Corpus mondial de réglementations

Parcourir 15,074 réglementations de 36 régulateurs

2,983 mis à jour au cours des 30 derniers jours. Corpus public — aucune inscription requise pour consulter.

Affichage de 1–14 sur 14 réglementations

UKEAgov.uk/government/publications/using-unbound-incinerator-bottom-ash-aggregate-in-construction-rps-325GuidanceIn force

Using unbound incinerator bottom ash aggregate in construction: RPS 325

Environment Agency regulatory position on using unbound incinerator bottom ash aggregate (IBAA) in construction.

il y a 6 jours
UKEAgov.uk/government/publications/sr2024-no-2-using-unbound-incinerator-bottom-ash-aggregate-in-constructionGuidanceIn force

SR2024 No 2: using unbound incinerator bottom ash aggregate in construction

Standard rules for unbound incinerator bottom ash aggregate (IBAA) in construction as a deposit for recovery operation.

il y a 4 semaines
UKEAgov.uk/government/publications/ne33-1rw-keepmoat-homes-limited-environmental-permit-application-advertisement-eprxp3228mna001GuidanceIn force

NE33 1RW, Keepmoat Homes Limited: environmental permit application advertisement - EPR/XP3228MN/A001

View the application submitted by Keepmoat Homes Limited for Holborn Phase 3, Land off West Holborn Road, South Shields, NE33 1RW.

il y a 1 mois
UKHSEgov.uk/government/publications/grenfell-tower-inquiry-government-progress-report-may-2026GuidanceIn force

Grenfell Tower Inquiry Government Progress Report: May 2026

Report on the government’s progress in implementing the Grenfell Tower Inquiry Phase 2 recommendations.

il y a 1 mois
UKEAgov.uk/government/publications/m3-4jh-renaker-build-limited-environmental-permit-application-advertisement-eprap3928mua001GuidanceIn force

M3 4JH, RENAKER BUILD LIMITED: environmental permit application advertisement - EPR/AP3928MU/A001

View the application submitted by RENAKER BUILD LIMITED for Trinity Islands Building C1 & C2, Land North of Water Street, Manchester, M3 4JH

il y a 1 mois
UKEAgov.uk/government/news/minehead-coastal-defences-strengthened-with-new-rock-armourGuidanceIn force

Minehead coastal defences strengthened with new rock armour

The Environment Agency has completed a £1 million coastal flood defence project at Minehead seafront.

il y a 1 mois
UKDESNZgov.uk/government/publications/plug-in-solar-electrical-safety-studyGuidanceIn force

Plug-in solar electrical safety study

UK study testing plug-in solar systems for electrical safety and compatibility with domestic electrical installations to assess suitability and standards compliance.

il y a 1 mois
UKEAgov.uk/government/publications/tq12-5gp-persimmon-homes-environmental-permit-application-advertisement-eprvp3828mpa001GuidanceIn force

TQ12 5GP, Persimmon Homes: environmental permit application advertisement - EPR/VP3828MP/A001

Persimmon Homes submitted an environmental permit application (EPR/VP3828MP/A001) for a development project at Langford Bridge, Augustine Road, Newton Abbot, Devon. The application is being advertised for public review.

il y a 2 mois
UKDESNZgov.uk/government/publications/red-diesel-replacement-competition-successful-projectsGuidanceIn force

Red Diesel Replacement competition: successful projects

UK grant programme supporting development and demonstration of low-carbon technological alternatives to red diesel for use in construction, mining and quarrying operations.

il y a 2 mois
UKDESNZgov.uk/government/collections/national-policy-statements-for-energy-infrastructureGuidanceIn force

National Policy Statements for energy infrastructure

Energy National Policy Statements provide planning guidance for developers of nationally significant energy infrastructure projects in the UK, establishing criteria and procedures for permitting and constructing major energy facilities.

il y a 2 mois
UKEAgov.uk/government/news/vital-annual-beach-work-reduces-flood-risk-on-lincolnshire-coastGuidanceIn force

Vital annual beach work reduces flood risk on Lincolnshire coast

Annual beach maintenance work in Lincolnshire involves placement of approximately 300,000 cubic metres of sand to manage coastal flood risk, protecting 20,000 homes and businesses, 24,500 static caravans, and 35,000 hectares of agricultural land.

il y a 2 mois
UKDESNZgov.uk/government/publications/west-import-resilience-project-environmental-determinationGuidanceIn force

West Import Resilience Project: Environmental determination

Environmental determination for the West Import Resilience Project, covering a new 9km gas pipeline section between Wormington and Honeybourne and a 2km section in Churchover, UK.

il y a 2 mois
UKEAgov.uk/government/publications/ip16-4ur-sizewell-c-limited-eprdb3147lfv003-environmental-permit-application-advertisementGuidanceIn force

IP16 4UR, Sizewell C Limited, EPR/DB3147LF/V003: environmental permit application advertisement

Sizewell C Limited applied for an environmental permit to install a 340-metre rock armour bund along the seaward side of a Temporary Sea Defence section, located within 16 metres of an existing Sea Defence asset.

il y a 2 mois
UKEAgov.uk/government/publications/rm18-8tx-national-highways-limited-environmental-permit-application-advertisement-eprep3322mta001GuidanceIn force

RM18 8TX, National Highways Limited: environmental permit application advertisement – EPR/EP3322MT/A001

National Highways Limited submitted an environmental permit application for the Lower Thames Crossing project at West Tilbury. This advertisement notifies the public of the permit application under EPR/EP3322MT/A001.

il y a 2 mois