Lifecycle
- Effective
- Last change
Country / jurisdiction: Korea · Year: 2017 · Status: In force · Level: National · Type: Voluntary
A newly constructed public building of which total floor space exceeds 10,000 m2 is obliged to install BEMS (Building Energy Management System) when it applies for a building permit since 2017. The building should obtain verification of the BEMS installation from the KEA (Korea Energy Agency).
Source
https://www.iea.org/policies/6500Canonical document at the regulator. Always cite this URL — not the Vantage detail page — in compliance evidence.