INTIEAEstonia · Estonia Amendments to the Electricity Market Act establishing reverse auctions and sliding premiumPolicyIn force

Estonia Amendments to the Electricity Market Act establishing reverse auctions and sliding premium

Amendments to the Electricity Market Act, which passed by parliament in June 2018, mandate a reverse auction process in which the government issues tenders for a certain amount of renewable generation. Project developers then compete in a reverse auction where the lowest cost…

Last changed 7 years ago.

Extracted view for reading · Original for compliance evidence

Lifecycle

  1. Effective
  2. Last change

Country / jurisdiction: Estonia · Year: 2018 · Status: In force · Level: National · Type: Voluntary

Amendments to the Electricity Market Act, which passed by parliament in June 2018, mandate a reverse auction process in which the government issues tenders for a certain amount of renewable generation. Project developers then compete in a reverse auction where the lowest cost renewable energy projects that meet qualifying standards are selected to receive a feed-in premium subsidy (Government of Estonia, 2018b). The 2018 Electricity Market Act amendments define the process for the government to organise public tenders with the following objectives:

tenders to increase renewable generation to meet the 2020 target of 17.6% renewable electricity, limited to projects of over 1 MW

tenders to increase renewable generation by 5 GWh per year from 2019 to 2021, limited to projects of 50 kW to 1 MW

tenders for renewable generation to meet obligations stemming from any statistical transfers of renewable energy established under the EU flexible collaboration mechanism

tenders for renewable generation to meet to any targets established by the government beyond 2020.

The government is planning for technology-neutral auctions that allow bids from wind, solar, geothermal, hydropower, biogas and biomass projects. 3 Qualifying projects selected through the auction process receive monthly payments for generating electricity from renewable sources, which are calculated as a sliding premium on top of the market price for electricity.

The premium is equal to EUR 0.0537 per kWh, which is paid on top of the average electricity market price of the last month. The premium is reduced if the average price rises above EUR 0.0393/kWh and reaches zero once the average price is above EUR 0.093/kWh. The sliding premium is guaranteed for 12 years if the project generates the agreed amount of renewable electricity (Government of Estonia, 2018b).

This subsidy scheme encourages project developers to bid by guaranteeing auction winners a minimum payment of EUR 0.0537 per kWh even if the average market price for electricity is very low, or even zero. But it also exposes producers to some market signals as the premium decreases when market prices go up, and the risk of overpayment is eliminated as the premium is gradually reduced to zero if electricity prices increase.

The renewable support scheme established under the 2018 Electricity Market Act amendments maintains a non-competitive feed-in premium for wind, solar, geothermal, hydropower, biogas or biomass projects with a capacity of less than 50 kW. Qualifying projects do not have to participate in auctions, but automatically receive a payment calculated as a sliding premium on top of the market price for electricity delivered to the grid. Payments are calculated using the same floating market premium formula described above, but projects qualifying for the non-competitive feed-in premium are not required to generate any set amount of electricity.

Funding for the renewable support scheme continues to come from a renewable energy charge that supported the previous feed-in premium system. Every electricity customer in Estonia pays this charge, which is collected by Elering, the transmission system operator. There are no exemptions or reductions. In 2019, the charge was EUR 0.0104/kWh.

Official source: https://www.riigiteataja.ee/en/eli/ee/506072018003/consolide

Source

https://www.iea.org/policies/6545

Canonical document at the regulator. Always cite this URL — not the Vantage detail page — in compliance evidence.

Related in International

INTEnergy Newsoilprice:oilprice-article-45490NewsIn force

Oil Industry Braces for Years-Long Iran War

Oil producers, traders, and refiners are bracing for a prolonged war between the United States and Iran in the Persian Gulf with little to no hope of a quick resolution. By extension, they are also preparing for higher prices for longer, a theme present at this year’s edition of the Asia Pacific Petroleum Conference. Reuters’ Clyde Russell reported this week that the mood at APPEC was not particularly cheerful as hostilities in the Middle East escalate once again, suggesting achieving peace would be quite a challenge. The Reuters columnist…

16 hours ago
INTEnergy Newsoilprice:oilprice-article-45486NewsIn force

Stolen Electricity is Powering Illegal Crypto Farms Across the Globe

Electricity theft is a global problem, and it’s getting more dire all the time. While the problem is most common in developing countries, where grid infrastructure is limited and utilities and state authorities have lower oversight capacities, developed countries are not immune either. This theft can occur in many forms and at many scales, from individuals tapping into power lines to power their individual residences to large-scale and sophisticated theft schemes to power entire cryptocurrency mining farms. Just this week, Mexican authorities…

18 hours ago
INTEnergy Newsoilprice:oilprice-article-45475NewsIn force

The Race to Solve Nuclear Energy’s Biggest Problem

Nuclear power is growing in popularity once again as governments worldwide look to diversify their energy mix and reduce reliance on fossil fuels. Several countries are now looking to develop or expand their nuclear energy capacity over the coming decades. However, one challenge remains – nuclear waste. Disposing of waste materials from nuclear energy operations remains a complex task with no perfect solution. As countries worldwide have grown their nuclear power capacity, many governments are still struggling to decide on the best solution…

20 hours ago
INTEnergy Newsoilprice:oilprice-article-45473NewsIn force

Iran’s Security Crackdown Runs Into Resistance From Within

Iran's parliament is trying to turn fears of foreign infiltration into law. But as lawmakers work through the legislation, the debate is exposing an increasingly awkward question for the Islamic Republic: How far should the state go in policing Iranians' contact with the outside world? At the center of that debate is Parliament Speaker Mohammad Baqer Qalibaf, who, at least publicly, is doing a balancing act. He has defended the need for tougher measures against foreign infiltration while warning that the current draft of the legislation goes too…

22 hours ago
INTEnergy Newsoilprice:oilprice-article-45474NewsIn force

Why More Homes Are Switching From Gas to Heat Pumps

Heat pumps are becoming an increasingly popular alternative to gas-powered central heating systems and are increasingly being used in new construction, often driven by government incentives. A heat pump uses technology similar to that found in a refrigerator or an air conditioner, extracting heat from a source, such as the surrounding air, and amplifying and transferring the heat to where it is needed. As most of the heat is transferred rather than generated, heat pumps are far more efficient than conventional heating technologies such as boilers…

24 hours ago