INTIEABrazil · Programme of Incentives for Alternative Electricity Sources - Programa de Incentivo a Fontes Alternativas de Energia Elétrica - PROINFAPolicyIn force

Programme of Incentives for Alternative Electricity Sources - Programa de Incentivo a Fontes Alternativas de Energia Elétrica - PROINFA

The Brazilian Parliament passed Law 10438 in April 2002. Law 10438 was responsible for the creation of the Programme of Incentives for Alternative Electricity Sources (Programa de Incentivo a Fontes Alternativas de Energia Elétrica-PROINFA) among other programmes. The PROINFA…

Last changed 2 years ago.

Extracted view for reading · Original for compliance evidence

Lifecycle

  1. Effective
  2. Last change

Country / jurisdiction: Brazil · Year: 2002 · Status: In force · Level: National · Type: Voluntary

The Brazilian Parliament passed Law 10438 in April 2002. Law 10438 was responsible for the creation of the Programme of Incentives for Alternative Electricity Sources (Programa de Incentivo a Fontes Alternativas de Energia Elétrica-PROINFA) among other programmes.

The PROINFA programme is to be implemented in two stages: STAGE 1 : 3,300 MW of renewable energy (from wind, biomass and small hydroelectric sources) will be brought on stream before the end of 2007 through a system of subsidies and incentives, which draw on an Energy Development Account funded by end-use consumers through an increase on energy bills (low-income sectors are exempt from this increase). Under the PROINFA rules, the programme will be operated by Electrobrás, which will buy energy at pre-set preferential prices ("economic values" for each of the three sources) and will market "renewable" electricity. Definitive "economic values" will be published at the end of October 2003 and will have a reference value floor of 70% of the national average supply tariff. Contracts between Electrobrás and the "renewable" generator are valid for a period of 20 years, are applicable to plants that began production before 2007 and must be signed within 24 months of the publication of Law 10438. The Banco Nacional de Desenvolvimento Econômico e Social (BNDES, the Brazilian National Development Bank) will make special financing programmes available for renewables projects that are eligible for PROINFA. BNDES can finance up to 70% of capital costs (excluding site acquisition and imported goods and services) at the basic national interest rates (TJLP) plus 2% of basic spread and up to 1.5% of risk spread. Interests are not charged during construction and amortization is of 10 years. Payments are due 6 months after commercial operation. Eletrobrás guarantees in the long-term electricity purchasing contracts a minimum income of 70% of the contracted energy during the financing period, as well as a full coverage to exposure risks to the short-term market PROINFA is expected to generate 150 thousand jobs and to leverage private investments of around USD 2.6 bln. Law 10762 mandates a minimum nationalization of 60% in total construction costs, as well as a regionalization criteria, where each State has maximum limits of 20% of total capacity for wind and biomass and 15% for small hydros. Such limits are preliminary: if part of the 1100 MW for each source is not contracted, this available potential will be distributed according to the older environmental permits (all projects are required to have a previous installation licence).

STAGE II : Once the 3,300 MW objective has been met, PROINFA will target increasing the share of electricity produced by three renewable sources to 10% of annual consumption within 20 years . In Stage II, PROINFA renewable generators will be required, before December 30th of each year, to issue a number of Renewable Energy Certificates proportional to the amount of clean energy produced by the plant.

Official source: https://proinfa.enbpar.gov.br/

Source

https://www.iea.org/policies/4019

Canonical document at the regulator. Always cite this URL — not the Vantage detail page — in compliance evidence.

Related in International

INTEnergy Newsoilprice:oilprice-article-45056NewsIn force

The U.S. Army Just Called China’s Bluff in the Rare Earth War

Just recently, in a span of about six weeks, one impressive company was selected by the U.S. Army to build and operate rare earth processing facilities on an American military base…the first time the Army has ever done this. That same company closed $100 million in institutional financing, giving it a war chest of roughly $130 million. It was also formally added to the Russell 3000 Index. And it locked in MOU’s for feedstock agreements covering billions of tonnes of rare earth-bearing material from sources across Wyoming, Appalachia…

9 hours ago
INTEnergy Newsoilprice:oilprice-article-45052NewsIn force

Oil Prices Ignore the Warning Signs in Physical Markets

Oil price movements since the start of March this year have become the topic of dozens of discussions. Many have been puzzled by futures prices and why they haven’t gone through the roof given the severe disruption in Middle Eastern supply. It appears the reason is sheer optimism and a bet on market adaptability. However, there is a problem with that. Adaptability has limits. Many commentators like to compare the current oil price—and supply—situation to 2022, when Russia’s incursion into eastern Ukraine prompted an actual…

10 hours ago
INTEnergy Newsoilprice:oilprice-article-45054NewsIn force

The World’s Largest Sand Battery Is Now Online

Modern power grids require a constant, real-time balance between supply and consumption. Unfortunately, the integration of wind and solar energy makes power grids unstable due to the intermittent nature of renewable energy generation. To prevent localized grid blackouts or harmful voltage spikes, utilities are increasingly pairing renewables with battery storage and/or rapid-response natural gas plants to smooth out fluctuating supply. However, Finland has now come up with a rather eccentric method to store excess renewable energy and release it…

11 hours ago
INTEnergy Newsrigzone:https://www.rigzone.com/news/wire/australia_to_study_first_new_oil_refinery_since_60s-28-jul-2026-184235-article/?rss=trueNewsIn force

Australia to Study First New Oil Refinery Since 60s

Prime Minister Anthony Albanese Tuesday announced a study for a new refinery in Karratha in Western Australia, backed by A$4 million ($2.8 million) of government funds.

12 hours ago
INTEnergy Newsoilprice:oilprice-article-45055NewsIn force

Refined Fuels, Not Crude, Are Driving the Oil Market Crunch

Oil prices have just come off a fresh two-month high as the crude oil market has tumbled this week amid signals of de-escalation in the U.S.-Iran conflict. Despite the slump in crude prices and the extreme volatility in the past five months, the refined product market continues to tighten with refining margins at record highs because the supply of petroleum products is much tighter than crude supply. Refining margins held at record highs even as crude oil prices soared last week to $100 per barrel. That’s because global gasoline, diesel,…

12 hours ago