Lifecycle
- Effective
- Last change
Country / jurisdiction: Guyana · Year: 2014 · Status: In force · Level: National · Type: Voluntary
Renewable energy developers can sign long-term PPAs on a case-by-case basis with the state-owned utility (GPL). This includes an existing 25 MW biomass cogeneration plant and the planned 25MW Hope Beach wind farm. Following an 8.4kW demonstration project from Guyana Energy Agency, long-term PPAs are also being considered for grid-connected solar PV
Official source: http://www.gea.gov.gy/energy-development/solar
Source
https://www.iea.org/policies/5668Canonical document at the regulator. Always cite this URL — not the Vantage detail page — in compliance evidence.