unit residential…

il y a 2 semaineseff.
INTIEASweden · Tax exemption for pure and highblend biofuelsPolicyIn force

Tax exemption for pure and highblend biofuels

The Swedish scheme to promote the use of sustainable biofuels in transport has been prolongated until 31 December 2032 with an estimated budget of 1.3 USD billion (SEK 14.2 billion).    The scheme was originally approved by the Commission in November 2003 and prolonged several…

il y a 2 semaineseff.
INTIEACanada · Codes Acceleration Fund (CAF)PolicyIn force

Codes Acceleration Fund (CAF)

Launched by Natural Resource Canada in 2023,  the Codes Acceleration Fund (CAF) provides funding to support efforts to accelerate and contribute to code (or regulation) adoption, compliance and enforcement. The programme provides funding to:   • provinces, territories,…

il y a 2 semaineseff.
INTIEACanada · Energy Efficiency Regulations, 2016 - Electric motorsPolicyIn force

Energy Efficiency Regulations, 2016 - Electric motors

The Energy Efficiency Regulations set standards for several industrial products and industrial applications of products including motors, air compressors, pumps, dry-type transformers and ceiling fans.     The standards for electric motors were regularly updated, lastly in 2022…

il y a 2 semaineseff.