INTIEAUruguay · Private generation of wind energyPolicyIn force

Private generation of wind energy

The Decree 158/012 allows industrial consumers, which generate wind energy, to establish contracts with the National Electricity Utility (UTE). The contracts are defined for three different types of generation configurations: on-site generation, off-site generation and…

Last changed 10 years ago.

Extracted view for reading · Original for compliance evidence

Lifecycle

  1. Effective
  2. Last change

Country / jurisdiction: Uruguay · Year: 2012 · Status: In force · Level: National · Type: Voluntary

The Decree 158/012 allows industrial consumers, which generate wind energy, to establish contracts with the National Electricity Utility (UTE).

The contracts are defined for three different types of generation configurations: on-site generation, off-site generation and generation in partnership with other parties.

The Decree provides 20-year PPAs for excess power at USD 63.5/MWh. The PPA price was set based on the last wind power auction immediately preceding the contract. In this case, this meant USD 63.5/MWh, the resulting average price wind auctions authorized by Decree 159/011.

Wind farms must be between 150kW and 60MW, connected to the -mid or -high voltage grid and self-consumption should account for at least 50% of the generated power.

The legislation was valid for two years or until 200MW of capacity were achieved.

The Decree 433/012 complements Decree 158/012 by establishing the price of the electricity that will be paid to the UTE by the industrial consumer/wind energy producer.

Official source: http://archivo.presidencia.gub.uy/sci/decretos/2012/05/miem_589.pdf

Source

https://www.iea.org/policies/5364

Canonical document at the regulator. Always cite this URL — not the Vantage detail page — in compliance evidence.

Related in International

INTIEACanada · National Energy Code of Canada for BuildingsPolicyIn force

National Energy Code of Canada for Buildings

The National Energy Code of Canada for Buildings (NECB) 2025 is a national model code that sets technical requirements that address the protection of the environment in the design and construction of new buildings and in subsequent alterations. The 2025 edition was published in…

10 days agoeff.
INTIEACanada · Deep Retrofit Accelerator InitiativePolicyIn force

Deep Retrofit Accelerator Initiative

Launched by Natural Resource Canada in February 2023, the Deep Retrofit Accelerator Initiative (DRAI) provides funding to organisations and projects that facilitate the development of deep retrofits in commercial, institutional, and mid- or high-rise multi-unit residential…

10 days agoeff.
INTIEASweden · Tax exemption for pure and highblend biofuelsPolicyIn force

Tax exemption for pure and highblend biofuels

The Swedish scheme to promote the use of sustainable biofuels in transport has been prolongated until 31 December 2032 with an estimated budget of 1.3 USD billion (SEK 14.2 billion).    The scheme was originally approved by the Commission in November 2003 and prolonged several…

10 days agoeff.
INTIEACanada · Codes Acceleration Fund (CAF)PolicyIn force

Codes Acceleration Fund (CAF)

Launched by Natural Resource Canada in 2023,  the Codes Acceleration Fund (CAF) provides funding to support efforts to accelerate and contribute to code (or regulation) adoption, compliance and enforcement. The programme provides funding to:   • provinces, territories,…

10 days agoeff.
INTIEACanada · Energy Efficiency Regulations, 2016 - Electric motorsPolicyIn force

Energy Efficiency Regulations, 2016 - Electric motors

The Energy Efficiency Regulations set standards for several industrial products and industrial applications of products including motors, air compressors, pumps, dry-type transformers and ceiling fans.     The standards for electric motors were regularly updated, lastly in 2022…

10 days agoeff.