CACERCanadian Energy Regulator Act, s. 274Primary legislationIn force

Relocation

The Canadian Energy Regulator may order holders of international or interprovincial power line permits or certificates to relocate infrastructure when necessary to facilitate construction or relocation of other facilities. The regulator determines cost allocation between parties, requires mandatory consultation procedures, and may order reimbursement of reasonable costs incurred by persons making submissions.

Dernière modification il y a 6 heures.

Vue extraite pour la lecture · Original pour les preuves de conformité

Relocation

274 (1) On the conditions that it considers appropriate, the Commission may, by order, direct the holder of a permit or certificate issued in respect of an international or interprovincial power line to relocate a section or part of the power line if the Commission is of the opinion that the relocation is necessary to facilitate the construction, reconstruction or relocation of a facility. (2) The Commission may, by order, direct by whom and to whom the costs of the relocation are to be paid. (3) The Commission must not make an order under subsection (1) unless the procedures set out in sections 201 to 205 have been complied with in respect of the section or part to be relocated. (4) The Commission may, by order, direct the holder of a permit or certificate issued in respect of an international or interprovincial power line to carry out any of the procedures set out in sections 201 to 205 that the holder would be required to carry out if the holder had submitted to the Regulator a plan, profile and book of reference under subsection 199(1). (5) Sections 201 to 205 apply in respect of any matter related to the carrying out of the procedures set out in those sections as if each reference in those sections to (a) a company were a reference to the holder of the permit or certificate issued in respect of the international or interprovincial power line; and (b) a pipeline were a reference to the international or interprovincial power line. (6) The Commission may, by order, (a) fix an amount that it considers reasonable in respect of the interim or final costs incurred by any person who made or will make representations to the Commission under this section; and (b) direct by whom and to whom the amount is to be paid.

Source

https://laws-lois.justice.gc.ca/eng/acts/C-15.1/section-274.html

Document officiel chez le régulateur. Citez toujours cette URL — et non la page de détail Vantage — dans les preuves de conformité.

Connexes dans Canada

CACERCanadian Energy Regulator Act, s. 260Primary legislationIn force

Effect of election

Section 260 of the Canadian Energy Regulator Act establishes that filing an election under section 259 for international power lines prevents new permit issuance, converts pending applications to certificate applications, and revokes existing permits or certificates. Applicants or permit holders who file the election and are acquiring or leasing land become liable for all damages and reasonable costs incurred by landowners from abandonment of such acquisition or lease.

il y a 6 heures
CACNSCREGDOC-1.5.1GuidanceIn force

Application Guide: Certification of Radiation Devices or Class II Prescribed Equipment, Version 1.1

REGDOC-1.5.1 v1.1 is a Canadian Nuclear Safety Commission application guide helping applicants prepare and submit certification applications for radiation devices and Class II prescribed equipment. The guide ensures prescribed equipment is safe, protects public health and environment, meets national security standards, and complies with Canada's international nuclear obligations under the Nuclear Safety and Control Act.

il y a 6 heures
CACNSCREGDOC-1.1.1GuidanceIn force

Site Evaluation and Site Preparation for New Reactor Facilities, Version 1.3

REGDOC-1.1.1 establishes Canadian Nuclear Safety Commission requirements for site evaluation and preparation of new reactor facilities, including nuclear power plants and small modular reactors. Applicants must characterize sites, assess severe external events and multiple simultaneous accidents, and demonstrate adequate safety measures during site preparation and construction using a risk-informed, graded approach.

il y a 6 heures
CACERCanadian Energy Regulator Act, s. 160Primary legislationIn force

Application

Section 160 of the Canadian Energy Regulator Act establishes a compensation claims tribunal where persons, organizations, governments, and Indigenous governing bodies may file claims for damages caused by pipeline releases from designated companies within prescribed timeframes. The Tribunal Chairperson must promptly assign claims to panels and notify all relevant parties.

il y a 6 heures
CACERCanadian Energy Regulator Act, s. 186Primary legislationIn force

Decision by Governor in Council

Section 186 of the Canadian Energy Regulator Act grants the Governor in Council authority to issue binding orders on pipeline certificate applications following CER recommendations. The Governor may approve certificates with conditions, dismiss applications, or refer recommendations for reconsideration. Orders must include written reasons demonstrating consideration of relevant factors and be issued within 90 days (extendable). Orders are final, must be published in the Canada Gazette within 15 days, and the CER must comply within seven days.

il y a 6 heures