Commercial Energy Efficiency Code Application to replacement fenestration products Where some or all of an existing fenestration unit is replaced with a new fenestration product, including slash and glazing, the replacement fenestration unit shall meet the applicable…

Last changed 7 years ago.

Extracted view for reading · Original for compliance evidence

Lifecycle

  1. Effective
  2. Last change

Country / jurisdiction: United States · Year: 2016 · Status: In force · Level: State/Provincial · Type: Voluntary

Commercial Energy Efficiency Code

Application to replacement fenestration products

Where some or all of an existing fenestration unit is replaced with a new fenestration product, including slash and glazing, the replacement fenestration unit shall meet the applicable requirements for U-factor and SHGC in Table C402.4.

Building Envelope Requirements

Building thermal envelope assemblies for building that are intended to comply with the code on a perspective basis, in accordance with the compliance path described in Item 2 of Section C401.2, shall comply with the following:

The opaque portion of the building thermal envelope shall comply with the specific insulation requirements of Section C402.2 and the thermal requirements of either the R-value –based method of section C 402.1.3; the U-, C-, F-Factor-based method of Section C402.1.4; or the component performance alternative of Section C402.1.5

Roof solar reflectance and thermal emittance shall comply with Section C402.3

Fenestration in building envelope assemblies shall comply with Section C402.4

Air leakage of building envelope assemblies shall comply with Section C402.5

Prescriptive Compliance

Fenestration shall comply with Sections C402.4 through C402.4.4 and Table C402.4. Daylight responsive controls shall comply with this section and Section C405.2.3.1.

Vertical Fenestration: New vertical fenestration area that results in a total building fenestration area less than or equal to that specified in Section C402.4.1 shall comply with Section C402.4. Additions with vertical fenestration that result in a total building fenestration area greater than Section C402.4.1 or additions that exceed the fenestration area greater than Section C402.4.1 shall comply with Section C402.4.1.1 for the addition only. Additions that result in a total building vertical glass area exceeding that specified in Section C402.4.1.1 shall comply with Section C407.

Skylight area

The skylight area shall not be greater than 3 percent of the gross roof area.

In an enclosed space greater than 2,500 square feet (232 m2) in floor area, directly under a roof with not less than 75 percent of the ceiling area with a ceiling height greater than 15 feet (4572 mm), and used as an office, lobby, atrium, concourse, corridor, storage space, gymnasium/exercise center, convention center, automotive service area, space where manufacturing occurs, non-refrigerated warehouse, retail store, distribution/sorting area, transportation depot or workshop, the total daylight zone under skylights shall be not less than half the floor area and shall provide one of the following:

A minimum skylight area to daylight zone under skylights of not less than 3 percent where all skylights have a VT of at least 0.40 as determined in accordance with Section C303.1.3.

A minimum skylight effective aperture of at least 1 percent, determined in accordance with Equation 4-4.

Skylight Effective Aperture= 0.85. ????????????h?? ???????? . ????????????h?? ???? . ????/ ????????????h?? ???????? ?????????? ????????????h?? (Equation 4-4)

where:

Skylight area = Total fenestration area of skylights.

Skylight VT = Area weighted average visible transmittance of skylights.

WF = Area weighted average well factor, where well factor is 0.9 if light well depth is less than 2 feet (610 mm), or 0.7 if light well depth is 2 feet (610 mm) or greater.

Light well depth = Measure vertically from the underside of the lowest point of the skylight glazing to the ceiling plane under the skylight.

Air leakage

The thermal envelop of buildings shall comply with Sections C402.5.1 through C402.5.8, or the building thermal envelope shall be tested in accordance with ASTM E 779 at a pressure differential of 0.3 inch water gauge (75Pa) or an equivalent method approved by the code official and deemed to comply with the provisions of this section when the tested air leakage rate of the building thermal envelope is not greater than 0.4 cfm/ft2 (0.2 L/s.m2

Official source: https://codes.iccsafe.org/content/IECC2015

Source

https://www.iea.org/policies/7134

Canonical document at the regulator. Always cite this URL — not the Vantage detail page — in compliance evidence.

Related in International

INTEnergy Newsoilprice:oilprice-article-44757NewsIn force

The $7 Trillion AI Boom Is Running Out of Power

Forget the chips. Forget the code. The most expensive, in-demand commodity in the entire $3-trillion AI revolution is not a patented algorithm or a new Nvidia GPU. It's power. Specifically, a secure, high-voltage connection to the electrical grid that can deliver $100-500 million worth of juice to a new data center. Right now, the largest, richest companies on Earth—Google, Microsoft, Amazon—are in an unprecedented global land rush for energy. They are competing with small cities, massive manufacturing plants, and each other, all because…

6 hours ago
INTEnergy Newsoilprice:oilprice-article-44754NewsIn force

Colombia's Cocaine Trade Now Outearns Its Oil Exports

Drug lords in Colombia are making more money from cocaine than the government is making from crude oil sales, a report from a Colombian university has found. At $16.5 billion for 2024, cocaine revenues surpassed oil export revenues, which stood at around $15 billion that year, UPI reported, citing the research from EAFIT University. Oil export revenues, however, remain Colombia’s largest export revenue generator, the research showed. Together with coal exports, oil exceeds the illicit trade in cocaine. Still, cocaine revenues in 2024 were…

8 hours ago
INTEnergy Newsoilprice:oilprice-article-44752NewsIn force

Geothermal Could Power 65 Million U.S. Homes by 2050, DOE Says

“It’s going to be the decade of geothermal,” Cindy Taff, chief executive of geothermal company Sage Geosystems, told The Hill in February of 2025. Over a year later, it is becoming increasingly evident that Taff is definitely onto something. Although geothermal energy is still a tiny sector and faces some significant headwinds when it comes to its up-front installation and development costs, it has numerous competitive edges over other, more common energy sources. It’s clean, it’s constant, it’s politically popular,…

9 hours ago
INTEnergy Newsoilprice:oilprice-article-44755NewsIn force

Asia's Crude Buying Spree Is Running Out of Steam

Asian refiners have reduced their spot purchases of Middle East crude for loading this month and next, following three weeks in which they had purchased millions of barrels of UAE, Saudi, and Iraqi crude. Lingering uncertainties about the navigability of the Strait of Hormuz and high freight costs have deterred Asian buyers from continuing the buying spree that began earlier this month, with millions of barrels of Abu Dhabi crude snapped up in spot trades. Incentives to Buy Immediately Wane Yet, refiners in Asia have spent the better part of the…

10 hours ago
INTEnergy Newsrigzone:https://www.rigzone.com/news/wire/oil_rebounds_after_hormuz_ship_attack-25-jun-2026-183992-article/?rss=trueNewsIn force

Oil Rebounds After Hormuz Ship Attack

Crude rallied as new shipping disruptions overshadowed expectations of increasing global oil supplies and weaker demand.

10 hours ago