INTIEAIndonesia · MoE Regulation No. 34 of 2009 on Wastewater Quality Standard for Bauxite Ore Mining Businesses and/or ActivitiesPolicyIn force

MoE Regulation No. 34 of 2009 on Wastewater Quality Standard for Bauxite Ore Mining Businesses and/or Activities

Regulation of the State Minister of Environment No. 34 of 2009 on Wastewater Quality Standard for Bauxite Ore Mining Businesses and/or Activities sets out wastewater quality standards for bauxite ore mining businesses and activities in Indonesia. It aims to prevent water…

Last changed 11 months ago.

Extracted view for reading · Original for compliance evidence

Lifecycle

  1. Effective
  2. Last change

Country / jurisdiction: Indonesia · Year: 2009 · Status: In force · Level: National · Type: Voluntary

Regulation of the State Minister of Environment No. 34 of 2009 on Wastewater Quality Standard for Bauxite Ore Mining Businesses and/or Activities sets out wastewater quality standards for bauxite ore mining businesses and activities in Indonesia. It aims to prevent water pollution by regulating the discharge of wastewater from various stages of bauxite mining and processing, including extraction, transportation, washing, alumina production, and mine closure. The regulation is part of Indonesia’s broader environmental protection framework under Law No. 32/2009 and Government Regulation No. 82/2001

It stipulates the maximum levels and numbers of pollutants that may be present in the wastewater that is discharged into water sources from bauxite ore mining businesses and activities. However, a stricter standard would apply if the result of a business/activity’s feasibility study as part of its environmental license (AMDAL or UKL-UPL) requires a stricter wastewater quality standard than that stipulated in the regulation.

Wastewater originating from bauxite ore mining is required to be processed such that it does not exceed the applicable wastewater quality standard. The person in charge of the bauxite mining business/activity is required to:

conduct a study of the location of wastewater treatment points to obtain a wastewater discharge permit

record the daily discharge of wastewater at each compliance point

examine the processed wastewater for adherence to applicable standards in an accredited laboratory at least once a month

analyse the wastewater and submit reports of the result at least once every three months every year to the relevant authorities.

These obligations are relevant considerations for the issuance of a wastewater discharge permit in accordance with the prevailing regulations.

Official source: https://jdih.maritim.go.id/id/peraturan-menteri-negara-lingkungan-hidup-no-34-tahun-2009

Source

https://www.iea.org/policies/28260

Canonical document at the regulator. Always cite this URL — not the Vantage detail page — in compliance evidence.

Related in International

INTEnergy Newsoilprice:oilprice-article-45056NewsIn force

The U.S. Army Just Called China’s Bluff in the Rare Earth War

Just recently, in a span of about six weeks, one impressive company was selected by the U.S. Army to build and operate rare earth processing facilities on an American military base…the first time the Army has ever done this. That same company closed $100 million in institutional financing, giving it a war chest of roughly $130 million. It was also formally added to the Russell 3000 Index. And it locked in MOU’s for feedstock agreements covering billions of tonnes of rare earth-bearing material from sources across Wyoming, Appalachia…

9 hours ago
INTEnergy Newsoilprice:oilprice-article-45052NewsIn force

Oil Prices Ignore the Warning Signs in Physical Markets

Oil price movements since the start of March this year have become the topic of dozens of discussions. Many have been puzzled by futures prices and why they haven’t gone through the roof given the severe disruption in Middle Eastern supply. It appears the reason is sheer optimism and a bet on market adaptability. However, there is a problem with that. Adaptability has limits. Many commentators like to compare the current oil price—and supply—situation to 2022, when Russia’s incursion into eastern Ukraine prompted an actual…

10 hours ago
INTEnergy Newsoilprice:oilprice-article-45054NewsIn force

The World’s Largest Sand Battery Is Now Online

Modern power grids require a constant, real-time balance between supply and consumption. Unfortunately, the integration of wind and solar energy makes power grids unstable due to the intermittent nature of renewable energy generation. To prevent localized grid blackouts or harmful voltage spikes, utilities are increasingly pairing renewables with battery storage and/or rapid-response natural gas plants to smooth out fluctuating supply. However, Finland has now come up with a rather eccentric method to store excess renewable energy and release it…

11 hours ago
INTEnergy Newsrigzone:https://www.rigzone.com/news/wire/australia_to_study_first_new_oil_refinery_since_60s-28-jul-2026-184235-article/?rss=trueNewsIn force

Australia to Study First New Oil Refinery Since 60s

Prime Minister Anthony Albanese Tuesday announced a study for a new refinery in Karratha in Western Australia, backed by A$4 million ($2.8 million) of government funds.

12 hours ago
INTEnergy Newsoilprice:oilprice-article-45055NewsIn force

Refined Fuels, Not Crude, Are Driving the Oil Market Crunch

Oil prices have just come off a fresh two-month high as the crude oil market has tumbled this week amid signals of de-escalation in the U.S.-Iran conflict. Despite the slump in crude prices and the extreme volatility in the past five months, the refined product market continues to tighten with refining margins at record highs because the supply of petroleum products is much tighter than crude supply. Refining margins held at record highs even as crude oil prices soared last week to $100 per barrel. That’s because global gasoline, diesel,…

12 hours ago