INTIEAUnited Kingdom · Contract for Difference (CfD)PolicyIn force

Contract for Difference (CfD)

Contract for Difference (CfD) was introduced in UK in October 2014 aiming to replace Renewable Obligations system in the UK. CfD scheme is designed to support deployment of large scale renewable projects (more than 5MW). The CfD is based on a difference between the market price…

Last changed 4 months ago.

Extracted view for reading · Original for compliance evidence

Lifecycle

  1. Effective
  2. Last change

Country / jurisdiction: United Kingdom · Year: 2014 · Status: In force · Level: National · Type: Voluntary

Contract for Difference (CfD) was introduced in UK in October 2014 aiming to replace Renewable Obligations system in the UK. CfD scheme is designed to support deployment of large scale renewable projects (more than 5MW).

The CfD is based on a difference between the market price and an agreed “strike price”.

If the “strike price” is higher than a market price, the CfD Counterparty must pay renewable generator the difference between the “strike price” and the market price. If the market price is higher than the agreed “strike price”, renewable generator must pay back the CfD Counterparty the difference between the market price and the “strike price”.

CfDs are concluded between the renewable generator and Low Carbon Contracts Company (LCCC), a government-owned company.

CfD contracts are awarded for period of 15 years.

Generators that want to participate in the CfD scheme must participate in allocation rounds.

Technologies eligible to participate in the CfD scheme are: onshore and offshore wind, solar PV, geothermal parts, hydropower, ocean power (tidal and wave), lnadfill gas, sewage gas, anaerobic digestion, biogas, biomass and CHP plants.

The CfD scheme is currently in place in Great Britain only. Until 31 March 2017, RES-E generators are able to choose between Renewables Obligation (RO) and CfD schemes. From April 2017 the CfD scheme will be the only support scheme for all new RES-E plants over 5MW.

Official source: https://www.gov.uk/government/collections/electricity-market-reform-contracts-for-difference

Source

https://www.iea.org/policies/5731

Canonical document at the regulator. Always cite this URL — not the Vantage detail page — in compliance evidence.

Related in International

INTEnergy Newsoilprice:oilprice-article-45056NewsIn force

The U.S. Army Just Called China’s Bluff in the Rare Earth War

Just recently, in a span of about six weeks, one impressive company was selected by the U.S. Army to build and operate rare earth processing facilities on an American military base…the first time the Army has ever done this. That same company closed $100 million in institutional financing, giving it a war chest of roughly $130 million. It was also formally added to the Russell 3000 Index. And it locked in MOU’s for feedstock agreements covering billions of tonnes of rare earth-bearing material from sources across Wyoming, Appalachia…

6 hours ago
INTEnergy Newsoilprice:oilprice-article-45052NewsIn force

Oil Prices Ignore the Warning Signs in Physical Markets

Oil price movements since the start of March this year have become the topic of dozens of discussions. Many have been puzzled by futures prices and why they haven’t gone through the roof given the severe disruption in Middle Eastern supply. It appears the reason is sheer optimism and a bet on market adaptability. However, there is a problem with that. Adaptability has limits. Many commentators like to compare the current oil price—and supply—situation to 2022, when Russia’s incursion into eastern Ukraine prompted an actual…

7 hours ago
INTEnergy Newsoilprice:oilprice-article-45054NewsIn force

The World’s Largest Sand Battery Is Now Online

Modern power grids require a constant, real-time balance between supply and consumption. Unfortunately, the integration of wind and solar energy makes power grids unstable due to the intermittent nature of renewable energy generation. To prevent localized grid blackouts or harmful voltage spikes, utilities are increasingly pairing renewables with battery storage and/or rapid-response natural gas plants to smooth out fluctuating supply. However, Finland has now come up with a rather eccentric method to store excess renewable energy and release it…

8 hours ago
INTEnergy Newsrigzone:https://www.rigzone.com/news/wire/australia_to_study_first_new_oil_refinery_since_60s-28-jul-2026-184235-article/?rss=trueNewsIn force

Australia to Study First New Oil Refinery Since 60s

Prime Minister Anthony Albanese Tuesday announced a study for a new refinery in Karratha in Western Australia, backed by A$4 million ($2.8 million) of government funds.

9 hours ago
INTEnergy Newsoilprice:oilprice-article-45055NewsIn force

Refined Fuels, Not Crude, Are Driving the Oil Market Crunch

Oil prices have just come off a fresh two-month high as the crude oil market has tumbled this week amid signals of de-escalation in the U.S.-Iran conflict. Despite the slump in crude prices and the extreme volatility in the past five months, the refined product market continues to tighten with refining margins at record highs because the supply of petroleum products is much tighter than crude supply. Refining margins held at record highs even as crude oil prices soared last week to $100 per barrel. That’s because global gasoline, diesel,…

9 hours ago