INTIEASpain · Plan for the Progressive Replacement of Electricity Meters (Smart meters)PolicyIn force

Plan for the Progressive Replacement of Electricity Meters (Smart meters)

The national Plan for the replacement of electricity meters, as recorded in Order ITC/3860/2007 of 28 December, revising the electric tariffs from 1st January 2008, requires the replacement of all the electricity meters for contract power under 15kW, and installation of…

Dernière modification il y a 9 ans.

Vue extraite pour la lecture · Original pour les preuves de conformité

Cycle de vie

  1. En vigueur
  2. Dernière modification

Country / jurisdiction: Spain · Year: 2008 · Status: In force · Level: National · Type: Voluntary

The national Plan for the replacement of electricity meters, as recorded in Order ITC/3860/2007 of 28 December, revising the electric tariffs from 1st January 2008, requires the replacement of all the electricity meters for contract power under 15kW, and installation of equipment allowing time-of use and telemanagement before 31 December 2018. The said replacement, which mainly affects users in households and SMEs, will be progressive. It will occur in four phases covering the 11 years, each aiming to replace a certain percentage of the electricity meter stock. Specifically, the number of units that each utility service provider (distribution company) needs to replace is established as a percentage of the firms entire meter stock for given kinds of power contracts, and is as follows: - Between 1 January 2008 and 31 December 2010, 30% of the whole meter stock up to 15kW to be replaced; - From 1 January 2011 to 31 December 2012, 20% of the meter stock; - Between 1 January 2013 and 31 December 2015, 20% of the meter stock; - Between 1st January 2016 and 31st December 2018, 30% of the meter stock to be replaced. Distributors must request authorisation for their telemangement systems, equipment and protocols for approval to the Ministry of Industry, Tourism and Trade, and then present their meter substitution plan to the autonomous communities. They must specify the criteria for the installation of meters in each period, specify the number of meters to be installed, and outline how they communicate this information to customers (that installation is required, and that they then have the option of buying or renting the equipment).

Official source: https://www.boe.es/buscar/doc.php?id=BOE-A-2007-22458

Source

https://www.iea.org/policies/1968

Document officiel chez le régulateur. Citez toujours cette URL — et non la page de détail Vantage — dans les preuves de conformité.

Connexes dans International

INTEnergy Newsoilprice:oilprice-article-44778ActualitésIn force

The $7 Trillion AI Boom Is Turning Into The Energy Trade of the Century

You might think that Shark Tank’s “Mr. Wonderful,” Kevin O’Leary, is betting it all on AI, but he is not. He is betting on the $5+ trillion in infrastructure required to run it, and that’s where big capital is flowing now. And he’s betting on Bitzero (NASDAQ: AIBZ) to be one of the first to break AI’s biggest chokepoint: power. Bitzero was looking further ahead while most of the rest of the market was narrowly focused on AI software and semiconductors. As a result, on May 5th, Bitzero…

il y a 11 heures
INTEnergy Newsoilprice:oilprice-article-44774ActualitésIn force

One of Texas' Oldest Oil Plays Is Running Dry

The Eagle Ford shale play has shown remarkably consistent crude oil production and rising natural gas output in recent years. A formation beneath the Eagle Ford has been producing for nearly a century, but now it has its remaining resources nearly exhausted. The Buda Limestone formation, which lies beneath the Eagle Ford Group, has limited remaining oil and gas resources, the latest analysis by the U.S. Geological Survey (USGC) showed this week. Technically recoverable resources at Buda Limestone are estimated at 184 billion cubic feet of gas and…

il y a 11 heures
INTEnergy Newsoilprice:oilprice-article-44771ActualitésIn force

China Is Quietly Winning the Clean Energy Trade War

China’s clean energy dominance is growing. Buoyed by the skyrocketing energy needs and future projected demands of the artificial intelligence boom, clean energy projects are getting greenlit at a breakneck pace. And those projects depend on cheap Chinese clean energy components, as Beijing has near-total control of global supply chains for clean energy tech including solar panels and lithium-ion batteries for electric vehicles as well as energy storage systems. As a result, Chinese clean energy exports are going gangbusters in virtually…

il y a 13 heures
INTEnergy Newsoilprice:oilprice-article-44760ActualitésIn force

NASA Eyes Moon Base Powered by Solar Panels and Nuclear Reactors

With major plans for space travel, several governments are proposing lunar energy production, including solar and nuclear projects. In May, NASA announced plans to send robotic landers, hopping drones, and vehicles to the moon as part of the United States government’s plans to develop a lunar base. NASA is expected to develop the machines alongside Intuitive Machines, Astrobotic, Blue Origin, and Elon Musk’s SpaceX. The United States aims to land its astronauts back on the moon before President Donald Trump leaves office in 2029, 60…

il y a 15 heures
INTEnergy Newsoilprice:oilprice-article-44767ActualitésIn force

The AI Power Crisis Is Creating a Massive New Market for Fuel Cells

Data center developers are scrambling for reliable power, turning away from congested grids and toward on-site fuel cells. Rystad Energy research and analysis projects a tenfold increase in fuel cell market revenues by 2030, rising from around $2.8 billion in 2025 to roughly $30 billion, as AI computing demand drives unprecedented growth in data center construction. A contracted order book of approximately 9 gigawatts (GW), including framework agreements with Oracle, AEP, Equinix, and Brookfield, points to growing confidence among major operators…

il y a 19 heures