INTIEAHungary · Green Investment System (GIS)PolicyIn force

Green Investment System (GIS)

In 2009 two sub-programmes were initiated under the Green Investment Scheme (GIS) to facilitate energy rationalisation of residential buildings: the Climate-friendly Home Panel Sub-programme; and the Energy Efficiency Sub-programme. The objective of these sub-programmes is to…

Dernière modification il y a 9 ans.

Vue extraite pour la lecture · Original pour les preuves de conformité

Cycle de vie

  1. En vigueur
  2. Dernière modification

Country / jurisdiction: Hungary · Year: 2009 · Status: In force · Level: National · Type: Voluntary

In 2009 two sub-programmes were initiated under the Green Investment Scheme (GIS) to facilitate energy rationalisation of residential buildings:

the Climate-friendly Home Panel Sub-programme; and

the Energy Efficiency Sub-programme.

The objective of these sub-programmes is to provide investment grants for work that contributes to the reduction of residential energy comsumption, moderating the overhead burdens for households and also reducing greenhouse gas emissions. Activities eligible for grants include energy-efficiency improvements in buildings (heat insulation, replacement of doors and windows, building engineering solutions) the modernisation of equipment and utilisation of renewable energy sources. The key objective of the sub-programmes is the renovation of houses built by pre-fabricated technology to achieve energy savings through retrofitting.

The prerequisite for receiving a subsidy in the GIS Panel Sub-Plan is that the buildings should have lower CO2 emissions and be more energy efficient once the project is completed. The better results are achieved the higher the subsidy is (Climate bonus subsidy). The system rewards the bidder depending on the complexity and efficiency of the project. The bidders for the "Climate Friendly Home Panel Sub-Programme" under GIS were similar to those for the tender "Subsidy for the Energy Efficient Modernization of Pre-fabricated Buildings" managed by the Ministry of Local Government. Applications under the Energy Efficiency Sub-programme opened 15 December 2009 and closed on 30 October 2010. Applications under the Panel Sub-programme opened 4 August 2009 and closed 31 December 2009.

Official source: http://zbr.kormany.hu/zbr-es-kvotaertekesitesi-rendszer

Source

https://www.iea.org/policies/1371

Document officiel chez le régulateur. Citez toujours cette URL — et non la page de détail Vantage — dans les preuves de conformité.

Connexes dans International

INTEnergy Newsoilprice:oilprice-article-44778ActualitésIn force

The $7 Trillion AI Boom Is Turning Into The Energy Trade of the Century

You might think that Shark Tank’s “Mr. Wonderful,” Kevin O’Leary, is betting it all on AI, but he is not. He is betting on the $5+ trillion in infrastructure required to run it, and that’s where big capital is flowing now. And he’s betting on Bitzero (NASDAQ: AIBZ) to be one of the first to break AI’s biggest chokepoint: power. Bitzero was looking further ahead while most of the rest of the market was narrowly focused on AI software and semiconductors. As a result, on May 5th, Bitzero…

il y a 4 heures
INTEnergy Newsoilprice:oilprice-article-44774ActualitésIn force

One of Texas' Oldest Oil Plays Is Running Dry

The Eagle Ford shale play has shown remarkably consistent crude oil production and rising natural gas output in recent years. A formation beneath the Eagle Ford has been producing for nearly a century, but now it has its remaining resources nearly exhausted. The Buda Limestone formation, which lies beneath the Eagle Ford Group, has limited remaining oil and gas resources, the latest analysis by the U.S. Geological Survey (USGC) showed this week. Technically recoverable resources at Buda Limestone are estimated at 184 billion cubic feet of gas and…

il y a 4 heures
INTEnergy Newsoilprice:oilprice-article-44771ActualitésIn force

China Is Quietly Winning the Clean Energy Trade War

China’s clean energy dominance is growing. Buoyed by the skyrocketing energy needs and future projected demands of the artificial intelligence boom, clean energy projects are getting greenlit at a breakneck pace. And those projects depend on cheap Chinese clean energy components, as Beijing has near-total control of global supply chains for clean energy tech including solar panels and lithium-ion batteries for electric vehicles as well as energy storage systems. As a result, Chinese clean energy exports are going gangbusters in virtually…

il y a 6 heures
INTEnergy Newsoilprice:oilprice-article-44760ActualitésIn force

NASA Eyes Moon Base Powered by Solar Panels and Nuclear Reactors

With major plans for space travel, several governments are proposing lunar energy production, including solar and nuclear projects. In May, NASA announced plans to send robotic landers, hopping drones, and vehicles to the moon as part of the United States government’s plans to develop a lunar base. NASA is expected to develop the machines alongside Intuitive Machines, Astrobotic, Blue Origin, and Elon Musk’s SpaceX. The United States aims to land its astronauts back on the moon before President Donald Trump leaves office in 2029, 60…

il y a 8 heures
INTEnergy Newsoilprice:oilprice-article-44767ActualitésIn force

The AI Power Crisis Is Creating a Massive New Market for Fuel Cells

Data center developers are scrambling for reliable power, turning away from congested grids and toward on-site fuel cells. Rystad Energy research and analysis projects a tenfold increase in fuel cell market revenues by 2030, rising from around $2.8 billion in 2025 to roughly $30 billion, as AI computing demand drives unprecedented growth in data center construction. A contracted order book of approximately 9 gigawatts (GW), including framework agreements with Oracle, AEP, Equinix, and Brookfield, points to growing confidence among major operators…

il y a 12 heures