Lifecycle
- Effective
- Last change
Country / jurisdiction: India · Year: 2023 · Status: In force · Level: National · Type: Voluntary
INR 22 billion (USD 0.25 billion) over 5 years. A first tranche, launched in July 2023, was awarded to eight companies for 1.5 GW/yr. Two buckets of technologies, one (1.2 GW/yr) for any technology with minimum and maximum bids of 100-300 MW/yr and the second one for indigenous producers (0.3 GW/yr) with a max bid of 300 MW/yr. The annual incentive formula has two correction factors for specific energy consumption of the electrolysers; and for the domestic value addition
Official source: https://jmkresearch.com/seci-concludes-the-rs-4440-crore-electrolyser-manufacturing-component-of-its-sight-program/
Source
https://www.iea.org/policies/27889Canonical document at the regulator. Always cite this URL — not the Vantage detail page — in compliance evidence.