CACERCanadian Energy Regulator Act, s. 385Primary legislationIn force

Show cause hearing relating to waste

Under the Canadian Energy Regulator Act, the Commission holds show cause hearings on applications by the Chief Conservation Officer regarding waste in oil and gas pool recovery. If waste is found, the Commission may order gas collection, processing, reinjection schemes, or pool repressurizing/recycling, and may shut in non-compliant pools unless approved schemes are operational by specified dates.

Dernière modification il y a 37 minutes.

Vue extraite pour la lecture · Original pour les preuves de conformité

Show cause hearing relating to waste

385 (1) This section applies to applications by the Chief Conservation Officer to the Commission under section 22 of the Canada Oil and Gas Operations Act for a show cause hearing relating to waste, as defined in paragraph 18(2)(f) or (g) of that Act, in the recovery of oil or gas from a pool. (2) On receiving an application, the Commission must make an order requiring the operators within the pool to show cause at a hearing, to be held on a day specified in the order, why the Commission should not make a direction in respect of the waste. (3) On the day specified in the order, the Commission must hold a hearing at which the Chief Conservation Officer, the operators and other interested persons must be given an opportunity to be heard. (4) If, after the hearing, the Commission considers that waste is occurring in the recovery of oil or gas from a pool, it may, by order, (a) direct the introduction of a scheme for the collection, processing, disposition or reinjection of any gas produced from the pool; or (b) direct repressurizing, recycling or pressure maintenance for the pool or any part of the pool and for or incidental to that purpose, direct the introduction or injection of gas, water or any other substance into the pool or any part of the pool. (5) In addition to making an order under subsection (4), the Commission may, by order, direct that the pool or any part of the pool specified in the order be shut in if the requirements of the order are not met or unless a scheme is approved by the Commission and in operation by a date fixed in the order. (6) Despite subsections (4) and (5), the Commission may, by order, permit the continued operation of a pool or any part of a pool after the date fixed by an order made under this section if the Commission considers that a scheme or other action described in paragraph (4)(a) or (b) is in the course of preparation, but the continued operation is subject to any conditions the Regulator imposes.

Source

https://laws-lois.justice.gc.ca/eng/acts/C-15.1/section-385.html

Document officiel chez le régulateur. Citez toujours cette URL — et non la page de détail Vantage — dans les preuves de conformité.

Connexes dans Canada

CACNSCREGDOC-3.5.1GuidanceIn force

Information Dissemination: Licensing Process for Class I Nuclear Facilities and Uranium Mines and Mills, Version 2.1

il y a 37 minutes
CACNSCREGDOC-3.5.4GuidanceIn force

Pre-licensing Review of a Vendor’s Reactor Design

il y a 37 minutes
CACERCanadian Energy Regulator Act, s. 2Primary legislationIn force

Definitions

Section 2 of the Canadian Energy Regulator Act establishes statutory definitions for federal energy infrastructure regulation, including abandoned facilities and pipelines, oil and gas exports and imports, ground disturbance thresholds for pipeline protection, and incorporates Indigenous governing bodies and knowledge in energy decision-making processes.

il y a 37 minutes
CACERCanadian Energy Regulator Act, s. 140Primary legislationIn force

Reimbursement — measures taken by government institution

The Canadian Energy Regulator Commission may order pipeline operators to reimburse federal, provincial, municipal governments, Indigenous bodies, and other persons for reasonable costs incurred responding to unintended or uncontrolled releases of oil, gas, or other commodities from pipelines, even if costs exceed the operator's statutory liability limits.

il y a 37 minutes
CACERCanadian Energy Regulator Act, s. 32Primary legislationIn force

Jurisdiction

The Canadian Energy Regulator has exclusive jurisdiction to investigate non-compliance with the Act and authorization conditions, inquire into accidents involving pipelines, abandoned pipelines, international power lines, and offshore renewable energy projects, and issue findings, recommendations, and orders in the public interest.

il y a 37 minutes