INTIEAGermany · Ground-mounted PV Auction OrdicePolicyIn force

Ground-mounted PV Auction Ordice

As part of the reform of the German Renewable Energy Law in 2014 renewable energy capacity will be procured in Germany via auction system from 2017. In order to ease in to the new system Germany introduced pilot version of the auction system for ground-mounted solar PV. The aim…

Last changed 10 years ago.

Extracted view for reading · Original for compliance evidence

Lifecycle

  1. Effective
  2. Last change

Country / jurisdiction: Germany · Year: 2015 · Status: In force · Level: National · Type: Voluntary

As part of the reform of the German Renewable Energy Law in 2014 renewable energy capacity will be procured in Germany via auction system from 2017. In order to ease in to the new system Germany introduced pilot version of the auction system for ground-mounted solar PV.

The aim of the pilot auction for ground-mounted PV installations is to achieve the expansion targets for renewables in a cost-efficient manner. The pilot auction has ensured that new ground-mounted PV installations are being built while maintaining a high level of public acceptance and stakeholder diversity. At the same time, experience is being gathered for future auctions for other types of renewable energy.

The Ordice was adopted by the cabinet on 28 January 2015 and published in the Federal Law Gazette on 11 February 2015.

Auction system is open only for the ground-mounted solar PV installations with capacity no larger than 10 MW per project and no smaller than 100 kW.

Three auctions per year are planned between 2015 and 2017 according to the following schedule:

15 April 2015 - 150MW

1 August 2015 - 150MW

1 December 2015 - 200MW

1 April 2016 - 125MW

1 August 2016 - 125MW

1 December 2016 - 150MW

1 April 2017 - 100MW

1 August 2017 - 100MW

1 December 2017 - 100MW

Every auction will have an upper bid price limit which will be set by the value of the feed-in tariff for rooftop systems >40kW and < 1MW.

Bids will be made on project capacity in kW and production in euro cents per kWh.

Bidders must provide a deposit of EUR 4/kW bid. The winning bids must provide a secondary deposit of EUR 50/kW within ten working days of the auction winners announcement.

Projects will be remunerated by kWh fed into the grid according to the bid price and not by capacity. The winning bids may not be traded, although entire projects can be.

Official source: http://www.bmwi.de/BMWi/Redaktion/PDF/V/verordnung-zur-einfuehrung-von-ausschreibungen-der-fiziellen-foerderung-fuer-freiflaechelagen,property=pdf,bereich

Source

https://www.iea.org/policies/5950

Canonical document at the regulator. Always cite this URL — not the Vantage detail page — in compliance evidence.

Related in International

INTIEACanada · National Energy Code of Canada for BuildingsPolicyIn force

National Energy Code of Canada for Buildings

The National Energy Code of Canada for Buildings (NECB) 2025 is a national model code that sets technical requirements that address the protection of the environment in the design and construction of new buildings and in subsequent alterations. The 2025 edition was published in…

10 days agoeff.
INTIEACanada · Deep Retrofit Accelerator InitiativePolicyIn force

Deep Retrofit Accelerator Initiative

Launched by Natural Resource Canada in February 2023, the Deep Retrofit Accelerator Initiative (DRAI) provides funding to organisations and projects that facilitate the development of deep retrofits in commercial, institutional, and mid- or high-rise multi-unit residential…

10 days agoeff.
INTIEASweden · Tax exemption for pure and highblend biofuelsPolicyIn force

Tax exemption for pure and highblend biofuels

The Swedish scheme to promote the use of sustainable biofuels in transport has been prolongated until 31 December 2032 with an estimated budget of 1.3 USD billion (SEK 14.2 billion).    The scheme was originally approved by the Commission in November 2003 and prolonged several…

10 days agoeff.
INTIEACanada · Codes Acceleration Fund (CAF)PolicyIn force

Codes Acceleration Fund (CAF)

Launched by Natural Resource Canada in 2023,  the Codes Acceleration Fund (CAF) provides funding to support efforts to accelerate and contribute to code (or regulation) adoption, compliance and enforcement. The programme provides funding to:   • provinces, territories,…

10 days agoeff.
INTIEACanada · Energy Efficiency Regulations, 2016 - Electric motorsPolicyIn force

Energy Efficiency Regulations, 2016 - Electric motors

The Energy Efficiency Regulations set standards for several industrial products and industrial applications of products including motors, air compressors, pumps, dry-type transformers and ceiling fans.     The standards for electric motors were regularly updated, lastly in 2022…

10 days agoeff.