Lifecycle
- Effective
- Last change
Country / jurisdiction: Portugal · Year: 2016 · Status: In force · Level: National · Type: Voluntary
Resolution No 49/2016 establishes the 1st and 2nd Phases of the MOBI.E Pilot Network, which is intended to massify the use of electric vehicles in Portugal. The resolution includes:
1. Consider as the 1st phase of the MOBI.E Pilot programme a network composed of 1200 normal charging points and 50 fast charging points, covering 76 municipalities and serving a population of 5.9 million.
2. Complete the first phase of the MOBI.E Pilot Network with the installation of 124 standard charging points and 50 additional fast charging points, available for installation since May 2016.
3. Launch the 2nd phase of the MOBI.E Pilot Network to municipalities not served in the 1st phase of the programme.
4. Include in the 2nd phase of the MOBI.E Pilot Network 202 standard chargers corresponding to about 404 normal power charging points (2 charging points per charger)
Official source: https://dre.pt/home/-/dre/75239711/details/maximized?p_auth=FrJjh17f
Source
https://www.iea.org/policies/7178Canonical document at the regulator. Always cite this URL — not the Vantage detail page — in compliance evidence.